Use the code ‘AGLIVE’ to get Our Courses at Maximum discount! Hurry Enrol Now : bit.ly/40kxZXK UPSC IAS Live GS Foundation P2I Batch 3 : bit.ly/40kxZXK Admissions Closing on 18th November 2023 | Daily Live Classes at 6:00 PM Hurry Enrol Now : bit.ly/40kxZXK UPSC IAS Live GS Foundation P2I Hindi Batch 3 एडमिशन की अंतिम तिथि 16 नवंबर 2023 | बैच का समय शाम 6:00 PM Hurry Enrol Now : bit.ly/3Sjac8J UPSC IAS Live GS Foundation P2I English Batch 3 Batch Starting on 17th November 2023 | Daily Live Classes at 6:00 PM Hurry Enrol Now : bit.ly/49byWWt UPSC IAS Prelims to Interview ( P2I) 2024 Live Advanced Batch 5 Batch Started on 30th Sept 2023 | Daily Live Classes at 6:30 PM Hurry Enrol Now : bit.ly/3PTgcU9 UPSC IAS (Mains) LIVE Optional Batches : bit.ly/3DrHsmw (PSIR, Sociology, History, Geography, Pub Ad, Anthropology, Mathematics, Hindi Literature)
Biggest corruption is happening in west bengal right now. I request you to research on that. Every government sector, mp, mla local leaders are under scanner. State machinery is creating hindrance against ed,cbi and nia investigations. Court monitored investigations are conducted throughout the state relating to cow smuggling scam, teacher recruitment scam, coal smuggling scam, sand smuggling scam, health scam and many more. Everything govt is under suspection. Huge unexpinable wealth of mps and mlas are also under radar. If you can ,then make a video on that. Thanks
KCR Changed the previous design for his own benefits. Even SEA level didn't considered in New plan. Old plan costs only 30k crores, but new project costed 1lakh crore + water Distribution under construction costs 40K crore + 13k core EB/year.
I am from Hyderabad, Telangana. Not sure completely on corruption behind it and I support for enquiry. But early 2016 we have lot of water problems getting one day a week is also difficult and even ground water was not available after going 1000 feets. After completing the kaleshwaram project our water problems are completely solved alongwith ground water was increased and now water is at 200-300 feets. Kudos for solving the problem but if any corruption behind is there need to be investigated.
@@raavanbhai2052 do you know how ground water is stored and diverted to other regions? Kaleshwaram is not a single project is a combination of 23 projects, 20 new reservoirs. How does ground water increase? huge water sinks from reservoirs to atleast 50kms radius. Thus huge ground water levels have increased. whether it has corruption or not, people have benefitted.
Water was available bcoz there were enough rains. Most barriages are already started getting damaged and very soon any benefit received will not be there anymore in the coming years
@@sunilkumarcheruvu So you are saying from past 40years rains are not adequate only after 2019 rains are plenty. We know how much water scarcity existed before lift irrigation. False allegations can made but Statistics never say wrong. I do not support to the cracks/any corruption associated to the project but with the lift irrigation we are getting water alternative days and earlier not even a day on week and due to sufficient water getting from government lifting from home bore's are reduced eventually ground water has increased.
Kaleshwaram project have truly benifited to Telangana in irrigation , but due to sundhila barrage most of the living areas in near by cities , villages were suffering with heavy floods from last 2 years .. they didn't even expect it earlr how it is going to lose for common people too.. & also illigal house construction permissions also made it more effective for common people during rainy season...
I am from this area...kaleshwaram project means not only one barrage and there are three barrages on godavari and so many pump houses , tunnels and balancing reservoirs, distribution networks etc..the total cost so far incurred is about 80k lakhs only so allegations about 1 lakh crore is politically motivated.. the CWC engineers also visited the project during construction and described it as an engineering marvellous...so keep aside the political leaders view and let some technical experts decide the status of the project condition purely on the basis of technical grounds...the water availability has increased enormously in North Telangana due to this project and farmers are benefited
Improper grouting of subsoil is main reason for the problem. It can be rectified by grouting after re-constructing damaged piers. After grouting its life time will be definetely more than 50 years. Further, it is essential to provide sand dune along down stream side upto one meter below bottom level of gate opening. This project must be contined in the public service for benefit of farmers.
I didn't understood anything which you commented but I gave a thumbsup. I believe most of them who liked this comment belongs to my category, please explain the terms clearly while you are sharing such info
Here whole kaleshwaram is not failed. It contains 3 barrages and many pump houes... Etc only 1 barrages 6pillers are sunk it will be repaired by L&T soon. It irrigates lakhs of acres in telangana even it provides drinking water to Hyderabad and through kaleshwaram in coming days Hyderabad residents are going to get water 24/7
The NDSA report is given in 2days without any soil testing, etc. So it's not a fare report and just a political agenda report. However, it's true that there is a problem in one of the pillars of the project which L&T should analyse and repair asap. Btw Kaleshwaram is not a very small project it has many sections and any major projects would go through rough phases like this. Even Nagarjuna Sagar, Prakasham Barage, Srisailam etc did have technical problems which are documented. Trust me people are talking about cost mentioning about it's better to give farmers money that the maintenance cost. But if we do not have water if a bad season comes-(I wish it should not happen) then money can't buy water. Ground reality is farmers are now able to grow 3season crops in Telangana which was not the case under United AP. Everyone does know the fact that in our Nation, not even one project would happen without giving commission to political parties. So, in one way I am atleast happy that BRS completed the project even if they eat some percent of commission in the process.
ok as per your opinion taking some percent as commision for completing project is right .Firstly you shouldn't say it has commision, it is like looting public money for their personel gains.Being a people representaters politicians should work for the welfare of people with what ever salary the govt is paying them.They should not divert the project funds for their pesonel gains ok.
Bro, the cost per acre of irritation is 70 to 80k. Whatever the reason is, farmers also, it's costlier than using kinley or bisleri water bottles. And every year the current bill of this one project is more then current bill of all other govt offices. And it occupies nearly 2% of budget. It's practically impossible.
@@marripallinikhil3197who told you it cost ₹80000 per acre, just consider when water was available in Sri ram sagar and yellampally....why we need ₹80000 per acre?
@learnandexplore7697 sorry I was wrong, I forgot what I learnt. I wrote the same in main chat section. I'm just copying the same to you. More details 3 barrages 1531 kms of gravity canal 203 kms tunnels 20 lifts 19 pump houses 20 reservoirs Project aim : 1. Provide irrigation to 45 lakh acres. (area of telengana 280 lakh acres) 2. Stabilisation of 18.83 lakh acres. ( which already have irrigation facility) 3. Drinking water of 40 TMC. 4. Industry 16 tmc Achieved 1. Only 18.25 lakh acres got new irrigation against target 45. 2. Stabilisation 18.83 lakh acres. It already have irrigation facility. 3. Drinkimg water, no data on 40 tmc. 4. Industry water no dats. Total water availablity 240 TMC Irrigation 169 TMC Total cost 1.3 lakh crores. Lets take it 80k crore only which govt expected initially. 169 /240 tmc for irrigaion. Approximate cost for irrigaion. (169/240)*( 80k crore / 37 lakh acres) = 1,52,000 rupees per acre. But project is 1.3 lakh crore this makes it 250k per acre. Cost of irrigation per acre from kaleshwaram = rs 250k Now please say how the project is a sucess. Note: I took 35 lakh acres, but new ayacut is 50% only. If you consider the same, it becomes 5 lakh per acre. If you want reference of notes, have this link, I uploaded the material. I'm preparing for tspsc exams, I'm not saying any idiotic need channel data. As yohtube is not allowing links I used space. Copy same. You will get all reference. uploadnow . io/f/9XDqnR4
Present CM KCR and his family made big time Money in this Project . Its Lift Irrigation Project that means water has to pump from ground to 350 to 400 meters up millions and millions cubic liters of water has to pump which cost of thousands of crores of money for Electricity. In the name of Project Govt will take kick bags from Electric suppliers per Unit. its true coz i belong to Telangana.
