  • Falling weight Deflectometer, Use of FWD, Design of overlay using Falling weight Deflectometer, Pavement Evaluation by FWD, Residual life of in-service pavements, Principle of Pavement Evaluation using FWD, Features of FWD, Pavement Condition Surveys, Deflection Measurements using falling weight deflectometer, Deflection Measurement Scheme, Steps for Measuring Deflection using FWD, Application of KGPBACK software, Back calculation method for elastic moduli, design traffic, fatigue life, rutting life,
    Other Videos
    Traffic Engineering
    L-1 Derivation of Q = KV • #traffic, flow paramet...
    L-2 Macroscopic traffic flow modeling: • #trafficflowmodeling, ...
    L-3 LOS on Two-Lane Roads: • #trafficengineering, #...
    L-4 LOS on Multilane Highways: • #LOS, #trafficengineer...
    L-5 How to Reduce Conflict Points: • #traffic, How to reduc...
    L-6 Concept of Critical Gap : • #traffic, #gap, #headw...
    L-7 Critical Gap at Uncontrolled Intersections: • #capacity, #gap, Criti...
    L-8 Critical Gap at Roundabouts: • #capacity, #gap, Criti...
    L-9 Capacity of Roundabouts: • #traffic, #Capacity, C...
    Highway Engineering
    1. Proportioning of Aggregates : • #highways, Three Metho...
    2. Marshall Method of Mix Design : • #highways, Marshall Me...
    3. Vehicle Damage Factor: • #highways, Vehicle Dam...
    4. Design of Flexible Pavement: • #Highways, Design of F...
    5. Cumulative Fatigue analysis of CTB Layer: • #highway, cumulative f...
    6. Overtaking Sight Distance: • #highways, Overtaking ...

КОМЕНТАРІ • 148

  • @abhishekmittal1858
    @abhishekmittal1858 2 роки тому +1

    KGPBACK demo and overlay design procedure in one video...Excellent and very useful....

    • @SatishIITR
      @SatishIITR  2 роки тому +1

      Glad to know that you liked it. Please share with others also.

  • @dr.pritikanadas269
    @dr.pritikanadas269 2 роки тому

    Sir, very informative and useful lecture. Thank you for providing clear concept on pavement evaluation by FWD.

    • @SatishIITR
      @SatishIITR  2 роки тому

      Thanks, share with your friends and students.

  • @drpradeepkr
    @drpradeepkr 2 роки тому +1

    Very useful and informative presentation on FWD..

  • @Shera_di_kaum_punjabi-h2k
    @Shera_di_kaum_punjabi-h2k 2 роки тому

    Superb, very informative video.

    • @SatishIITR
      @SatishIITR  2 роки тому

      Thanks Vishal ji, please share the link to your known contacts.

  • @kaminimarut6499
    @kaminimarut6499 2 роки тому

    Sir very informative lecture

    • @SatishIITR
      @SatishIITR  2 роки тому

      Thanks, keep watching other videos also.

  • @ParshuramKumar-rv8rs
    @ParshuramKumar-rv8rs 3 місяці тому

    Sir, Thank you very much for sharing valuable information regarding overlay.

  • @user-yl6zy6xe4v
    @user-yl6zy6xe4v 7 місяців тому

    Thank you Sir for providing a detailed presentation.

    • @SatishIITR
      @SatishIITR  7 місяців тому

      You are most welcome, keep watching. Share the link with your friends also.

  • @rrdkirori
    @rrdkirori 2 роки тому +1

    Sir, thank you very much. Excellent educative ppt

    • @SatishIITR
      @SatishIITR  2 роки тому +1

      Most welcome. Please send the link to your known contacts

  • @bhupendra6372
    @bhupendra6372 2 роки тому +2

    Another very informative lecture.

    • @SatishIITR
      @SatishIITR  2 роки тому +1

      Thanks again. Keep circulating among your colleagues and students.

    • @bhupendra6372
      @bhupendra6372 2 роки тому

      @@SatishIITR Sure Sir.

  • @tapassau3937
    @tapassau3937 2 роки тому

    Thank you so much sir for this well explained video

    • @SatishIITR
      @SatishIITR  2 роки тому

      Please share the link with your friends also. If possible, post it on your LinkedIn page so that many others can also be benefitted.

  • @sarvjeet4488
    @sarvjeet4488 Рік тому

    Great sir thank you very much I appreciate your efforts.

  • @vankarvijay5881
    @vankarvijay5881 2 роки тому

    Very very thank you sir I can't find the how to run kgp back software after watching your video I am able to use kgp back software thankyou sir god bless you and keep uploaded this wonderful knowledgeable vidios. Thank you sir

    • @SatishIITR
      @SatishIITR  2 роки тому

      You are welcome. Please share the link in your groups also.

