HS2 Birmingham area uncut 2024

Поділитися
Вставка
  • Опубліковано 26 чер 2024
  • My channels first uncut footage in 4K
    Sitting at the heart of the high-speed rail network, HS2 connects Birmingham City Centre to London and the rest of the network from the new Curzon Street Station which will be one of the most environmentally friendly stations in the world.
    The route leaves the station on viaducts through the city to Washwood Heath. This is where the new rolling stock maintenance depot and the network control centre will be built.
    The HS2 railway then moves into a tunnel emerging east of the A452, before heading south at Castle Vale towards London.  Within Birmingham, we will be building one tunnel at Bromford, two viaducts at Saltley and the River Tame, and a major depot at Washwood Heath. Three more viaducts through Digbeth and the new HS2 Curzon Street Station will also be constructed.
    MusicTunnel Boring Machine (TBM) Mary Ann is being used to create HS2’s Bromford Tunnel, between Water Orton in North Warwickshire and Washwood Heath in Birmingham.
    This is the fourth twin bore railway tunnel to start construction on Britain’s biggest infrastructure project. The 5.6km (3.5 mile) tunnel will take high speed trains into Birmingham as they approach Curzon Street Station in the heart of the city.
    Mary Ann was launched on 14 August 2023 Music Bensound.com
    Royalty Free Music: www.bensound.com
    License code: WPOMKIBWZY9MF3BY
    Music by: Bensound.com/royalty-free-music
    License code: PLXJ6IDWOCKHAYVR
  • Розваги

КОМЕНТАРІ • 4

  • @Jamie92208
    @Jamie92208 19 днів тому +1

    Thanks for that. I realise that this is the uncut version. I presume that most of the Delta Junction site is included along with the Interchange station site and at the end,I think, Water Orton and the start of the Bramford tunnels. There are some real signs of progress. Captions would be. Very helpful. Thanks again.

  • @dominiccottrill2387
    @dominiccottrill2387 19 днів тому +1

    Great video. I just noticed 3:50m in you cut to Balsall Common. Some hi res closeups of that area are needed

  • @willhemmings
    @willhemmings 18 днів тому +2

    Looks like winter, cold and wet