I also belong to telangana.. You get the evidence and give to court they will arrest congratulations in advance if you get the evidence as of now the biggest party in India has not getting evidence to arrest the tallest leader in telangana
@@logn-yt7037 I pity on myself to reply. And I am sorry to explain them who can't digest and ready to bark against fighters. Kcr is a proved leader who struggled for separate state and made history that can't be changed I feel proud to admire such a good leader. You called me a dog.. by that I can guess the way you are grown up by your parents. One more thing when you can't appreciate ones success you will never enjoy yours.
In the process of fast development, some small issues have come up. These will be rectified in coming days. This project has helped so much that Telangana has become rice bowl of India beating the other states and also helped in keeping Telangana at the top position in per capita income compared to any other state in India. Btw farmer suicides are least in Telangana now. It’s too early to say that it is a failure just before elections.
Desh me kuch achha hone par pura khayanad use failure dikhaane ke jaldi me rehti hain… achha Chalne par uska benefits kya the koi baat hi nahi kii… World’s largest lift irrigation project pe koi charcha nahi hua tha. Anyway these three barrages are very small part of Kaleshwaram project. Mistakes will be rectified.
@@venkyk4812 Which is the rice bowl of India? State of Andhra Pradesh Answer: The State of Andhra Pradesh is known as the rice bowl of India. Rice makes up to 77 percent of the total crop production.
@@venkyk4812 Which state is called Egg bowl of Asia? Andhra Pradesh is known as the egg bowl of Asia because it is the largest producer of eggs in India.
Im local from Telangana, firstly we think this is the biggest irrigation project & it is useful to whole Telangana, but the reality is already we lost 1 lack cr. In 3 years it is going to be a world tourist place for engineers & public, to know how not to construct the irrigation project.
The construction issues can be fixed. Political parties are spreading false information before elections. This project is actually very beneficial to the people of Telangana.
KCR Changed the previous design for his own benefits. Even SEA level didn't considered in New plan. Old plan costs only 30k crores, but new project costed 1lakh crore + water Distribution under construction costs 40K crore + 13k core EB/year.
Have u ever heard a term called ‘Inflation’ ? Project was shelved in 2009 and it was revived in 2019. So that’s a decade , so obviously the cost will go up. Thats the same with every other project on India
@@Peoplesays365 Inflation one of factor to loot public money, The steel ,Cement ,Raw materials costs are not much changed.this project 4 times cost escalation purely looting public money our Telangana jaati PIta.
@@aashwinjasrotia5233 for real bro? Back in 2007 when we constructed a house it costed us around 31 L , thats incl labour , cement , steel etc. in 2021 we added first floor and just a single floor costed as around 14L(its just 2 rooms again) what part of India r u living in? My dad is screaming everything is going up and you’re saying inflation is not that much? Kamaal hei bhai
@@yedlapallirao3517 its the main factor. Lekunte vaanki cost penche loophole dorkadi kada. Sandhu dorkindi eskunnadu. A detailed CBI investigation should reveal their corruption.
I'm from telangana and before kaleshwaram project our village farmers are able to irrigate 1 crop per year But after this project we are able to irrigate all te year even in summers before 5years our lands are 4-5lakhs per acer and now in 2023 they are 1 cr per acer ❤🎉 we are proud of our x chief minister CM KCR❤❤
even it get repaired and available for operations, the cost to provide water for each acre requires 50,000 rupees which is just utter foolishness. instead give that money directly to farmer. kaleswaram gonna be an unbearable liability for telangana
you know something ,even you give money to farmers they wont eat money theyy eat rice and if you cost water them we have to import rice for telangana region,imagine a draught like situation ,or a war like situation then how india will survive without rice or food if we cant get rice from othr countries . see kaleshwaram is not for food or industries it is giving life to telangana economy ..you need to have a broad knowkedge to understnd kaleshwaram . i can describe you contact me
It's a flaw in Discovery Channel's Merit system...they should have made a Documentary on How all BRS Leaders turned into billionaires in a span of 10 Years! The creation of The Lovely State Called "Telangana" has been beneficial for one family and I am not uttering any names over here!! Because the people of Telangana Know it very clearly!!
I hail from Telangana. I can confidently say that just for the sake of doing corruption this govt has come up with this plan. This project utterly fails in cost benefit analysis. The contractors and politicians looted major chunk of finance. Further the quality of this project is abysmal.
Karchu avtundi ani em cheyakunda undamu kada.. once money starts liquidating in individuals accounts, 2000cr of power cost per year, isn't a big deal for entire state.
How do you explain the following without the Kalaeshwaram Project ? 1. Telenagana is the highest producer of Rice in India, it was in 14th place before the project 2. Every house in the state has drinking water 3. Water Level in Telangana has increased by 6 meters 4. There are no farmer's suicides today in Telangana 5. The Green cover of the state increased by 7% - Highest in the country The project was built by reputable L&T and all the repairs will be covered under warranty so there is no burden on tax payers
@@uditraj6518before this project in my home village there is no water,underground water also no there. After telangana formed this party within 2 yrs we received water to every house. But they did so fast it is marvaleous to complete this project so quickly without politics. So i wont complain. If any fault in dam it should be done by the manufacturer or construction company who taken tender.
1-This is not happened by the Kaleswaram project,it because of high rain fall in last 7 years 2-Mission Bhagiratha water not useful for drinking,ground reality 3-ground level water increased by heavy rainfall 4-Telangana state becomes number 1 in farmers suicide,check the reports online
Telangana ground water levels increased, biggest rice producer in the country after the project, no water shortage for Telangana and Hyderabad after the project and one of the lowest debt to gdp ratio in India, much better than Modis Gujarat in per capita Income, Hyderabad had the best yech district in India
I'm from Karimnagar... The Project has done only for 30% commission to kcr, not only this even karimnagar granite mafia, sand mafia is also there😢 Cm's son is IT Minister, Cm's Daughter is ex MP now she is MLC, Cm's nephew is Health and finance minister... There are so many biname's are working under them like Megha constructions, My home etc..
Usually politicians take commissions from under construction projects but KCR constructed this project to take commisions 😂. Even 10% of 1L cr ki 10,000cr 😮
I'm from telangana & points are as follows 1) project cost is 85k crores not 1lac crores 2) without emptying the reservoir no one can submit the final investigation report 3) All state & central agencies had given clearance, so there cannot be any scope of errors. This is a clear-cut political blame game.
Over all it's very much needed project, might have some technical issues which can be solved. When we such a big project in short time naturally some errors may occur. Instead of pointing out be happy and appreciate the government who has dared and completed project in short time . Much better compare to any state government.
Actually this incident was happen in many other dams in india . So these problem can be resolved by these dam there are so much of benefit like drinking water agriculture industries. And one more thing kaleshwaram is not only mediagada its 3 barrage 16 or 18 pump house and many links
Before the motors were sunk and now dam quality raises questions on design and functionality of whole project Moreover whole project runs on lift irrigation offering electricity burden moreover to the project was not fully operational to say telangana ha benefitted from it And interests got on kaleswaram project are at skyroof a burden on state exchequer Can check official stats of govt
The value of Kaleshwaram project will be only realised when the state faces low rainfall or drought. Its a great project irrespective of its maintenence costs.
I am from telangana and we understand the value of kaleswaram project bring us drinking water. U have absolutely know idea and u giving us only news without any credible sources. Pls learn from thinkschool to make good case studies instead of wasting ur and ours time.
