Why Slow Indian Railways is Defeating India? India Vs China | UPSC Mains

Поділитися
Вставка
  • Опубліковано 1 гру 2024

КОМЕНТАРІ • 344

  • @StudyIQEducationLtd
    @StudyIQEducationLtd  Рік тому +19

    Use the code ‘AGLIVE’ to get Our Courses at Maximum discount!
    Hurry Enrol Now : bit.ly/3SS8Sd5
    UPSC IAS Live GS Foundation P2I Batch 4 : bit.ly/3SS8Sd5
    Batch Starting on 25th November 2023 | Daily Live Classes at 8:00 AM
    Hurry Enrol Now : bit.ly/3SS8Sd5
    The changing trends in UPSC CSE mains has clearly brought out the relevance of interlinking multiple topics of GS subjects. These case studies are specifically designed to build your analytical skills and give a bird's eye view of the topic. Do follow this entire playlist for the repository of these videos. In 2023 UPSC Mains examination multiple questions were easily answered by merely watching these videos.
    ua-cam.com/users/playlist?list...
    UPSC IAS Live GS Foundation P2I Hindi Batch 4
    बैच 23 नवंबर 2023 से शुरू हो रहा है | बैच का समय सुबह 8:00 AM
    Hurry Enrol Now : bit.ly/3SMKvxm
    UPSC IAS Live GS Foundation P2I English Batch 4
    Batch Starting on 24th November 2023 | Daily Live Classes at 8:00 AM
    Hurry Enrol Now : bit.ly/3SMCQPA
    UPSC IAS Prelims to Interview ( P2I) 2024 Live Advanced Batch 6
    Admissions Closing on 30th November 2023 | Daily Live Classes at 6:30 PM
    Hurry Enrol Now : bit.ly/47GKMGi
    UPSC IAS (Mains) LIVE Optional Batches : bit.ly/3DrHsmw
    (PSIR, Sociology, History, Geography, Pub Ad, Anthropology, Mathematics, Hindi Literature)

  • @amit2009mishra
    @amit2009mishra Рік тому +94

    For getting high speed in indian Train,We need a huge investment for
    1.New Rail Lines and Existing Track upgradation
    2. Advance signaling system upgradation
    3. Kawach installation throughout rail lines
    4.Light weight Almunium upgraded train sets with high safety standards.
    5.Four Dedicate fraight coridor operational system
    Without these five works progress ,Rail Traffic can't decrease. It is very difficult to increase speed and also risky to operate Train @200 KMPH speed. Because the driver can't operate on such high speed without advance safety and security standards.

    • @Edward4Plantagenet
      @Edward4Plantagenet Рік тому +12

      6) Fencing of tracks
      7) remove Level crossings,
      8) push pull trains for better acceleration

  • @GreatSanto
    @GreatSanto Рік тому +323

    Instead of launching new trains govt should focus more and more on improving tracks quality and maintenance

    • @Edward4Plantagenet
      @Edward4Plantagenet Рік тому +44

      Instead of cherry picking problems, one should read full A to Z data. @GreatSanto

    • @JETHIA_
      @JETHIA_ Рік тому +37

      Both are being done simultaneously. Have patience

    • @MANISHKUMAR-s1q6i
      @MANISHKUMAR-s1q6i Рік тому +21

      Both are important bro. We have a large population and we see waiting list and no. Of passengers travelling so both are needs of the hour.

    • @Optimumprime_
      @Optimumprime_ Рік тому +12

      Open your eyes railway track upgradation is also is on Fastrack mode

    • @Superman-sx7sl
      @Superman-sx7sl Рік тому +4

      Population toh dekh or ticket 2 months ke baad milta hai wo bhi waiting wala

  • @schouhan6713
    @schouhan6713 Рік тому +16

    Need a man like gadakari sir as a railway minister.... because corruption is a big reason behind every failure

    • @fiddahussain2264
      @fiddahussain2264 10 місяців тому

      So you accept current Govt is corrupted..

    • @gauravsharma_7
      @gauravsharma_7 9 місяців тому +5

      Railways will require a huge chunk of budget for its upgradation. Raato raat hone wala kaam nahi hai..

