  • THIS IS TO DISCUSS ABOUT STEEL STRUCTURE ERECTION ACTIVITIES INCLUDING THE MAIN STEEL STRUCTURE, PIPE RACK, PLATFORM, LADDER, HANDRAIL, ETC. THE MODIFICATION AND/OR REPARATION DUE TO THE DRAWING UPDATE, SITE INSTRUCTION, MODIFICATION, ETC. ARE COVERED ALSO.
    • THE ERECTION OF STRUCTURAL STEELWORK CONSISTS OF THE ASSEMBLY OF STEEL COMPONENTS INTO A FRAME ON SITE. THE PROCESSES INVOLVE LIFTING AND PLACING COMPONENTS INTO POSITION, THEN CONNECTING THEM TOGETHER. GENERALLY THIS IS ACHIEVED THROUGH BOLTING.
    STRUCTURAL STEEL-MATERIAL RECEIVING, HANDLING & STORAGE:
    TO ENSURE THAT ALL STEEL STRUCTURE MATERIALS REQUIRED FOR CONSTRUCTION WORK SHALL CONFORM TO THE PROJECT SPECIFICATION. AND BY APPLYING APPROVED CONTROL PROCEDURES DESCRIBED HEREIN TO PREVENT THE UNDESIRABLE USE AND TO SET UP THE TRACEABILITY OF THE MATERIALS.
    MILL TEST REPORTS FOR THE STRUCTURAL MATERIALS ARE FURNISHED AND VERIFIED TO CONFORM TO THE REQUIREMENTS OF THE APPLICABLE SPECIFICATION. CHECK THAT MATERIALS ARE FROM APPROVED SUPPLIER.
    MILL TEST REPORTS SHALL CONFORM TO THE INSPECTION DOCUMENTATION REQUIREMENTS OF EN 10204, TYPE 3.1 AS FOLLOWS:
    A) MFG DECLARES THAT THE PRODUCTS SUPPLIED ARE IN COMPLIANCE WITH THE REQUIREMENTS OF THE ORDER AND IN WHICH HE SUPPLIES TEST RESULTS.
    B) TEST UNIT & TESTS TO BE CARRIED OUT ARE DEFINED BY PRODUCT SPEC, THE OFFICIAL REGULATION & CORRESPONDING RULES AND/OR THE ORDER.
    C) THE DOCUMENT IS VALIDATED BY MFG'S AUTHORIZED INSPECTION REP, INDEPENDENT OF THE MANUFACTURING DEPARTMENT.
    4. THE STEEL STRUCTURE MATERIALS REQUIRED FOR CONSTRUCTION WORK SHALL NOT BE RELEASED FOR USE UNTIL THAT IT HAS NOT BEEN INSPECTED OR OTHERWISE VERIFIED. ALL THE MATERIALS MUST BE ISSUED WITH PROPER DOCUMENTS AND UPDATED IN THE STOCK INVENTORY SYSTEM.
    5. ALL THE RECEIVED STEEL MEMBERS AND SITE CONDITION WILL BE REVIEWED BEFORE ERECTION STARTED. SKILLED WORKERS, PERMITS, VEHICLES, TOOLS, SITE FACILITIES AND OTHER MATERIAL REQUIRED SHALL BE CONFIRMED AS PER PROJECT SAFETY AND QUALITY REQUIREMENTS.
    FOR THE FULL KNOWLEDGE, PLEASE REFER TO THE VIDEO.
    If You're Reading This, Leave A Like, Comment And Subscribe!
    ▂ ▃ ▄ ▅ ▆ ▇ ▇ ▇ ▇ Open Me ▇ ▇ ▇ ▇ ▆ ▅ ▄ ▃ ▂
    Description: This Video is the second step to get familiar with a Welding Procedure Specification. How It looks, What are the basic components of WPS? Essential Non Essential variables, From where to pick the data? Comparison of the International Qualifying Standards in relation with the WPS Variables. ASME B 31.3, ASME B31.4, ASME B31.8, API 1104 Comparison of the WPS requirements. Discussion of all modules of a WPS taking a sample example.
    ▬▬▬▬▬▬▬▬▬▬▬▬ FAQ ▬▬▬▬▬▬▬▬▬▬▬▬
    Q. Who am I ?
    Ans : I am a pipeliner in Saudi Arabia (Gulf) who has been working with oil and gas field for the past 21 years.
    Q. What's my specialty?
    Ans : I head the quality control department of an MNC in oil and gas control for the past 12 years.
    Q. Why am I making videos about Oil and Pipeline?
    Ans: To teach the basics about Oil and Pipeline, Job Opportunities , Placement in Gulf countries , Inspections and Interview procedures and more !! this channel is for people who are in need for some experienced voice.
    ▬▬▬▬▬▬▬▬▬▬▬ Other Videos ▬▬▬▬▬▬▬▬▬▬
    1. Do You know how to construct Pipeline, Pipeline Construction Process Flow, How to Construct pipeline
    2. How to prepare a WPS? HOW TO PREPARE A WELDING PROCEDURE (WPS) Part 1 to 7-
    3. DESTRUCTIVE MECHANICAL TESTS FOR WELDS TENSILE HARDNESS BEND IMPACT FRACTURE MACROETCHING CTOD WELDS
    4. UNDERWATER WELDING & INSPECTION
    5. PROCUREMENT QUALITY ASSURANCE AND CONTROL IN PROCUREMENT -
    6. CALIBRATION of PRESSURE GAUGES AND RELIEF VALVES, DO YOU KNOW IN HOUSE CALIBRATION, CALIBRATION LAB
    7. CATHODIC PROTECTION FOR PIPELINES, CP, ICCP, SACRIFICIAL ANODES, CORROSION PROTECTION OF PIPELINES
    8. SELECTION OF VALVES, DO YOU KNOW BASIC PROPERTIES OF A VALVE?, WHICH VALVE TO BE USED FOR ISOLATION?
    9. Do you know where are you going to work in Oil & Gas Field Construction? Familiar Code definitions.
    10. Welding, welded Joints Type Design know how, Basic Processes, Advantage Disadvantage Applicatrion
    11. Opportunities in Gulf Saudi Arab types of Job culture Salary OIl & gas field network terminology
    12. Oil and Gas field exploration process flow know how
    13. INTERESTING FACTS FOR FLANGES & FLANGE FACES?
    14. What is POST Weld Heat Treatment, #PWHT, Stress Receiving, WHEN WE DO PWHT? Dos & Don't s of PWHT
    15. INTERESTING FACTS FOR FLANGES & FLANGE FACES? studio.youtube...
    16. Metals, Non metals: studio.youtube...
    17. What is Pigging? Uses of Pig, pipeline Internal cleaning, caliper survey:: studio.youtube...
    ▬▬▬▬▬▬▬▬ Thanks for watching ▬▬▬▬▬▬▬▬▬▬