  • @be_independent1329
    @be_independent1329 2 роки тому +1

    Thank You 💖 SIR 💕

  • @abhijeetpangavhane6444
    @abhijeetpangavhane6444 2 роки тому +2

    Very well explained sir
    Can you please share KgpBack software

    • @SatishIITR
      @SatishIITR  2 роки тому

      Thanks. You can download the KGPBACK geotran.in/backcalculation-software

  • @aalex5842
    @aalex5842 Рік тому

    Thank you sir, very useful video. Can you do another presentation showing how to distinguish between different layers of flexible pavement in a test pit and how to evaluate strength of each layer.

    • @SatishIITR
      @SatishIITR  Рік тому +1

      Great suggestion! will try to do it.

  • @CanvasVibe
    @CanvasVibe 2 роки тому

    Sir I would request you to please provide videos on various pavement compositions. Like CTB, CTSB, RAP. Also sir please cover how we can convert different layer thickness into equivalent bituminous layer thickness.

    • @SatishIITR
      @SatishIITR  2 роки тому

      There is no such technically sound method that can convert a layer into equivalent thickness of bituminous layer.

  • @parasmanisindhia4493
    @parasmanisindhia4493 10 місяців тому

    Please note that IRC 115(2014) states that the subgrade modulus is 59.6 and the corresponding ranges selected for subgrade modulus are 57.2 to 83.4. But upon calculation the lower bound value comes out to be 1.2*59.6*0.8= 57.2 and the upper bound value comes out to be 1.2*59.6*1.2= 85.82 instead of 83.4 as mentioned in IRC 115(2014) pg 32. Please clarify

    • @SatishIITR
      @SatishIITR  10 місяців тому

      It does not matter whether it is 85 or 83. This range is given to the software to start the iteration and the final value will depend on the deflection values and layer thicknesses. The software has some weakness and I am sure these will be removed in the next revision.

  • @or9690
    @or9690 2 роки тому +1

    Nice video Sir. Our company has an almost identical KUAB in Bolivia, so it's good to see a similar FWD in other countries. I just want to know why you have two rows of buffers below the weights. Is it something related to the pulse duration? Thank you

    • @SatishIITR
      @SatishIITR  2 роки тому

      Thanks for watching.

    • @or9690
      @or9690 2 роки тому

      @@SatishIITR Can you explain why this FWD has 2 rows of buffers, please?

  • @naveenreddy3106
    @naveenreddy3106 2 роки тому +1

    Sir i would request you please kindly provide a lecture on FWD data collection for Airfield Pavements and Back calculation of material properties and over lay design
    If possible please

    • @SatishIITR
      @SatishIITR  2 роки тому +2

      will try. However, the method of data collection remains same at airfield pavements also.

  • @abhijeetkumar-wh5vc
    @abhijeetkumar-wh5vc Рік тому

    Design Life in IRC 37: 2019 is 20 years for flexible pavement and in IRC 115 : 2014 it is suggested for 10 to 15 years for design of overlay, basically my question is if we are going to widen existing two lane carriageway to2 Lane + PS, which traffic calculation will govern design either IRC 37 or IRC 115.
    Other query is if in widening for 30 MSA traffic and 8% Subgrade CBR crust thickness is 200 mm GSB + 250 mm WMM+ 95 MM DBM + 40 MM BC and overlay thickness by FWD test we are getting 90 mm BC over 120 mm existing Bituminous part, how layers will match in this case?
    Kindly explain my query

    • @SatishIITR
      @SatishIITR  Рік тому

      IRC 115 is for the purpose of overlay design only, not for the design of pavements.
      Layers must be matched from subgrade level. You need to dig the side so that base course layers in two pavements is at the same level.

  • @shubhamkumarsingh3449
    @shubhamkumarsingh3449 Рік тому

    Need for Overlays, Overlays design methods for Flexible and Rigid Pavements please make a video on this topic sir🙏🙏

    • @SatishIITR
      @SatishIITR  Рік тому

      all these points have been discussed in different videos. Watch overlay by Benkelman Beam method, and thin white topping

  • @abhisaitejareddy2443
    @abhisaitejareddy2443 3 місяці тому

    Sir, what is the moduli values consider for flexible pavement with CTB & CTSB layer for FWD analysis

    • @SatishIITR
      @SatishIITR  3 місяці тому

      In the FWD analysis, you can take initail value of moduli as suggested in IRC 37. The program will calculate it.

  • @abhijeetpangavhane6444
    @abhijeetpangavhane6444 2 роки тому

    Sir do you have any literature or something for design of bus/ truck lay byes

    • @SatishIITR
      @SatishIITR  2 роки тому

      There is an IRC code on this subject

  • @suryareddy9159
    @suryareddy9159 2 роки тому +1

    Sir in overlay design, we're the tensile strains considered under bottom of overlay or bottom of existing bituminous layer?