    • @intafansari4761
      @intafansari4761 8 місяців тому +1

      Eik dam salute Gadkari sir

    • @thetechnocrat4979
      @thetechnocrat4979 8 місяців тому +3

      Gadkari sir is great but there is a world of difference between upgrading roads and railways. Roads are relatively simpler technology which can be upgraded quicker by the use of even mostly low skilled labour. Railways on the other hand, are extremely complicated technology compared to roads. They will take much longer to be upgraded.

    • @swapnilparitosh6058
      @swapnilparitosh6058 5 місяців тому

      ✅️Finance, Foreign, Road ministry 😍
      ❌️Railway, Education, Health ministry 🤬

  • @HarekrishnaMandi-fx3hi
    @HarekrishnaMandi-fx3hi Рік тому +18

    1st reason old bridge, 2nd forest area, 3rd highest curve, 4th signal system, 5th lake of tracks

  • @Artivule
    @Artivule Рік тому +141

    Mumbai locals need a full overhaul. It's unfortunate that people are traveling ticketless for whatever reasons and ac locals which could've changed the face of locals are not accepted widely by the people. It's the mindset which needs to be changed towards the public property. IR needs funds to upgrade the network but still running in losses even with serving the huge population of Mumbai.

    • @nicksonpinto2074
      @nicksonpinto2074 Рік тому +21

      Yup...Mumbai,Bangalore,Chennai, Kolkata needs better local train transport.

    • @SanjayGupta-jv9zc
      @SanjayGupta-jv9zc Рік тому

      As in New Delhi, make it free

    • @AmitKumar-uj7mv
      @AmitKumar-uj7mv Рік тому +7

      ​@@SanjayGupta-jv9zc Metro is not free in delhi

    • @XxJANGRAxX
      @XxJANGRAxX Рік тому +6

      ​@@SanjayGupta-jv9zcmetro is not free in Delhi

    • @racoon2664
      @racoon2664 Рік тому +1

      Indian railways need overhaul,not Mumbai local, it is one of the most efficient rail system with more than 99% accuracy... although safety issue persists that's why govt is working on metro expansion which is also ofcourse heavily delayed

  • @atokimruk937
    @atokimruk937 Рік тому +25

    It is the tracks. They are low cost and ancient. But the grades and curves/alignments were designed for ancient slow trains. So unless the ugnments, grades, and tracks are not changed to accommodate high speeds, Indian trains will reflect a third world country while China's regulat trains easily do 180 kmph and bullet trains are running at close to 400 kmph.

    • @ms.550
      @ms.550 Рік тому

      We need R&D on tracks which need low maintenance and high reliability. One this is solved any train can run at 160 min speed.

  • @akashk106
    @akashk106 Рік тому +9

    In so many trains 70-80% passengers travel ticketless,Indian Railway needs to pay attention to this.

  • @neelababu808
    @neelababu808 Рік тому +15

    To enhance the rail infrastructure and to maintain it, essential thing is sufficient manpower.
    But IR is going for short sighted cost cutting measures in even safety category like loco pilots and track maintainers.
    According to Railway Board instructions, Loco pilots are to work for a max of 9 hrs, but here in south Central railways, LPs are made to work for 14hrs daily and they get 8hrs rest at outstation and again work for 14 hrs.
    And there are so many things happening internally in safety category which one can hardly perceive.

  • @dholakpurkirakhi434
    @dholakpurkirakhi434 Рік тому +18

    Railway should focus on Increasing RRTS in every city To city ...
    State to state as soon as possible
    because it have their own tracks and stations
    It Can make good change

  • @chekkalarajkumar2556
    @chekkalarajkumar2556 Рік тому +15

    This means that privatization of railways is not the solution to the problems, government investment should be increased, because private operators are not ready to invest in changing track, they are only looking for immediate profits by taking train lines running on old tracks in profitable ways. Moreover, no private company is focusing on research and development for railway needs

    • @AnilKumar-jf3vp
      @AnilKumar-jf3vp Рік тому +3

      Ri8...but we can do with this reduculues politics...

    • @jaimishraRly
      @jaimishraRly 11 місяців тому

      Right bro....Privatization is continuously increasing, as long as the game of making money between contractors and officers continues, only then can the Railways survive. The outsourcing employee gets a salary of 8k. How much will this help in salary? Curoption is the main part in Railways.