I am resident of rural part( Thorrur) of warangal district Telangana, in my village and near by my Villages there is SRSC canal which was digged in 2007-2008 when i was in 9th or 10th I haven't see single drop of water except raining season, but after kamleshwaram project it is floating full of water, in covid 1 and 2 we use to swim in those canal, i will not agree Telangana didn't benefitted, it gave huge water supply for farmers, i also agree there might be some corruption KALESHWARAM IS REVOLUTION
Its not built by some binami or a close aid of KCR. Its built by L&T which is one of the most trusted companies in the world. That mistake is caused by sinking of the piers and not due to lack of quality.
the projects consist of many barrages in that one barrage is damaged which consists of 89 pillars and in those 6 pillars are damaged. Maybe it is due to deficiency of quality but the ground reality is that 80% places of telangana is depending on this kaleshwaram project water.
@studyiqofficial 80K crore Project mein 1 Lakh scam kaise hote hai bhai. 80 K crore worth structures can be seen on field - barrages, canalas, reservoirs and tunnels and pump stations.
That's the logic of opposition 😂 They can make money out of thin air
11 місяців тому+36
The changing trends in UPSC CSE mains has clearly brought out the relevance of interlinking multiple topics of GS subjects. These case studies are specifically designed to build your analytical skills and give a bird's eye view of the topic. Do follow this entire playlist for the repository of these videos. In 2023 UPSC Mains examination multiple questions were easily answered by merely watching these videos. ua-cam.com/play/PLpuxPG4TUOR4ZFlXVEMUNP_r8gOhyBL0I.html
Nobody (except officials) is allowed to see the project from more than a year. This goes to show how telangana govt hiding its failed project ever since it submerged last year. The project was designed by kcr, not engineers. National media should focus on this matter and bring the truth out.
Yes , this project may have solved many problems but no one can deny that there is no corruption is being done by the top political leaders of Telangana or at least say any state
Kaleshwaram project is like Hambantota project in Srilanka… financially not viable… but wondering what central government was doing when Kaleshwaram construction was going on… Obviously auditing would have done
No project will be viable in Telangana if you check the econimcs 🤷🏾♂️ State is above the sea level up 600 meters . Only lift irrigation projects is the only solution
Am from telangana.we (coman man ) thought its fraudest project in the world .almost 1lack crore spend .once medigadda crack down and fail.people are completely confussion because of its public money
StudyIQ's research is half boiled. Kaleshwaram changed the face of Telangana's agriculture, drinking water, forestry, underground water levels and drastically reduced ensuing out of pocket costs of farmers for digging borewells etc. The benefits are uncountable, and even the financial cost is easily repayable by generation of electricity and improved fishery sector. Calling it corruption is akin to calling India's independence a sham because it got bad politics today.
@@crazystuff6760 literally every other state in the country is at the brink of drought, while being at the brink of floods every monsoon. How delusional are you to say this is a coincidence?
Impossible project has been completed within 3yrs and it is useful for cultivation among 50% of Telangana. It is a life for Telangana water drout area. Kcr is a superb visionary chief minister
Idea is good but project shouldn't be a white elephant to govt. I think instead going large scale lift irrigation project they should build a pilot project and study the viability.
If Kaleshwaram is scam, Then dams built by centre are also scam. Any construction will have some Repair and modifications that needs to be done. Centre didn’t gave 1 Rupee to that Project by the way.
This is propaganda video without reality ..this project as helped water to drought area ..this is innovative project ..same thing is done in China on Brahma putra river , Afghanistan near Tajikistan border , on Nile river near ethopia and Egypt border. In israel and Jordon border , so commenting on the project with out reality its good project needs time for results ..
This project had been done Industry stalwarts like L&T , MEIL, etc. So let enquiry be on this companies , commission to politicians will be given by the companies who have done the projects
*I am from Hyderabad first and foremost BRS party is free from corruption just because of little part of dam collapsed you can't alleged the chief minister of corruption it might be negligence of engineers since the formation of Telangana we have free water24 hours electricity. In 2024, he is going to win by the high majority*
kaleshwaram barrage nahi Medigadda Barrage hey, kaleshwaram is a project of 4 baraages and thousands of kilometers of canals, underground tunnels and 20 pump houses and nearly 100+ reservoirs of various sizes
Kaleshwaram project kcr family ka ek Paisa lootne ka tareeka tha aur lootne me safal rahe he vo log. Aur practically cost benefit analysis dekenge to cost aasman choota he aur faida earth core me he. Isse accha groundwater borewells behetar he, cost-effective he. I think this will clear doubt regarding KLIP project.
People are forgetting about power bills every year which will cost 10k crores, they can follow Anna Harare model and improve ground water with much cost effective way, I would the state had invested such money on solar energy and have saved 1000s of crores every year for state and can have been used to build agriculture wearhouses, other ecosystem for farmers to thrive...
good analysis, actually i am a civil engineer in my opinion it is a failure in cost benifit ratio incomplete project till now mostly the lifted water again released into river due to flood rise in river when there is a chance for gravity canals & reservoirs but only for commissions and percentage opted lift irrigation. many doubts in quality, transperency, maintenance cost ? if detailed investigation intiated it will be a indias largest scam.
Its just an accident, its really very helpful for farmers and people of the state, people those are calling it failed project are jealous of Telangana's Progress. And i am not a supporter of Trs/Brs
😅😂😅 You are a Supporter of BRS. The Kaleshwaram project actually doesn't have any storage capacity it's just a barrage which stops water flow and lifts water and again puts the water into the same godavari river not into fields 😅😂😅😂😅 So first do some research about the project
It will not make sense now, Telangana is close to water shortage. When the situation comes no one will compensate or debate on this. As I see the Telangana government is building an electricity generation station, on time being it will reduce price. Think guys water cannot be priced.
Dubai is buying water it cost more than anything think!! It is a good project, may be it has its own problem. Let's solve those problem instead blaming wholesome
Total cost of the kaleshwaram project is around ₹1.10 lakh crore As per the agreement, the PFC is supposed to lend ₹37,000 crore, while the REC would lend another ₹30,000 crore for the Kaleshwaram project. Who can one steal 1lac crores from 1.1 lac crore project.
I'm from Karimnagar Telangana,This project has helped Telangana to overcome its water scarcity...there may be some technical issue...flaw but it will be repaired ...bringing up this issue before elections is purely political tactic by National political parties to defame regional government
Kaleshwaram is the life line of Telangana state. After 2014, the state government rennovated many lakes, pounds in the state and all are interlinked connected with each other. When it launched everyone appreciated as a marvelous engineering. There should be some pros and cons as it's a world largest lift irrigation project. The real usage of this project can be understood in continuous drought years. Money can't buy food. Apart from political blames, this project truely needy project for telangana. Another project Palamuru have to complete in time. So that Telangana farmers can do cultivation throughout the year
Please correct your data. The total project cost it self is 88000 crores. We r getting water because of this project. Medigadda project part of KLIP is 1900 odd crores. KLIP consists of 1000 s of kms pipeline and three big projects and largest pump house in the country.
I am from Telangana i know how agricultural was before 2014 and after 2014 and recently Telangana became rice bowl of india any one can check fci site abiut rice production in Telangana befores 2014 i mean it was ap and after supperation and kaleshwaram and next yes correction may be happened but central govt should ro enquire on it
For KCR and his party Telangana is limited to Hyderabad, like Uddhav Thakare (Mumbai) beyond that there is no development at all. If you keep minority appeasement beside the KTR is far better to anyone else particularly for Hyderabad, KCR must work on development for the rest of the Telangana.
Im local to Telangana.. This project is like a oxygen for farmer's Telangana's farming production increased up to 4 times. Ground water level increased Telangan is the only state which provides drinking water to each and every..home. 24 hrs free electricity is provided to the farmers There are many welfare schemes for the development of farmers.. Telangana is top in GDP.. Telangan is top in IT Exports KCR is a visionary leader .. Brother before making any video or mentioning any tag lines pl do some home work.. politics are different then ground reality.. My birth place is Sri ram sagar project.. it was almost dried up because of constructing many other projects in Maharashtra. Govt planed to do reverse pumping from kaleshwaram project SRSP will also get water. This project was appreciated world wide .. but bad luck politics are politics .. I request you to do detail research... about Telangana's development in last 10 years..