КОМЕНТАРІ • 8

  • @dipankarroychoudhury6023
    @dipankarroychoudhury6023 Рік тому +3

    good information great work

  • @adlialias3081
    @adlialias3081 7 місяців тому +1

    Hi. When recriving material, what is the lab test usually done for the steel material before we use it for fabrication?

    • @soumendey1331
      @soumendey1331 6 місяців тому +1

      When receiving structural materials, we only need to do visual inspection for STC- size type and condition. During final inspection- before releasing materials many NDT or DT need to be performed like- Ut for thickness and lamination check

  • @naveenvikrampmp7808
    @naveenvikrampmp7808 Рік тому +1

    Excellent effort!
    Entire process flow is covered in this video
    Is there any specification available for structural erection which is followed in oil and gas construction industry?
    Please advice sir😊

    • @OilandGas-inspection-soumen
      @OilandGas-inspection-soumen  Рік тому +1

      The basic structural work like pipe racks, Typical pipe supports are the general scopes we are doing during Pipeline or Piping installation work. Most of the cases, Applicable international standard for design, installation and WPS qualification AWS D1.1 Your client might have any special requirements or codes- which is not very often. So, you can say AWS D 1.1 is the Bible. There might be some standard Drawings, PIP (Process Industry practices), project IFC drawings

    • @OilandGas-inspection-soumen
      @OilandGas-inspection-soumen  Рік тому +1

      The basic structural work like pipe racks, Typical pipe supports are the general scopes we are doing during Pipeline or Piping installation work. Most of the cases, Applicable international standard for design, installation and WPS qualification AWS D1.1 Your client might have any special requirements or codes- which is not very often. So, you can say AWS D 1.1 is the Bible. There might be some standard Drawings, PIP (Process Industry practices), project IFC drawings