  • @kirannnnnn
    @kirannnnnn Рік тому +16

    Ashwini vaishnaw explained about the this low speed in India TV infrastructure dialogue .
    He cleared all the doubts about indian railways transformation.

  • @javedhussainbarbhuiya2635
    @javedhussainbarbhuiya2635 Рік тому +5

    Silchar to Guwahati only 360KM but it's takes 14hr only 😂

  • @krish4u85
    @krish4u85 Рік тому +5

    Rationalized ticket price by raising ticket fares . Raise low cost by small percentage, medium by little higher , executive highest. Railway is not here to charity fares . We are 143cr people increasing exponentially to take care. There are no free lunches in this world.

  • @sandipsen5331
    @sandipsen5331 Рік тому +8

    No need to color locomotives blue and red to explain difference between ICF and LHB coaches. Instead a side view with an explanation of the difference in coupling would be more helpful.

  • @kshitij1510
    @kshitij1510 Рік тому +15

    Indian Railways have a very good operating leverage. It should capitalize it

  • @arjunboss4929
    @arjunboss4929 Рік тому +2

    😡😡😡🥺Biggest problem which no one will throw light is *** Manpower shortage and Material shortage** Everytime only one response ***Dusre gadi se kholke lga do ** kahi tuta gira jod ke lga do** jabardasti round trip wagon ko bhi 30 day run krana * line job pe 5 admi ki kam 1 admi se krana, na bole toh punishment ka dr dikhana *** This railway going to be a exploitation of line staffs and supervisors 🥺🥺😡😡😡

  • @inventindia
    @inventindia Рік тому +3

    1st step is to reduce Corruption 🙏

  • @truthislogical
    @truthislogical Рік тому +10

    Privatisation is the only solution

  • @statusvlog9060
    @statusvlog9060 Рік тому +5

    If India wants to become superpower then it must build the railway network

  • @gojo_satoru_sama
    @gojo_satoru_sama Рік тому +4

    Japan aur China me different types ki trains chlti h jinki speeds bhi different h.. Waise hi Vande Bharat jo ki 180kmph pr chl skti h then Shatabdi jo 150kmph tk chlti h then Rajdhani/Superfasts jo 130kmph tk chlti h then mail/express jo 110kmph tk chlti h.. iske liye sbse phle tracks ko completely electrify kr k 200kmph tk k speed wale tracks pr kaam krna chaiye.. aise se trains ko proper utilize kr paynge

  • @dholakpurkirakhi434
    @dholakpurkirakhi434 Рік тому +7

    Even If we replace more trains with vande bharat then too Because of our old tracks
    we can only increase average speed upto. 70-75Km from 50 Km
    which is not that good

    • @AnilKumar-jf3vp
      @AnilKumar-jf3vp Рік тому

      Not affordable bro vande Bharat 😢😢

    • @dholakpurkirakhi434
      @dholakpurkirakhi434 Рік тому +1

      @@AnilKumar-jf3vp slowly and steadily the price of vande Bharat will decrease with increase in numbers of vande bharat

    • @AnilKumar-jf3vp
      @AnilKumar-jf3vp Рік тому

      Hope so...but hope is mistake🙏

  • @rohma220
    @rohma220 Рік тому +5

    And most importantly India should not be a car based economy so it is absolutely necessary to build fast public transport network in India. And that IS the responsibility of government completely.

  • @amytb92
    @amytb92 Рік тому +3

    Sir loco pilot ka 14-se 16 hours duty karna pardta hai usme 1 video banao Jo safety ka against hai..locopilot 32 hours bad Ghar back ate hai and only 14+2 hours rest deke fir duty vejta hai

  • @jitendrakharva437
    @jitendrakharva437 Рік тому +12

    IN USA POPULATION 33 CR. RAIL NETWORK 260000 KM, WHILE IN INDIA POPULATION 140 CR. RAIL NETWORK 65000 KM ? WHY ?

    • @workcivil
      @workcivil Рік тому +3

      Because the area of US is 2.5 times of india , economy 7-8 times , and india got its economic independence in 1999

  • @Baba-ic4un
    @Baba-ic4un Рік тому +2

    Ruko Zara sabar Karo... Bharat 🇮🇳 will Rise Again...