How did this turn into the largest corruption? Have you got any official documents or evidence? Kaleshwaram cost 92 thousand crores to build in total. When the total cost was ninety-two thousand, how can corruption amount to one lakh crore?
I am a Telanganite.. I am native of Hyderabad.. Prof. K. L. Rao wanted to link Gan ga- Cauvery river.. Passing through draught areas of Vidherbha, Telangan and Rayalaseema and chennai.. The project was rejected by the then central Government.. But today at least KCR had the guts to do such a difficult and impossible task to supply water and cater to the needs of the state and especially Hyderabad.. which is drastically expanding due to IT sector and other companies... There is no project in India which has not involved in corruption.. But atleast getting suficient water... It is obvious that funds were not released from Central Government to the state.. Step motherly treatment.. I can't eloborate much..
People Benefitted by this project: 1. BRS politicians 2. Kachara Family 3. Contractor 4. Irrigation Officials - (Dinner in Falaknuma palace) Losers: People of Telangana.
I am from telangana, thank you for giving a valuable information about kaleshwaram project. But please please make video with true information. kaleshwaram is not only medigadda barrage it contains so many tunnells, barrages, dams, etc. how can a NDA government give a report within 2 days. how it will be possible to give a report on the cracks of medigadda barrage. dont they have patience to collect soil samples and project detailed report. without collecting the soil samples how it is possible to make a report. without knowing all these things before checking to the project a report will be made within two days. for example in secunderabad a building is unfortunately collapsed, to make a report upon this incident, it taken one week of time to give a detailed report about the incident. for one building it will take one week to make a report. THEN HOW MUCH TIME IT WILL TAKE TO KNOW THE REAL TRUTH BEHIND THE INCIDENT OF MEDIGADDA BARRAGE. it will take atleast a 6 months of time to know the real truth behind the incident of medigadda barrage. PLEASE DO THINK YOURSELF. please make video on the false report of MEDIGADDA BARRIAGE. and give the true information about the kaleshwaram project. ONE THING I WANT TO ASK THE OPPOSITIONS i.e the project cost is 80k crores then how 1 lakh crore scam will happen. it means the project is built with ZERO rupees. and also mean that 1lakh crore is swallowed by govt. PLEASE KNOW THE TRUTH, BELIEVE TRUTH, SAY TRUTH to the youth of the nation.
@@pulipakasrikiran9307 aavakasam untey evadina maatladthadu bagupaddaniki bagucheyadaniki maatram chala medhavulam ani cheppukune vallu kuda Hyd la illu konukkoni tv debate lu ichukunta unnaru kani evadu mundhu undi poratam cheyale.. Iga vallu suggest chesaru place antava.. CWC gaddi pikinda project place ki sambandhinchina vishayam lo
Use the code ‘AGLIVE’ to get Our Courses at Maximum discount!
Hurry Enrol Now : bit.ly/40kxZXK
UPSC IAS Live GS Foundation P2I Batch 3 : bit.ly/40kxZXK
Admissions Closing on 18th November 2023 | Daily Live Classes at 6:00 PM
Hurry Enrol Now : bit.ly/40kxZXK
UPSC IAS Live GS Foundation P2I Hindi Batch 3
एडमिशन की अंतिम तिथि 16 नवंबर 2023 | बैच का समय शाम 6:00 PM
Hurry Enrol Now : bit.ly/3Sjac8J
UPSC IAS Live GS Foundation P2I English Batch 3
Batch Starting on 17th November 2023 | Daily Live Classes at 6:00 PM
Hurry Enrol Now : bit.ly/49byWWt
UPSC IAS Prelims to Interview ( P2I) 2024 Live Advanced Batch 5
Batch Started on 30th Sept 2023 | Daily Live Classes at 6:30 PM
Hurry Enrol Now : bit.ly/3PTgcU9
UPSC IAS (Mains) LIVE Optional Batches : bit.ly/3DrHsmw
(PSIR, Sociology, History, Geography, Pub Ad, Anthropology, Mathematics, Hindi Literature)
Biggest corruption is happening in west bengal right now. I request you to research on that. Every government sector, mp, mla local leaders are under scanner. State machinery is creating hindrance against ed,cbi and nia investigations. Court monitored investigations are conducted throughout the state relating to cow smuggling scam, teacher recruitment scam, coal smuggling scam, sand smuggling scam, health scam and many more. Everything govt is under suspection. Huge unexpinable wealth of mps and mlas are also under radar. If you can ,then make a video on that. Thanks
1acr ko water lifting kornikelie 50000/- rupees expensive
@@ramana080 that's correct
KCR Changed the previous design for his own benefits. Even SEA level didn't considered in New plan. Old plan costs only 30k crores, but new project costed 1lakh crore + water Distribution under construction costs 40K crore + 13k core EB/year.
I am from Hyderabad, Telangana. Not sure completely on corruption behind it and I support for enquiry. But early 2016 we have lot of water problems getting one day a week is also difficult and even ground water was not available after going 1000 feets. After completing the kaleshwaram project our water problems are completely solved alongwith ground water was increased and now water is at 200-300 feets. Kudos for solving the problem but if any corruption behind is there need to be investigated.
Groundwater increased due to rainfall, kalleswaram project is in edge how groundwated increaaes across entire state
@@raavanbhai2052 do you know how ground water is stored and diverted to other regions? Kaleshwaram is not a single project is a combination of 23 projects, 20 new reservoirs. How does ground water increase? huge water sinks from reservoirs to atleast 50kms radius. Thus huge ground water levels have increased. whether it has corruption or not, people have benefitted.
@@IndianCommonMan36 correct
Water was available bcoz there were enough rains. Most barriages are already started getting damaged and very soon any benefit received will not be there anymore in the coming years
@@sunilkumarcheruvu So you are saying from past 40years rains are not adequate only after 2019 rains are plenty. We know how much water scarcity existed before lift irrigation. False allegations can made but Statistics never say wrong. I do not support to the cracks/any corruption associated to the project but with the lift irrigation we are getting water alternative days and earlier not even a day on week and due to sufficient water getting from government lifting from home bore's are reduced eventually ground water has increased.
This project has benefited alot to telangana… we used to get water once a week.. but now water problem in my society is solved…
Telengana need this project. Its really helpful for farmers. Ground water us realy very low in Telengana
That's because of rainfall and waterponds bro..I am from nalgonda..my side no project s..still we get low level ground water because of rains
Kaleshwaram project have truly benifited to Telangana in irrigation , but due to sundhila barrage most of the living areas in near by cities , villages were suffering with heavy floods from last 2 years .. they didn't even expect it earlr how it is going to lose for common people too.. & also illigal house construction permissions also made it more effective for common people during rainy season...
😂😂near by villages still did not get water..no water canals..first time seeing a project without canals
@@humanity947 can you say which village doesnt have water?
@@venkatsiebel canals yekkada vunnayo nuvvu cheppu bro..yenni t.m.c water store chesi ...canals tho esthunnaru?
Im a local from karimnagar,kaleshwaram is the best project for Telangana,all agricultural lands are now green here due to kcr government ❤
U sounds more like a kcr supporter😂
Cost benefit analysis😅😅😅
@@bullwhite9695plenty of water is available now for farmer's ,so no need of cost analysis
Cost benefit analysis need to be done on whole life of the project. Not on 3 or 4 years
A MLA in his party had nothing when he elected and the twist is that now he have 1000plus cr property
Telangana vachhindhi ee andhu koraku kadha, Telangana Properieatary Rights okka Party tana ney unnai kadha mari!
Can you name him?