    • @SatishIITR
      @SatishIITR  2 роки тому +1

      bottom of the existing bituminous layer only.

    • @suryareddy9159
      @suryareddy9159 2 роки тому

      @@SatishIITR thanks sir

  • @milindjamble7987
    @milindjamble7987 2 роки тому

    Does poor pavement conditions need FWD? As normally such stretches are taken for reconstruction

    • @SatishIITR
      @SatishIITR  2 роки тому

      Yes, the decision of reconstruction will be taken based on FWD data

  • @prathibhaumapathi9771
    @prathibhaumapathi9771 2 роки тому

    Sir please make one more video on evaluation of rigid pavement by FWD

  • @luvyadav6620
    @luvyadav6620 2 роки тому

    Sir, if the existing Pavement has stabilized layers like BSM, or CTB/CTSB then during the use of KGPBACK software in which layer type should these layers be considered? Either Bituminous layer or Granular layer.. Especially incase of BSM with foamed bitumen?

    • @SatishIITR
      @SatishIITR  2 роки тому

      stabilized layers are more close to granular layers.

    • @luvyadav6620
      @luvyadav6620 2 роки тому

      @@SatishIITR Thank you so much Sir..

  • @milindjamble7987
    @milindjamble7987 2 роки тому

    Overlay is 95mm BC in example. Can this be put as 30BC and 65 DBM?

    • @SatishIITR
      @SatishIITR  2 роки тому

      Probably yes, will need to check.

  • @chintangajjar7397
    @chintangajjar7397 Рік тому

    Dear Sir,
    I would like to get clarity on the Remaining fatigue life, in your video it comes out as 11.07 msa which is less than 100 msa (design life). So if I have similar case where my remaining fatigue life is 17.1 MSA and 19 MSA (design) then, whether this will also require the overlay to match the design MSA 19 requirement?

    • @SatishIITR
      @SatishIITR  Рік тому

      Yes, you need overlay on this road so that pavement lasts its design life.

  • @milindjamble7987
    @milindjamble7987 2 роки тому

    Sir...please share one on CRCP design

  • @mrVINODKUMAR12
    @mrVINODKUMAR12 Рік тому

    Please make a video on rigid pavement also sir.

    • @SatishIITR
      @SatishIITR  Рік тому

      There is no other procedure for Rigid Pavements. An FWD is used on rigid pavement to evaluate the load transfer across slabs and can be used to detect large voids when
      significant erosion of the base material has occurred under the slab joints. An FWD is commonly used to determine the
      variability of overall deflection along the roadway alignment. The test pocedure is same.

  • @vaishalikachare9251
    @vaishalikachare9251 Рік тому

    Sir, how can we decide the range of moduli for granular layer if the granular layer is made up of WMM + CTSB.......Please guide

    • @SatishIITR
      @SatishIITR  Рік тому

      You can refer IRC 37 in such cases. It gives a procedure for such layers also

  • @er_javedansari4891
    @er_javedansari4891 Рік тому

    Fwd se gsb ya wmm ka thikness pata kar sakte hai kya

  • @dhruvpanchal1872
    @dhruvpanchal1872 5 місяців тому

    Sir
    In IRC 2015 given example so many problems... so i confused. Because 1st problem is poisonous ratio new payment of BT layer we take as par new pavement design is 0.35 as per IRC 37 andIRC 115 given 0.5.
    2) 2nd problem is Va-Vb we can change va-vb in different different project y we take Va 3.5 and Vb 11.5 as per IRC 115 example.
    3) in IIT PAVE how many analysis point use and how much radius use in road project? . Because in IRC 37-2018 IIT PAVE USE DIFFERENCE PARAMETERS AND IRC 115 USE DIFFERENCE PARAMETERS SO CAN U suggest me which can we used .

    • @SatishIITR
      @SatishIITR  5 місяців тому

      Yes, there is a confusion in Poisson ratio as suggested in IRC 115 and IRC 37. You can take any. There is very little effect of Poisson ratio on results.
      Generally we take 4 points for analysis. one at the depth of bituminous layer and radial distance zero, Two at same depth but radial distance 155 mm. three at the top of subgrade layer and radial distance zero, fourth, at top of subgrade layer and radial distance 155 mm.
      I have explained in my video on Design of Flexible pavement aslo. It is available in Hindi and English both. Watch it once.

    • @dhruvpanchal1872
      @dhruvpanchal1872 5 місяців тому +1

      Ok thank you sir

  • @Rezzashah67
    @Rezzashah67 2 роки тому

    Sir can u make a concept video on EV2 test ?