  • @shubhamrajput1187
    @shubhamrajput1187 Рік тому +5

    Indian railways should adopt public private model of development like NHAI this will not only gives it funds but also provides better ways to manage it , advertisement in, railways products like water and special waiting rooms and special trains like vande Bharat,rapid can also play crucial roll intercity express will be better example

  • @crackupsc2003
    @crackupsc2003 Рік тому +2

    In this perspective my opinion....Indian railway more and more emphasized the effective factors that is -(i)-:re construction of rail lines (ii)-: foreign rail advancement technology collaboration approach increase (iii)-: reforms our track structure and alternatively lunch separation of track structure strategy it means ... there are 3 tracks structure basically introduced(i) speed track.... including express trains (ii) messenger tracks......including local travel trains (iii) goods tracks..... including all assets and meterials running trains.....in this action reforms our slow railway network issue and threat.

  • @StudyIQEducationLtd
    @StudyIQEducationLtd  Рік тому +18

    The changing trends in UPSC CSE mains has clearly brought out the relevance of interlinking multiple topics of GS subjects. These case studies are specifically designed to build your analytical skills and give a bird's eye view of the topic. Do follow this entire playlist for the repository of these videos. In 2023 UPSC Mains examination multiple questions were easily answered by merely watching these videos.
    ua-cam.com/play/PLpuxPG4TUOR4ZFlXVEMUNP_r8gOhyBL0I.html

  • @ManashRanjanPratinga
    @ManashRanjanPratinga 6 місяців тому

    Post -JARAPA 🚆🛤️🚫😭😭🙏🙏🙏🙏
    Block -Chandrapur 🛤️🚆🚫😭😭🙏🙏🙏
    Block Gunupur 🚆🛤️⬆️✔️
    Dist Rayagada 😊
    Okay 👍

  • @psyclist1426
    @psyclist1426 Рік тому +2

    Considering the economic diversity Indian railways needs to run different kinds of trains ( sleeper / general only/ full ac / vande Bharat) on multiple routes. For eg there can not be only two main routes between Delhi and Mumbai. Construction of new lines is very slow. For eg the ongoing track construction between Indore and Khandwa which can be a shorter alternative between North and South India. Thereby reducing congestion on Bhopal Nagpur route. But politicians only care about their benefit. The private bus lobby is not letting it complete for almost 15 years now.

  • @priyabratadash9907
    @priyabratadash9907 Рік тому +9

    Indian railways should be privatised first to achieve the hight like china

    • @davidalexsebastiank6250
      @davidalexsebastiank6250 Рік тому

      Government has proposal for Privatization of Railways (Except Operations)

    • @priyabratadash9907
      @priyabratadash9907 Рік тому +1

      @@davidalexsebastiank6250 but the proposal will not turned into reality in near future

    • @davidalexsebastiank6250
      @davidalexsebastiank6250 Рік тому +1

      @@priyabratadash9907 True, may be after 2100 only the proposal will get into reality and by that time we will not be there in this earth

  • @iofprovidenceonu
    @iofprovidenceonu Рік тому +4

    The Railways system in Northeast needs an overhaul and should be connected to the rest of the country with High Fast Train so that the unemployed youth can travel for work across the country. At the moment only flights offer time saving travel experiences but the cost for flight is so high that it can't be afford by many people.
    The railway minister should come up with two railway tracks running parallel to one another dedicated for local and inter state trains or goods trains.
    If Highways and flyovers can be introduced for rails like road vehicles it can cut down the train traffic and open up spaces for faster moving of the trains.

  • @dholakpurkirakhi434
    @dholakpurkirakhi434 Рік тому +8

    we are late in railway but we can be fast in water transport if we want

  • @gagandeepsharma7972
    @gagandeepsharma7972 Рік тому +15

    I have done internships in Northern Railways
    Railway employees are the most inefficient employees I have seen they are not innovative their attitude is very poor they are not passionate towards their work
    they are same people with government employees attitude many selected via reservation
    And they have some Trade Unions of employees which doesn't allow them to work
    Railway can only be modified with privatisation including new High speed railway line Rapid Rail etc
    current railway infrastructure cannot be upgraded above a certain level

    • @davidalexsebastiank6250
      @davidalexsebastiank6250 Рік тому

      That's the reason why Government wants to privatize railways (except operations)

  • @ss-yg5ot
    @ss-yg5ot Рік тому +5

    You cannot compare country geography to other. In India Railway station are nearby as compared to country like usa,china plus outside interference like chain pulling, failure due to outsider.