@@ravitejathestranger5587 Balkan Suman chennur ex MLA sand mafia
Are you talking about krantikiran 😅
Even a small ward member and counselor has 10-50cr. After this corrupt government
I am from this area...kaleshwaram project means not only one barrage and there are three barrages on godavari and so many pump houses , tunnels and balancing reservoirs, distribution networks etc..the total cost so far incurred is about 80k lakhs only so allegations about 1 lakh crore is politically motivated.. the CWC engineers also visited the project during construction and described it as an engineering marvellous...so keep aside the political leaders view and let some technical experts decide the status of the project condition purely on the basis of technical grounds...the water availability has increased enormously in North Telangana due to this project and farmers are benefited
KCR suppoter spotted
Agree with your in detail explanation but a question who benefited so far with this project after spending huge public money?
You know ....every year maintaince coratct is 6000 crores,,,,spending lot money for nothing
Andhra people are so jealous of telangana development
Kcr is a best cm in India’s history
With almost no riots and best development in state
Initial anticipated cost: 80k crores
Final cost : 1.55lakh crore
Overall cost with interest payments: 1.8 lakh crore
Initial 36k Crores
😱😱
That's corruption of trs
BOT BOT BOT!!
You missed one thing....Evey year maintaince cost 6000 crores of public money
Now Telangana became highest ground water in the country because of kamleshwaram man😊
Even discovery channel has also removed it's documentary on Kaleshwaram project.
I think this will make you understand the level of the project
It wasn’t fully removed. It was not available only in India due to digital rights issue. Its is available in US/UK and Eu discovery apps
Lol😂😂😂 , you've no grip on regional telecasting rights.
@@Peoplesays365thanks for ur info .....so many persons with half knowledge here .....
Improper grouting of subsoil is main reason for the problem.
It can be rectified by grouting after re-constructing damaged piers. After grouting its life time will be definetely more than 50 years. Further, it is essential to provide sand dune along down stream side upto one meter below bottom level of gate opening.
This project must be contined in the public service for benefit of farmers.
I didn't understood anything which you commented but I gave a thumbsup. I believe most of them who liked this comment belongs to my category, please explain the terms clearly while you are sharing such info
Here whole kaleshwaram is not failed. It contains 3 barrages and many pump houes... Etc only 1 barrages 6pillers are sunk it will be repaired by L&T soon. It irrigates lakhs of acres in telangana even it provides drinking water to Hyderabad and through kaleshwaram in coming days Hyderabad residents are going to get water 24/7
Agree bro and due to this we never faced electricity shortage and water problem
@@YaseenKabir😂
Its not failed ---basic thing biggest corruption done by KCR family 😊
The point how can it fail even after spending 30k crores
The NDSA report is given in 2days without any soil testing, etc. So it's not a fare report and just a political agenda report. However, it's true that there is a problem in one of the pillars of the project which L&T should analyse and repair asap. Btw Kaleshwaram is not a very small project it has many sections and any major projects would go through rough phases like this. Even Nagarjuna Sagar, Prakasham Barage, Srisailam etc did have technical problems which are documented.
Trust me people are talking about cost mentioning about it's better to give farmers money that the maintenance cost. But if we do not have water if a bad season comes-(I wish it should not happen) then money can't buy water. Ground reality is farmers are now able to grow 3season crops in Telangana which was not the case under United AP.
Everyone does know the fact that in our Nation, not even one project would happen without giving commission to political parties. So, in one way I am atleast happy that BRS completed the project even if they eat some percent of commission in the process.
ok as per your opinion taking some percent as commision for completing project is right .Firstly you shouldn't say it has commision, it is like looting public money for their personel gains.Being a people representaters politicians should work for the welfare of people with what ever salary the govt is paying them.They should not divert the project funds for their pesonel gains ok.
Ktr words copy pasted here, but it's a failure
Bro, the cost per acre of irritation is 70 to 80k. Whatever the reason is, farmers also, it's costlier than using kinley or bisleri water bottles. And every year the current bill of this one project is more then current bill of all other govt offices. And it occupies nearly 2% of budget. It's practically impossible.
@@marripallinikhil3197who told you it cost ₹80000 per acre, just consider when water was available in Sri ram sagar and yellampally....why we need ₹80000 per acre?
@learnandexplore7697 sorry I was wrong, I forgot what I learnt. I wrote the same in main chat section. I'm just copying the same to you.
More details
3 barrages
1531 kms of gravity canal
203 kms tunnels
20 lifts
19 pump houses
20 reservoirs
Project aim :
1. Provide irrigation to 45 lakh acres. (area of telengana 280 lakh acres)
2. Stabilisation of 18.83 lakh acres. ( which already have irrigation facility)
3. Drinking water of 40 TMC.
4. Industry 16 tmc
Achieved
1. Only 18.25 lakh acres got new irrigation against target 45.
2. Stabilisation 18.83 lakh acres. It already have irrigation facility.
3. Drinkimg water, no data on 40 tmc.
4. Industry water no dats.
Total water availablity 240 TMC
Irrigation 169 TMC
Total cost 1.3 lakh crores.
Lets take it 80k crore only which govt expected initially.
169 /240 tmc for irrigaion.
Approximate cost for irrigaion. (169/240)*( 80k crore / 37 lakh acres) = 1,52,000 rupees per acre.
But project is 1.3 lakh crore this makes it 250k per acre.
Cost of irrigation per acre from kaleshwaram = rs 250k
Now please say how the project is a sucess.
Note: I took 35 lakh acres, but new ayacut is 50% only. If you consider the same, it becomes 5 lakh per acre.
If you want reference of notes, have this link, I uploaded the material. I'm preparing for tspsc exams, I'm not saying any idiotic need channel data. As yohtube is not allowing links I used space. Copy same. You will get all reference.
uploadnow . io/f/9XDqnR4
Present CM KCR and his family made big time Money in this Project . Its Lift Irrigation Project that means water has to pump from ground to 350 to 400 meters up millions and millions cubic liters of water has to pump which cost of thousands of crores of money for Electricity. In the name of Project Govt will take kick bags from Electric suppliers per Unit. its true coz i belong to Telangana.
I also belong to telangana.. You get the evidence and give to court they will arrest congratulations in advance if you get the evidence as of now the biggest party in India has not getting evidence to arrest the tallest leader in telangana
@@TeluguWatcherDon't be like a dog to some cheap political party ,just like you being a loyal dog to brs.
@@logn-yt7037 I pity on myself to reply. And I am sorry to explain them who can't digest and ready to bark against fighters. Kcr is a proved leader who struggled for separate state and made history that can't be changed I feel proud to admire such a good leader. You called me a dog.. by that I can guess the way you are grown up by your parents. One more thing when you can't appreciate ones success you will never enjoy yours.
Politics is not a social work, it is just an earnest bussiness.
All political parties are currupt.
Right true
@@sudarshangitte3916 thank you 🙏
Exactly..
@@rinchentsering1578 yup
Yes
In the process of fast development, some small issues have come up. These will be rectified in coming days. This project has helped so much that Telangana has become rice bowl of India beating the other states and also helped in keeping Telangana at the top position in per capita income compared to any other state in India. Btw farmer suicides are least in Telangana now. It’s too early to say that it is a failure just before elections.
Desh me kuch achha hone par pura khayanad use failure dikhaane ke jaldi me rehti hain… achha Chalne par uska benefits kya the koi baat hi nahi kii… World’s largest lift irrigation project pe koi charcha nahi hua tha. Anyway these three barrages are very small part of Kaleshwaram project. Mistakes will be rectified.
😂😂😂 Rice bowl of India is Andhra Pradesh
@@01124no more..go Check the data..yeddi Andhroda 😂😂😂
@@venkyk4812 Which is the rice bowl of India?
State of Andhra Pradesh
Answer: The State of Andhra Pradesh is known as the rice bowl of India. Rice makes up to 77 percent of the total crop production.
@@venkyk4812 Which state is called Egg bowl of Asia?
Andhra Pradesh is known as the egg bowl of Asia because it is the largest producer of eggs in India.
