Labor Productivity Rates For Construction Projects

Поділитися
Вставка
  • Опубліковано 23 гру 2024

КОМЕНТАРІ • 31

  • @Musaisa1209
    @Musaisa1209 Рік тому +8

    I am very surprise, why this gentleman is not getting views ??!! So understand able & based on practical market
    Huge respect you dear 👍

    • @CEPQS
      @CEPQS  Рік тому

      Thanks a lot for your support and wish you all the best

  • @ofonimeokwum174
    @ofonimeokwum174 10 місяців тому

    I am a quantity surveyor and new to your channel.
    Thank you for teaching in a simple and straightforward way. Learning a lot already.

  • @aadil6027
    @aadil6027 Місяць тому

    Should we take dry volume for concrete.

    • @CEPQS
      @CEPQS  Місяць тому

      I believe this comment belongs to another video 😃

  • @maureenlemos62
    @maureenlemos62 Рік тому

    very comprehensive analysis

  • @benoevabeta8878
    @benoevabeta8878 Рік тому

    Good explanations of productivity, what do they mean when they say productivity is equal to one

    • @CEPQS
      @CEPQS  Рік тому

      Thanks you 👍. 1 means one unit of this item. It can be installation of sign board or site office for example

  • @ahmedsalman3294
    @ahmedsalman3294 Рік тому

    Great content. Do you have any specific estimation training for ELV (SCS, Security, AV, BMS, etc)

  • @gorgiassokrates
    @gorgiassokrates 2 роки тому

    Mr Adel
    I have question
    Whatif i added 1 more laborer any of them how can i calculate the new productivity?
    For example curbstone fixing with 1 mason 1 helper doing 15 m2
    If i add 1 helper how can i calculate new productivty?
    Thanks

    • @CEPQS
      @CEPQS  2 роки тому

      Thank you for the question. See, the productivity is the assumption upon which the cost will be estimated, and hence it should be realistic and practical. So how to know the impact of the 1 helper that you want to add to the group? This can come from observation or past experience or historical data or other online resources that talks about productivity. But in general labors are different from each other depending on age and strength and many other factors. So whatever expected productivity from a specific number of labors is just an assumption that built on some realistic basis as mentioned above.

  • @soonaro1965
    @soonaro1965 Рік тому

    thankyou very much sir..good explanation

  • @Cerratoman
    @Cerratoman Рік тому

    Thanks for share your knowledge

  • @tariqaziz6643
    @tariqaziz6643 2 роки тому

    I appreciate your effort .
    cost estimation paid coarse is on real and actual project of a multistory building?
    because many instructor assumes to much which is useless in real life,
    assumption can't work in engineering,
    we want to learn actual, accurate,precise, quantity take off and cost estimation,which can be use in real life practice.

  • @vinothshalabha3200
    @vinothshalabha3200 2 роки тому +1

    I like ur explanation for civil productivity video. I give 5star ur expln

    • @CEPQS
      @CEPQS  2 роки тому

      Thanks a lot 🙏😊

  • @maznunmasfi9873
    @maznunmasfi9873 2 роки тому +2

    Sir i am watching all of your videos which increasing my knowledge.. Is it possible you can provide us the template sheet for the labour productivity?

    • @CEPQS
      @CEPQS  2 роки тому

      Hello Maznun and thank you for your valuable time watching and I hope this channel helps you get better always🙏. This sheet is part of the cost estimation course as it is linked to some other sheets where the manpower costs are calculated, and hence it can’t be shared alone. Hence please note down the productivities and create a similar sheet for productivity use only. Thank you again and wish you all the best 👍❤️

  • @vinothshalabha3200
    @vinothshalabha3200 2 роки тому +1

    If I have any doubt in construction.pls send ur explanation as soon.

    • @CEPQS
      @CEPQS  2 роки тому

      Sure thing 👍👍

  • @vinothshalabha3200
    @vinothshalabha3200 2 роки тому +1

    Civil productivity nice we r waiting for MEP. Some are missing riprap. Chain link fence. Kerb stone . cutting and bending steel. machinery productivity also. Already I sent request regard primevera full project with BOQ cost load and project cost as budget ( resources)

    • @CEPQS
      @CEPQS  2 роки тому

      I’ll try my best to have them here for you 😊, btw, are you Quantity Surveyor or Planning Engineer ?

  • @omisajan2120
    @omisajan2120 2 роки тому +1

    could you please send me this excel formate?

    • @CEPQS
      @CEPQS  2 роки тому

      I don’t always have access to the PC where I keep these files, and hence file sharing is a bit difficult at the moment. Thank you for reaching out 🙏🙂

  • @FarmerChandran
    @FarmerChandran 8 місяців тому

    very useful

  • @chilufyachristopher9804
    @chilufyachristopher9804 2 роки тому +1

    Thank you professor for the insight.😅😅👏👏

    • @CEPQS
      @CEPQS  2 роки тому

      Thank you bro for watching and your continuous support 😊🙏. Planning and scheduling is also coming soon 😍

  • @engrxiddig
    @engrxiddig 2 роки тому

    Maasha alaah I love you

    • @CEPQS
      @CEPQS  2 роки тому

      Thanks a lot for the support and I’m so happy you are part of this community 🙏.

  • @faisaldilshad6765
    @faisaldilshad6765 2 роки тому +1

    👍

    • @CEPQS
      @CEPQS  2 роки тому

      Thank you brother ❤️🙏