  • @niraj2020
    @niraj2020 Рік тому +4

    Good current topic selected. Thanks. The life line of india govt largely ignored compare to road. Modernisation of high speed track which needed to be raised to minimum 300 kmph instead of 150 kmph, Modernisation of signalling system, new track and shortest routes etc. needed of an hour. Many key green, brown rail corridor required as 4 lane on ground and 4 elevated on same place solve semi and high speed train. Freight can be used on two track.

  • @mandarp9472
    @mandarp9472 Рік тому +2

    India needs 4 no or 6 no of tracks on major lines like Mumbai Delhi, Delho Kolkata

  • @indiantrainloversbymishu
    @indiantrainloversbymishu Рік тому +2

    Train slow se jyada problem nhi hai Bhai, balki traino me badhti Hui bheed aur sleeper, general coaches ke Kam karne se problem hai,train slow hai chalega bs yatra mangalmay honi chahiye

  • @raahullsngh3631
    @raahullsngh3631 Рік тому +5

    Just reached Pune in a full ac train
    1 day 6 hours late....

  • @babluporel8162
    @babluporel8162 Рік тому +4

    Political interference and mindset of people are also important. In local trains fare is almost negligible still 80% are travelling without ticket.

  • @jaikamal9146
    @jaikamal9146 Рік тому +1

    Video was to the point. Saying this as a Loco pilot. Very informative video.

  • @ranajoychanda6733
    @ranajoychanda6733 Рік тому +1

    This is the actual reality of 5 largest economy in the world

  • @Ground_Traveller
    @Ground_Traveller Рік тому +3

    The title of the video should be why slow railways defeated India till now as this is going since independence! I’m stunned that the speaker on this video didn’t talk much about the efforts current govt putting in to improve railways.

  • @robinshrivastav
    @robinshrivastav Рік тому +2

    Previous governments had totally ignored track repair and renovation which had now piled up. Certainly this has now become an Herculean task. It also appears that steel grade of tracks is also not equal to such as Japanese grade tracks therefore Japan is laying Japanese tracks for Indian bullet train. India must focus to upgrade for strong superior track manufacturing and track laying should more strong and durable. Another problem is manual permission to enter station platforms and trains had to wait on outer although platforms are not occupied by any other train. Signalling should be made 100% automated.

    • @Rahul-kp6wn
      @Rahul-kp6wn Рік тому

      Previous govt did broad gauge upgradation. Electric upgradation. New tracks Laid. Now they only focusing on introducing new trains.

    • @robinshrivastav
      @robinshrivastav Рік тому

      @@Rahul-kp6wn certainly broad gauge was laid but due to track becoming older speed of trains were gradually compromised

    • @gauravsharma_7
      @gauravsharma_7 9 місяців тому +1

      Bro L and T is laying tracks for HSR in India not Japan. They maybe using its technology.

  • @funtimetamil3441
    @funtimetamil3441 8 місяців тому +1

    Give tax exemption for people to invest in this kind of railway project
    That will help boost financially

  • @chavdabhai9929
    @chavdabhai9929 Рік тому

    तेज रफ्तार की कोई जरूरत नही है जो है वही ठीक है 🇮🇳😍 love Indian train

  • @akshaytondwal1360
    @akshaytondwal1360 Рік тому +6

    Indian Railways are very unsafe

  • @nitindesai7738
    @nitindesai7738 Рік тому +2

    Dedicated elevated corridors like RRTS b/w cities are very important. Dedicated freight corridors is also need of the hour.

  • @soubhagyajigautam522
    @soubhagyajigautam522 11 місяців тому

    7:36 I am glad to see Ginni Kapoor who is the model in song “Libaas” , “Mere Kol” etc.