Im local from Telangana, firstly we think this is the biggest irrigation project & it is useful to whole Telangana, but the reality is already we lost 1 lack cr.
In 3 years it is going to be a world tourist place for engineers & public, to know how not to construct the irrigation project.
Are you an engineer yourself
The construction issues can be fixed. Political parties are spreading false information before elections. This project is actually very beneficial to the people of Telangana.
KCR Changed the previous design for his own benefits. Even SEA level didn't considered in New plan. Old plan costs only 30k crores, but new project costed 1lakh crore + water Distribution under construction costs 40K crore + 13k core EB/year.
Have u ever heard a term called ‘Inflation’ ? Project was shelved in 2009 and it was revived in 2019. So that’s a decade , so obviously the cost will go up. Thats the same with every other project on India
@@Peoplesays365inflation wasn't that high that in a decade price almost quadrupled i mean like cmon
@@Peoplesays365 Inflation one of factor to loot public money, The steel ,Cement ,Raw materials costs are not much changed.this project 4 times cost escalation purely looting public money our Telangana jaati PIta.
@@aashwinjasrotia5233 for real bro? Back in 2007 when we constructed a house it costed us around 31 L , thats incl labour , cement , steel etc. in 2021 we added first floor and just a single floor costed as around 14L(its just 2 rooms again) what part of India r u living in? My dad is screaming everything is going up and you’re saying inflation is not that much? Kamaal hei bhai
@@yedlapallirao3517 its the main factor. Lekunte vaanki cost penche loophole dorkadi kada. Sandhu dorkindi eskunnadu. A detailed CBI investigation should reveal their corruption.
In next 2 weeks, we have elections in Telangana. This project is completed long back. I can say it's an influencial video.
CM KCR is also not mentioning about kaleshwaram project in public meetings after the scam was exposed 😂😂
🤥🤥🤥🤥
This comment needs highest upvotes
I'm from telangana and before kaleshwaram project our village farmers are able to irrigate 1 crop per year But after this project we are able to irrigate all te year even in summers before 5years our lands are 4-5lakhs per acer and now in 2023 they are 1 cr per acer ❤🎉 we are proud of our x chief minister CM KCR❤❤
even it get repaired and available for operations, the cost to provide water for each acre requires 50,000 rupees which is just utter foolishness. instead give that money directly to farmer. kaleswaram gonna be an unbearable liability for telangana
its just not for farmers it was for industry
you know something ,even you give money to farmers they wont eat money theyy eat rice and if you cost water them we have to import rice for telangana region,imagine a draught like situation ,or a war like situation then how india will survive without rice or food if we cant get rice from othr countries . see kaleshwaram is not for food or industries it is giving life to telangana economy ..you need to have a broad knowkedge to understnd kaleshwaram . i can describe you contact me
U failed at economic.😂
@@StockistNKB who??
That way the biggest liability in India will be the Ahmedabad- Mumbai metro rail.
It's a flaw in Discovery Channel's Merit system...they should have made a Documentary on How all BRS Leaders turned into billionaires in a span of 10 Years! The creation of The Lovely State Called "Telangana" has been beneficial for one family and I am not uttering any names over here!! Because the people of Telangana Know it very clearly!!
It would be next documentary in future for sure😅😅😅
Yes😢
hope you aren't consuming any water or eating rice in Telangana.
@@IndianCommonMan36many states are cultivating 🌾 rice....😂not only Telangana.......KcheR said not to cultivate rice 😂
@@TG01012K many states but we came from nowhere to top. that's a game changer.
Because of kaleshwaram project every 2 days water is coming to direct home. Truly we are benefitting👍
But KCR is untouchable. He lives happily with that big loot. Nobody can do any thing except write articles and make Y-tubes.
Why can't the people of telengana elect someone else?
Bro..plzz do a video on TSPSC SCAM , plzz everyone know about TSPSC paper leak scam..from Telangana unemploye
National geography or discovery or animal planet Valle cheyale mana media adi pattichukodu
@@kittuchandu338bbc cover chesindi
I hail from Telangana. I can confidently say that just for the sake of doing corruption this govt has come up with this plan. This project utterly fails in cost benefit analysis. The contractors and politicians looted major chunk of finance. Further the quality of this project is abysmal.
Karchu avtundi ani em cheyakunda undamu kada.. once money starts liquidating in individuals accounts, 2000cr of power cost per year, isn't a big deal for entire state.
Kaleshwaram project is the reason we are getting drinking water all over telangana.
@@akshaysunny4672 learn some geography
@@IndianCommonMan36any project which fails cost benefit analysis is a white elephant
All the agencies including central agency officers too should be brought to book for this issue.
In Golden Telangana it's he himself called the father of Telangana gives the Golden gift.
Its truly good project we are getting free water 💧
Last two months the heavy rains damage whole village, totally loss for farmers and their houses
Kaleshwaram project truely great project and benefited to formers...
How do you explain the following without the Kalaeshwaram Project ?
1. Telenagana is the highest producer of Rice in India, it was in 14th place before the project
2. Every house in the state has drinking water
3. Water Level in Telangana has increased by 6 meters
4. There are no farmer's suicides today in Telangana
5. The Green cover of the state increased by 7% - Highest in the country
The project was built by reputable L&T and all the repairs will be covered under warranty so there is no burden on tax payers
It's about value for money issues bro...
@@uditraj6518before this project in my home village there is no water,underground water also no there.
After telangana formed this party within 2 yrs we received water to every house.
But they did so fast it is marvaleous to complete this project so quickly without politics.
So i wont complain.
If any fault in dam it should be done by the manufacturer or construction company who taken tender.
It has become a political issue because of the upcoming assembly elections.
No farmers suicide in Telangana, 😂😂😂 next level hypocrisy Anna sigu vudali koncham ania
1-This is not happened by the Kaleswaram project,it because of high rain fall in last 7 years
2-Mission Bhagiratha water not useful for drinking,ground reality
3-ground level water increased by heavy rainfall
4-Telangana state becomes number 1 in farmers suicide,check the reports online
Telangana ground water levels increased, biggest rice producer in the country after the project, no water shortage for Telangana and Hyderabad after the project and one of the lowest debt to gdp ratio in India, much better than Modis Gujarat in per capita Income, Hyderabad had the best yech district in India
I'm from Karimnagar... The Project has done only for 30% commission to kcr, not only this even karimnagar granite mafia, sand mafia is also there😢 Cm's son is IT Minister, Cm's Daughter is ex MP now she is MLC, Cm's nephew is Health and finance minister... There are so many biname's are working under them like Megha constructions, My home etc..
Usually politicians take commissions from under construction projects but KCR constructed this project to take commisions 😂. Even 10% of 1L cr ki 10,000cr 😮
Not 10%, it's 30%. 30K crore 😂
Politics is the best business, new political parties are the best startups. 😂
iam telangna ...kaleshwaram nice project, verry usefull,
I'm from telangana & points are as follows
1) project cost is 85k crores not 1lac crores
2) without emptying the reservoir no one can submit the final investigation report
3) All state & central agencies had given clearance, so there cannot be any scope of errors.
This is a clear-cut political blame game.
Kcr showed as he spent lot of money but it was very less..
Over all it's very much needed project, might have some technical issues which can be solved. When we such a big project in short time naturally some errors may occur. Instead of pointing out be happy and appreciate the government who has dared and completed project in short time . Much better compare to any state government.
Just matter of time for you to understand the reality.
One bad season of monsoon ... And you'll understand to what extent this project is useless
Pump house also drowned during floods and with this project cm family assests have grown 1200 times due to fund diversion.
Actually this incident was happen in many other dams in india . So these problem can be resolved by these dam there are so much of benefit like drinking water agriculture industries. And one more thing kaleshwaram is not only mediagada its 3 barrage 16 or 18 pump house and many links
This is not DAM
@@abc0076 yaa dam kadhu barrage
Current bill 10000 crore😢😢😢 yield??
