SCHILTHORNBAHN 20XX - Rope hoist section1

Поділитися
Вставка
  • Опубліковано 3 жов 2024
  • How does the suspension cable of the Schilthornbahn 20XX get into place? It takes a mixture of good preparation, healthy thrills, the teamwork of everyone involved and precision - eye to eye with the helipilot. Once again it's clear: precise teamwork on the construction site of the Schilthornbahn 20XX. Impressively calm and experienced, the helipilot flies almost vertically up the 600 metre difference in altitude from Stechelberg - the leader rope in tow. This must first be pulled into the pulleys with millimetre precision, then the suspension rope is pulled in from the valley. The rope is tensioned from the mountain after everything has been perfectly and securely fixed in the valley.
    Find more information about the project here:
    schilthornbahn...

КОМЕНТАРІ • 8

  • @EricWyss-dy2tb
    @EricWyss-dy2tb 17 днів тому

    Super erklärt! Freue mich auf die neue Bahn!!😃👍🏻

  • @dbickel5877
    @dbickel5877 3 місяці тому +3

    super bitrag, danke

  • @jeffbangkok
    @jeffbangkok 3 місяці тому +2

    Amazing. Good evening from Thailand

  • @nepalcablewayscompany
    @nepalcablewayscompany 3 місяці тому +3

    That old fellow is a legend! Wow

  • @fabienneliechti759
    @fabienneliechti759 2 місяці тому

    Meisterleistung während des laufenden Betriebes diese riesige Baustelle zu betreiben🥳 Danke😉

  • @andrewhansen3713
    @andrewhansen3713 2 місяці тому

    Amazing to learn what was going on as we were there when the helicopter flew the cables up.

  • @vfifty9182
    @vfifty9182 16 днів тому

    Was verdient so ein Monteur? Sicher um die 40 Franken?