  • @akaash4357
    @akaash4357 Рік тому +2

    Corruption is the only reason for all the problems in India Govt system

  • @Unknown23-x9b
    @Unknown23-x9b Рік тому +3

    We should construct more platforms on busy stations so the train doesn't wait for the platform to decide.

  • @santoshkumarbhat3053
    @santoshkumarbhat3053 Рік тому +2

    Doubling tripling and quadrupling is the need of the hour to decongest and increase speeds

  • @iamaditya024
    @iamaditya024 Рік тому +1

    In covid period our railways route replace older track and electrify it within 80days bound period from jaunpur to janghai

  • @pavanG98
    @pavanG98 Рік тому

    भले ही धीमी हो पर फिर भी भारतीय रेल वायुयान सेवा के बाद सबसे तेज है।

  • @pavanG98
    @pavanG98 Рік тому +2

    Firstly Indian citizen should be aware of train rules
    Anybody pull the chane any time without any reason and for tiny cause.
    Also train management responsible for slow training.
    And some employees of railway unaware and do not want fast working.

  • @crezyforyou8104
    @crezyforyou8104 11 місяців тому +1

    141cores basically depends on India railway how to utiliase the money on tracks, what percentage people depend and connected track also industries invelovd also rural area how to connect cities area govt emfasis on it

  • @TheSingh333
    @TheSingh333 Рік тому +1

    Jsw and sail hard headed rail ka production krne me bahut saksham hai jiska export Europian countries me export krti h jiski length 512 metre h. Still indian railway 26 and 52 metre tAk length ki old rail use kr rhi h jiske chalte speed limited hai.

  • @asktastic12
    @asktastic12 Рік тому +1

    The British railways were just a consolation, it was nothing spectacularly planned

  • @ammasgurupra6254
    @ammasgurupra6254 Рік тому +1

    India is a democratic country. Such developments cannot be brought in 5 or 10 years .

  • @Akbahi-d4w
    @Akbahi-d4w Рік тому +1

    Exactly even abhi bhi government use common problem ko solve karte hue Nahin dekte for example Amrit Express which is lots of the structure and body design completely updated even the government introduce push and pull method but what about design the design old and outdated

  • @yashaswisingh268
    @yashaswisingh268 Рік тому +2

    also mention that chinese railways is loss making in most of the routes and also the ratio of accidents in china is very high and how the chinese economy is a bubble which is about to explode

    • @imviiku
      @imviiku Рік тому +1

      LOL ! China will be 5 times better than us even if their so called bubble gets burst

  • @Smile-zf1xu
    @Smile-zf1xu Рік тому +2

    Monetisation of railways assets provide addition source of money generation to railways that will help railway to grow faster and its also generate employment and convenience to the passengers.

  • @chekkalarajkumar2556
    @chekkalarajkumar2556 Рік тому +1

    इसका मतलब यह है कि रेलवे का निजीकरण समस्याओं का समाधान नहीं है, सरकारी निवेश बढ़ाया जाना चाहिए, क्योंकि निजी ऑपरेटर ट्रैक बदलने में निवेश करने के लिए तैयार नहीं हैं, वे केवल पुराने ट्रैक पर चलने वाली रेल लाइनों को लाभदायक तरीकों से लेकर तत्काल लाभ की तलाश में हैं। . इसके अलावा, कोई भी निजी कंपनी रेलवे की जरूरतों के लिए अनुसंधान और विकास पर ध्यान केंद्रित नहीं कर रही है

    • @gagandeepsharma7972
      @gagandeepsharma7972 Рік тому +3

      भाईसाब भारतीय रेल में जो विकास हुआ है है न
      वो निजीकरण से ही हुआ है
      जो ये वनडे भारत ट्रैन है इसका मूल हिस्सा मेधा नाम की कंपनी ने बनाया है
      और जो बुलेट ट्रैन चलनी वाली है उसका सारा ढांचा L&T नाम की कंपनी बना रही है
      पटरियां सिग्नल सिस्टम लोकोमोटिव व् कोच सब निजी कंपनियों का ही अविष्कार है

    • @gagandeepsharma7972
      @gagandeepsharma7972 Рік тому +3

      जितनी भी नयी पटरियां और लाइने आज बिछाई जाए रही है वो निजी कंपनियां ही बिछा रही है