@@humanity947 bro they will use In rainy season . In rain season only when floods will come so it will not cost that much of bill
Before the motors were sunk and now dam quality raises questions on design and functionality of whole project
Moreover whole project runs on lift irrigation offering electricity burden moreover to the project was not fully operational to say telangana ha benefitted from it
And interests got on kaleswaram project are at skyroof a burden on state exchequer
Can check official stats of govt
It's a feather in the hat for KCR's corruption.
The value of Kaleshwaram project will be only realised when the state faces low rainfall or drought. Its a great project irrespective of its maintenence costs.
😂😂😂no use bro...1 acre supply water current bill 20000...how it is useful.. instead of this we can import rice with this amount
Kcr means Kaleshwaram commission rao
We fighted for special state but today corruption like this heart's
Finally u proven that ur channel also working for the political party money 👏
I am from telangana and we understand the value of kaleswaram project bring us drinking water. U have absolutely know idea and u giving us only news without any credible sources. Pls learn from thinkschool to make good case studies instead of wasting ur and ours time.
Hahha 😂😂
ACB , CBI , Income Tax , and ED should act sincerely and dig out Corruption in KALESWARAM PROJECT IN TELANGANA
It is pretty obvious that kcr and his party has siphoned off atleast 10-15k crores using this project
Bro this is South India not north ... Like gujrat or up jaha pe log hi chori karte ... I think there is problem with the design
@@YaseenKabirmadarsachaap logic telangana economic rank is 9 meanwhile gujrat is 3
@@YaseenKabir😅😂😅😂 discuss something relevant
@@tushar-lf8euah yes typical North Indian who's first retort is religious hatred
@@YaseenKabiravg. South madarsachhap
I am resident of rural part( Thorrur) of warangal district Telangana, in my village and near by my Villages there is SRSC canal which was digged in 2007-2008 when i was in 9th or 10th I haven't see single drop of water except raining season, but after kamleshwaram project it is floating full of water, in covid 1 and 2 we use to swim in those canal, i will not agree Telangana didn't benefitted, it gave huge water supply for farmers, i also agree there might be some corruption
KALESHWARAM IS REVOLUTION
Its not built by some binami or a close aid of KCR. Its built by L&T which is one of the most trusted companies in the world. That mistake is caused by sinking of the piers and not due to lack of quality.
the projects consist of many barrages in that one barrage is damaged which consists of 89 pillars and in those 6 pillars are damaged. Maybe it is due to deficiency of quality but the ground reality is that 80% places of telangana is depending on this kaleshwaram project water.
💯
In telangana everyone knows about the commission kaleshwaram done by most corrupted CM KCR🙄🙂🤦♂️
So what water coming happy people. Y u r carrying
Stop misleading people..This project has helped agriculture and millions of civilians
@studyiqofficial 80K crore Project mein 1 Lakh scam kaise hote hai bhai. 80 K crore worth structures can be seen on field - barrages, canalas, reservoirs and tunnels and pump stations.
80k is the initial anticipated cost...with delays in the project its cost increased to 1.5lakh...
That's the logic of opposition 😂
They can make money out of thin air
The changing trends in UPSC CSE mains has clearly brought out the relevance of interlinking multiple topics of GS subjects. These case studies are specifically designed to build your analytical skills and give a bird's eye view of the topic. Do follow this entire playlist for the repository of these videos. In 2023 UPSC Mains examination multiple questions were easily answered by merely watching these videos.
ua-cam.com/play/PLpuxPG4TUOR4ZFlXVEMUNP_r8gOhyBL0I.html
This video is Nonsense....There are no proven facts that this lift irrigation project has witnessed corruption.Stop misleading people.
Nobody (except officials) is allowed to see the project from more than a year. This goes to show how telangana govt hiding its failed project ever since it submerged last year. The project was designed by kcr, not engineers. National media should focus on this matter and bring the truth out.
Definitely it’s a great project it serving lot of ppl there’s no water in whole Telangana state KCR sir helped ppl by this projects
Yes , this project may have solved many problems but no one can deny that there is no corruption is being done by the top political leaders of Telangana or at least say any state
They don’t know Paani Foundation’s work to stop, store and use rain water effectively!!! This is so crazy!!!!
Kaleshwaram project is like Hambantota project in Srilanka… financially not viable… but wondering what central government was doing when Kaleshwaram construction was going on… Obviously auditing would have done
No project will be viable in Telangana if you check the econimcs 🤷🏾♂️ State is above the sea level up 600 meters . Only lift irrigation projects is the only solution
Kaleshwaram irrigation project
Expenses > profits
Wastage > usage
Problems > solutions 👍👍
Am from telangana.we (coman man ) thought its fraudest project in the world .almost 1lack crore spend .once medigadda crack down and fail.people are completely confussion because of its public money
StudyIQ's research is half boiled. Kaleshwaram changed the face of Telangana's agriculture, drinking water, forestry, underground water levels and drastically reduced ensuing out of pocket costs of farmers for digging borewells etc.
The benefits are uncountable, and even the financial cost is easily repayable by generation of electricity and improved fishery sector.
Calling it corruption is akin to calling India's independence a sham because it got bad politics today.
All this agriculture, water levels, drinking water is because of surplus rainfall for the last 10 years. It's just a coincidence.
@@crazystuff6760 literally every other state in the country is at the brink of drought, while being at the brink of floods every monsoon. How delusional are you to say this is a coincidence?
Impossible project has been completed within 3yrs and it is useful for cultivation among 50% of Telangana. It is a life for Telangana water drout area.
Kcr is a superb visionary chief minister
Idea is good but project shouldn't be a white elephant to govt. I think instead going large scale lift irrigation project they should build a pilot project and study the viability.
If Kaleshwaram is scam, Then dams built by centre are also scam.
Any construction will have some Repair and modifications that needs to be done.
Centre didn’t gave 1 Rupee to that Project by the way.
This is propaganda video without reality ..this project as helped water to drought area ..this is innovative project ..same thing is done in China on Brahma putra river , Afghanistan near Tajikistan border , on Nile river near ethopia and Egypt border. In israel and Jordon border , so commenting on the project with out reality its good project needs time for results ..
😂😂eri pukka lo no1
When did Telangana face drought in the last 10 years ?😂
This project had been done Industry stalwarts like L&T , MEIL, etc. So let enquiry be on this companies , commission to politicians will be given by the companies who have done the projects
*I am from Hyderabad first and foremost BRS party is free from corruption just because of little part of dam collapsed you can't alleged the chief minister of corruption it might be negligence of engineers since the formation of Telangana we have free water24 hours electricity. In 2024, he is going to win by the high majority*
kaleshwaram barrage nahi Medigadda Barrage hey, kaleshwaram is a project of 4 baraages and thousands of kilometers of canals, underground tunnels and 20 pump houses and nearly 100+ reservoirs of various sizes
Telangana needs more such projects nd development not like current government who are stopping development..
KCR family started lotting Telangana when they came into powers they accumulated tremendous wealth no politicians in India ever have.
The cost of Burj khalifa is 1.5 billion USD.
Kaleswaram project is 11 billion USD
Kaleshwaram project kcr family ka ek Paisa lootne ka tareeka tha aur lootne me safal rahe he vo log.
Aur practically cost benefit analysis dekenge to cost aasman choota he aur faida earth core me he. Isse accha groundwater borewells behetar he, cost-effective he.
I think this will clear doubt regarding KLIP project.
People are forgetting about power bills every year which will cost 10k crores, they can follow Anna Harare model and improve ground water with much cost effective way, I would the state had invested such money on solar energy and have saved 1000s of crores every year for state and can have been used to build agriculture wearhouses, other ecosystem for farmers to thrive...
