Ep #14-2024 - May 11-12, 2024 - (2hr 9m) - Critical Path, Page 348 to 369
Вставка
- Опубліковано 14 тра 2024
- Continuing our reading and discussion of the Critical Path, beginning at page 348 to page 369.
Topics: Events from 4,000 BC to 1923. “Doctrines of Discovery”, “Letters of Patent”, “Devine Right of Kings”, “Manifest Destiny” and Einstein’s Relativity and the Bucky Call.
THE CHAT FOR THIS CALL:
00:26:25 Steve: The 5000-year-old 626-hectare archaeological site of The Sacred City of Caral-Supe is situated on a dry desert terrace overlooking the green valley of the Supe river. It dates back to the Late Archaic Period of the Central Andes and is the oldest centre of civilization in the Americas.
00:27:09 Steve: Susa alongside its allies is invaded and destroyed in c. 4200 BC. The city of Anshan is founded circa 4000 BC, and alongside Susa begins to separate itself culturally from the West, developing the lands with its newly integrated peoples into a Proto-Elamite cultural and economic revolution.
00:27:50 Steve: 4000 BC-First neolithic settlers in the island of Thera (Santorini), Greece, migrating probably from Minoan Crete. c. 4000 BC-Beaker from Susa (modern Shush, Iran) is made. It is now at Musée du Louvre, Paris.
00:28:19 Steve: Around 4000 BC, people in the Southeastern Woodlands of North America began to exploit wetland resources and create large shell middens along rivers. The earliest earthworks along the Mississippi River during this time were small conical burial mounds.
00:49:12 Steve: Letters patent (always in the plural; abbreviated to LsP by the Crown Office), in the United Kingdom, are legal instruments generally issued by the monarch granting an office, right, title (in the peerage and baronetage), or status to a person (and sometimes in regards to corporations and cities).
02:16:01 Steve: Chronos vs. Kairos
Chronos ("Left Brain" - "thought")
Refers to chronological or sequential time, such as the time of clocks and calendars. Chronos time is time that needs to be constantly tracked and controlled, and examples include "don't waste time" and "time is money".
Kairos ("Right Brain" - emotion)
Refers to a good or proper time for action, such as a moment when time stops and everything feels possible. Kairos time can be something simple, like taking a walk to clear your head, and it requires releasing some anxiety around chronos time. The word kairos comes from an ancient Greek term that translates to "right time" or "opportune moment".