    • @arshSandhu781
      @arshSandhu781 Рік тому +2

      Privatisation is the one nd only solution to increase efficiency of indian railways

  • @DEEPAKSHARMA-hu7ok
    @DEEPAKSHARMA-hu7ok Рік тому +1

    Superfast train sppeed should average 110
    Espress or maill 100
    Passenger 80
    Freight 70 average speed honi chahiye
    Or vande bharat tejas rajathani shatabdi inki 130 average

    • @DEEPAKSHARMA-hu7ok
      @DEEPAKSHARMA-hu7ok Рік тому

      Ye sppeed atleast har route par honi chahiye

    • @DEEPAKSHARMA-hu7ok
      @DEEPAKSHARMA-hu7ok Рік тому +1

      Steps to invrease speed turn need minimize
      Stoppage should be increase
      Track should be improve
      Fencing on high density area
      Signal should be improve

  • @RohitBara-iy8oh
    @RohitBara-iy8oh Рік тому +1

    Late for 5 hours became a common thing.

  • @vnsss3431
    @vnsss3431 Рік тому +3

    Encroachment near tracks r real problem

  • @rajvirdee1317
    @rajvirdee1317 Рік тому +2

    Best to modernise.Its expensive but its worthvile over long time.

  • @KokchaFamily-y6g
    @KokchaFamily-y6g Рік тому +1

    Just watched " The Railway Men" on Netflix & when opened youtube this video was my first suggestiom

  • @ShambhaviK-ki2nu
    @ShambhaviK-ki2nu Рік тому +4

    AC local fare is very high it's more then metro y so

  • @MANISHKUMAR-s1q6i
    @MANISHKUMAR-s1q6i Рік тому

    Our current trains coach (LHV) can afford 200 kmph speed with EP bracks but due to old track and congestion . They are being operated at 110-130 kmph

  • @itsme_vinayupadhyay234
    @itsme_vinayupadhyay234 Рік тому +1

    Kuch agriculture students k leye bhe video banye bhaiya. Jii 🙌

  • @Sanojkumar-m9k4e
    @Sanojkumar-m9k4e 2 місяці тому

    रेलवे जोन और उनके मुख्यालय का भी एक वीडियो बना दीजिए 🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏 मैप के जरिए मैप

  • @intafansari4761
    @intafansari4761 8 місяців тому

    We need Gadkari sir he can solved this problem like he knows roads maker

  • @Rjj323
    @Rjj323 Рік тому +2

    Wrong question sir, correct question should be why india is so slow?

  • @jadoobaba3530
    @jadoobaba3530 Рік тому +2

    Mere Side to UNDERPASS rainy season me SWIMMING POOL bann jata hai 😝😝

  • @psyclist1426
    @psyclist1426 Рік тому

    Tracks are overburdened by trains because train routes are politically motivated. There are shorter routes between two cities but still trains travel longer which increases fare and time also. Alternate routes are not being given attention. For eg if you have to travel from North to South there are only two main routes which are heavily conjusted ie via Konkan or via Bhopal Nagpur.

  • @sigmamen7241
    @sigmamen7241 Рік тому +3

    Thank you so much for the useful information 🙏🏻🙏🏻🙏🏻

  • @sachin199035
    @sachin199035 Рік тому

    Munirabad to maheboob nagar new railway line which reduces distance between Hyderabad to Goa is sanctioned in 1997 , work started in 2011. still the work is going on. I think it will complete in 2050.

  • @ayushjha2345
    @ayushjha2345 Рік тому

    Route management acha banna chahiye. Top priority trains ko jane k liye dusre trains ko rok ke rakha jata he...metro system apna chahiye railways mein tab back 2 back trains chalte rahegi

  • @tushar..1575
    @tushar..1575 Рік тому +1

    Without ac coaches train ki speed ko nahi badaya ja sakta hai..aur logo me civic sense ke bina railways ko clean nahi rakh payenge...

  • @RunArt-ov6br
    @RunArt-ov6br Рік тому

    From rourkela to jamshedpur (160km), it takes train 3 hour 30 minutes.