Do a video on TSPSC SCAM🙏🙏🙏🙏
Yes Reddy , Also tell which state gov has hired more than Telangana 😂
Every MLA in BRS has become crorepati now... Every MLA has made 100 crores to 1000 crores corruption.... Looted telangana...!
good analysis,
actually i am a civil engineer
in my opinion
it is a failure in cost benifit ratio
incomplete project
till now mostly the lifted water again released into river due to flood rise in river
when there is a chance for gravity canals & reservoirs
but only for commissions and percentage opted lift irrigation.
many doubts in quality, transperency, maintenance cost ?
if detailed investigation intiated it will be a indias largest scam.
Its just an accident, its really very helpful for farmers and people of the state, people those are calling it failed project are jealous of Telangana's Progress.
And i am not a supporter of Trs/Brs
So what if you lose... your life in the same accident, will you be saying the same? BRS is the corruption king of India!
😅😂😅 You are a Supporter of BRS.
The Kaleshwaram project actually doesn't have any storage capacity it's just a barrage which stops water flow and lifts water and again puts the water into the same godavari river not into fields 😅😂😅😂😅
So first do some research about the project
I think your supportor of MIM
Care to explain how it is benefitting the farmers ?
It will not make sense now, Telangana is close to water shortage. When the situation comes no one will compensate or debate on this. As I see the Telangana government is building an electricity generation station, on time being it will reduce price. Think guys water cannot be priced.
Dubai is buying water it cost more than anything think!! It is a good project, may be it has its own problem. Let's solve those problem instead blaming wholesome
Some fools are saying One lakh crore corruption, the project cost is Rs 80,190 crore., Then how can be possible One lakh crore corruption ?
Total cost of the kaleshwaram project is around ₹1.10 lakh crore
As per the agreement, the PFC is supposed to lend ₹37,000 crore, while the REC would lend another ₹30,000 crore for the Kaleshwaram project.
Who can one steal 1lac crores from 1.1 lac crore project.
I'm from Karimnagar Telangana,This project has helped Telangana to overcome its water scarcity...there may be some technical issue...flaw but it will be repaired ...bringing up this issue before elections is purely political tactic by National political parties to defame regional government
I think our New channels should learn from Study IQ analysis about such events .. great work sir 👍
I am from Telangana, at present Telangana is rice bowl of India and no doubt that Telangana going to become rice bowl of world .
Kaleshwaram is the life line of Telangana state. After 2014, the state government rennovated many lakes, pounds in the state and all are interlinked connected with each other. When it launched everyone appreciated as a marvelous engineering. There should be some pros and cons as it's a world largest lift irrigation project. The real usage of this project can be understood in continuous drought years. Money can't buy food. Apart from political blames, this project truely needy project for telangana. Another project Palamuru have to complete in time. So that Telangana farmers can do cultivation throughout the year
Telangana govt is doing a great job. Being the world’s largest lift irrigation project its cost can be justified.
Yes offcourse.. world's biggest failure project.....
World's largest because no one dared to pour people's money down the drain except this Kachara
I am from hyderabad and the kcr has so many cores corrupted in kaleswaram project I request put a enquiry from central for him.
Please correct your data. The total project cost it self is 88000 crores. We r getting water because of this project. Medigadda project part of KLIP is 1900 odd crores. KLIP consists of 1000 s of kms pipeline and three big projects and largest pump house in the country.
I am from Telangana i know how agricultural was before 2014 and after 2014 and recently Telangana became rice bowl of india any one can check fci site abiut rice production in Telangana befores 2014 i mean it was ap and after supperation and kaleshwaram and next yes correction may be happened but central govt should ro enquire on it
For KCR and his party Telangana is limited to Hyderabad, like Uddhav Thakare (Mumbai) beyond that there is no development at all. If you keep minority appeasement beside the KTR is far better to anyone else particularly for Hyderabad, KCR must work on development for the rest of the Telangana.
Im local to Telangana..
This project is like a oxygen for farmer's
Telangana's farming production increased up to 4 times. Ground water level increased
Telangan is the only state which provides drinking water to each and every..home.
24 hrs free electricity is provided to the farmers
There are many welfare schemes for the development of farmers..
Telangana is top in GDP..
Telangan is top in IT Exports
KCR is a visionary leader ..
Brother before making any video or mentioning any tag lines pl do some home work.. politics are different then ground reality..
My birth place is Sri ram sagar project.. it was almost dried up because of constructing many other projects in Maharashtra. Govt planed to do reverse pumping from kaleshwaram project SRSP will also get water.
This project was appreciated world wide .. but bad luck politics are politics ..
I request you to do detail research... about Telangana's development in last 10 years..
And nuvu cheppina chala facts thappu unnai
How did this turn into the largest corruption? Have you got any official documents or evidence? Kaleshwaram cost 92 thousand crores to build in total. When the total cost was ninety-two thousand, how can corruption amount to one lakh crore?
The problem was in meddigada barrage which cost is 1800cr and it is in the hands of LT company which promised to rectify the error
This alone project mare KCR family Richest politician in Telangana
I am a Telanganite.. I am native of Hyderabad.. Prof. K. L. Rao wanted to link Gan ga- Cauvery river.. Passing through draught areas of Vidherbha, Telangan and Rayalaseema and chennai.. The project was rejected by the then central Government..
But today at least KCR had the guts to do such a difficult and impossible task to supply water and cater to the needs of the state and especially Hyderabad.. which is drastically expanding due to IT sector and other companies...
There is no project in India which has not involved in corruption.. But atleast getting suficient water... It is obvious that funds were not released from Central Government
to the state.. Step motherly treatment.. I can't eloborate much..
People Benefitted by this project:
1. BRS politicians
2. Kachara Family
3. Contractor
4. Irrigation Officials - (Dinner in Falaknuma palace)
Losers:
People of Telangana.
I am from telangana, thank you for giving a valuable information about kaleshwaram project. But please please make video with true information. kaleshwaram is not only medigadda barrage it contains so many tunnells, barrages, dams, etc. how can a NDA government give a report within 2 days. how it will be possible to give a report on the cracks of medigadda barrage. dont they have patience to collect soil samples and project detailed report. without collecting the soil samples how it is possible to make a report. without knowing all these things before checking to the project a report will be made within two days. for example in secunderabad a building is unfortunately collapsed, to make a report upon this incident, it taken one week of time to give a detailed report about the incident. for one building it will take one week to make a report. THEN HOW MUCH TIME IT WILL TAKE TO KNOW THE REAL TRUTH BEHIND THE INCIDENT OF MEDIGADDA BARRAGE. it will take atleast a 6 months of time to know the real truth behind the incident of medigadda barrage. PLEASE DO THINK YOURSELF. please make video on the false report of MEDIGADDA BARRIAGE. and give the true information about the kaleshwaram project. ONE THING I WANT TO ASK THE OPPOSITIONS i.e the project cost is 80k crores then how 1 lakh crore scam will happen. it means the project is built with ZERO rupees. and also mean that 1lakh crore is swallowed by govt. PLEASE KNOW THE TRUTH, BELIEVE TRUTH, SAY TRUTH to the youth of the nation.
thankyou bro i have the same concern
Po ra babu aa project vere chota kattali akunuri murali jayaprakash narayan oppose chesaru.Sustainable project kaduKCR
Total cost used is 1.5 lakh cr
@@pulipakasrikiran9307 ah medhavulu Telangana andhr kalisi unnapudu aathma htyalu chusi maatladakunda kusunnadi.. Vallu medhavulu.. TV la mundu maatalu cheppukuntu bathukutunaru
@@pulipakasrikiran9307 aavakasam untey evadina maatladthadu bagupaddaniki bagucheyadaniki maatram chala medhavulam ani cheppukune vallu kuda Hyd la illu konukkoni tv debate lu ichukunta unnaru kani evadu mundhu undi poratam cheyale.. Iga vallu suggest chesaru place antava.. CWC gaddi pikinda project place ki sambandhinchina vishayam lo