  • @jmishra79
    @jmishra79 Рік тому

    Yes I agree
    Kal hi me aya hu chhath me bihar gaya tha tab 1 sec bhi Late nahi thi per ate samye pure 15 ghate late thi

  • @Dear_parvez
    @Dear_parvez Рік тому

    "जिस स्टेशन पर स्टॉपेज नहीं है वहाँ भी सेफ्टी purpose से स्पीड 30kmph से कम रखी जाती है" वाली बातें सरासर गलत है।
    आप जिस PSR की बात कर रहे वो किसी SPL CASE में लागू होता है और हर केस में PSR SPEED अलग होती है।

  • @bismayakhilar3526
    @bismayakhilar3526 11 місяців тому

    Yes economic growth ke liye bahat jarruri hai, railway ko fast Karo time ki bachat hoga

  • @amansaini6908
    @amansaini6908 Рік тому +6

    sir, we have one more problem inside India what about the peoples who wants to derail trains and throw stones at Vande Bharat?? (you know whom I am talking about.)

  • @polaris1985
    @polaris1985 9 місяців тому

    My brother is in IT in banglore and still uses train to travel back to Delhi because he is scared of flying

  • @kumargautamable
    @kumargautamable Рік тому

    Huge investment is an integral part regarding improvement in indian railways. If govt invests more ticket fare will be high. Many indian s are incapable of spending that much money. Being impracticable govt can not afford huge investment in railways.

  • @bismayakhilar3526
    @bismayakhilar3526 11 місяців тому

    Govt should finish tripple line rly route &than start fourth line rly route,speed limit 250kmph semi high spped train like vande Bharat, Tejas, Durant express

  • @priyabratadash9907
    @priyabratadash9907 Рік тому +3

    Indian railways is behind because of their employees

  • @priyanshu166
    @priyanshu166 11 місяців тому

    Monetisation can play a significant role in improving the issues being faced by Indian railways.Due the low revenues infrastructures are not being developed at the holistic rate.

  • @ABHISHEKSingh-nk7yf
    @ABHISHEKSingh-nk7yf Рік тому

    Indian railways bus 57% leti hai travelling cost ka 😢 , 100% leti but suwidhaye mil jaye to bahut aacha hota 😊

  • @imviiku
    @imviiku Рік тому

    My Dream was to see All AC Trains in India but With Introduction of Vande Sadharan i guess its a distant dream now

    • @davidalexsebastiank6250
      @davidalexsebastiank6250 Рік тому

      On one side people are crying that why Railway is reducing General and Sleeper coaches

  • @souravtewari4597
    @souravtewari4597 Рік тому

    Old background music is back 😊
    Love you sir ❤️
    Thank You 😊

  • @touristandtravel1665
    @touristandtravel1665 Рік тому +1

    100%true, boring speed of Indian railway

  • @KGopidas
    @KGopidas 9 місяців тому

    We are to run passenger and freight trains on different tracks and avoid level ctosdings

  • @krish4u85
    @krish4u85 Рік тому +2

    Rail fares are so cheap, people plan journey anytime just for useless reasons. Just for tafri. At the same time they have own four wheeler & two wheelers for personnel use

  • @TGill22
    @TGill22 Рік тому +1

    Ok we are getting Aerodynamic Passenger trains but not freight trains??? The thing that make us more money and contributes in economy we are not getting aerodynamic trains for that???
    What is this??

    • @animadas2306
      @animadas2306 Рік тому +4

      Aerodynamic design dene se kuch na hone wala.
      This design is only useful when train is moving at a considerable high speed. Average Fright train speed in India is 25km/hr. So this design will only create a burden on Manufacturing & maintanence

    • @TGill22
      @TGill22 Рік тому +1

      @@animadas2306 we are improving tracks and making separate tracks for freight trains so goods can travel fast as this video explains. The point is if we are making fast tracks why not include trains with a design that can make them fast instead of a box

  • @nipundubey6586
    @nipundubey6586 Рік тому

    We are adding models show case in india but core infrastructure still lags behind and need strict qaulity audit and actions.

  • @suvamsingh55
    @suvamsingh55 Рік тому +4

    Railway budget should be re introduced to focus only on railways
    What about fare difference compared to other countries