    • @SatishIITR
      @SatishIITR  2 роки тому

      The second deformation modulus EV2 is a very popular index of compaction standard of soil foundation in Germany, France and other European countries, but not in India. I will certainly make a video on Effective Modulus of Subgrade Reaction (K).

  • @arunkumarsingh2649
    @arunkumarsingh2649 2 роки тому

    Sir,
    1. Can we put 40mm BC and 55 mm DBM over existing BC.
    2. Can we lay DBM over existing BC being inferior grade.
    3. Or we have to mill the existing BC before laying 55m DBM and 40 mm BC.

    • @SatishIITR
      @SatishIITR  2 роки тому

      Arun Ji, It is always good to mill the existing BC if you can. It will save both natural resources and environment. If not possible, you can certainly put DBM layer over existing BC. Remember, you need overlay on a road because the existing structure has become weak. So BC is now a weak layer.

  • @sameermohammad7501
    @sameermohammad7501 Рік тому

    What if the 15th percentile of SG moduli is more than 100 MPa, shall we the same for overlay design or limited to 100 MPa,
    Pls tell us.

  • @sameermohammad7501
    @sameermohammad7501 Рік тому

    In kgpback we took poisson ratio of existing bituminous as 0.4 and in iitpave we took it as 0.4. Why

    • @SatishIITR
      @SatishIITR  Рік тому

      You wrote same in both cases. The Poisson ratio of bitumnous layer will increase with temperature. Test temp in FWD is higher than what we take in pavement design.

  • @shitydeshpaande5213
    @shitydeshpaande5213 Рік тому

    Sir, please guide about fwd for rigid pavement as per IRC 117-2015

  • @avinashmishra2254
    @avinashmishra2254 2 роки тому

    Sir why do we calculate temperature below 40 mm from the top ?

    • @SatishIITR
      @SatishIITR  2 роки тому

      Pavement temperature is not at the surface, it is inside the layer.

  • @a_d_arsh
    @a_d_arsh Місяць тому

    Sir,
    Please help in calculations of lower bound of subgrade it is not coming as given in irc 115

    • @SatishIITR
      @SatishIITR  Місяць тому

      How can I help you remotely??

    • @a_d_arsh
      @a_d_arsh Місяць тому

      @@SatishIITR sir the values are not coming as per the solved example

  • @saitharun9585
    @saitharun9585 Рік тому

    Thank you so much sir
    Sir, if i have deflection data at 200 m interval for a 4 km stretch , then should I input the deflection data at each interval one by one in KGPBACK or is there any other way to get the output from KGPBACK by giving deflections along the chainage at a time?

    • @SatishIITR
      @SatishIITR  Рік тому

      you need input the data at each location

    • @saitharun9585
      @saitharun9585 Рік тому

      Thank you sir

    • @saitharun9585
      @saitharun9585 Рік тому

      Sir, while calculating remaining fatigue life , what about the C value in the equation, factor C of volumetrics?
      How can we get C value sir?

    • @SatishIITR
      @SatishIITR  Рік тому

      @@saitharun9585 In the same manner as you take in the design of a new pavement.

    • @saitharun9585
      @saitharun9585 Рік тому

      @@SatishIITR okay sir
      Thank you sir

  • @sameermohammad7501
    @sameermohammad7501 Рік тому

    In iitpave the poisson ratio is taken 0.5, 0.4, 0.4, and 0.4.
    But generally we take these as 0.35. Pls explain why we took different

    • @SatishIITR
      @SatishIITR  Рік тому

      There is hardly any effect of Poisson ratios on stress calculations.

    • @sameermohammad7501
      @sameermohammad7501 Рік тому

      @@SatishIITR Thanks sir.

  • @Ajay-zn8mq
    @Ajay-zn8mq Рік тому

    Sir, why VG30 moduli take as 1695 MPA instead 2000 MPA for overlay ?

    • @SatishIITR
      @SatishIITR  Рік тому +1

      This is just an example problem. You can take 2000 MPa. No issues

  • @nareshreddy5463
    @nareshreddy5463 2 роки тому

    Sir,
    while we are doing the testing we are getting a thousands of testing locations on the entire road,so to run the kgp back its a time taking process to run each location deflections,
    can you give the solution to make it simple ( can you give the background formulas of kgp back ).
    if possible we will make it in Microsoft excel.

    • @SatishIITR
      @SatishIITR  2 роки тому

      sorry dear, I do not have the background formula. It is an iterative process to to match the assumed values of modulus with calculated values. I will try to find out from IIT KGP Professor, if he can help you out.

    • @nareshreddy5463
      @nareshreddy5463 2 роки тому

      @@SatishIITR
      Thanku very much sir,
      Try Sir I will always be grateful to you.

  • @abhisaitejareddy2443
    @abhisaitejareddy2443 2 роки тому

    Sir can u explain how to calculate the 15th percentile module values?

    • @SatishIITR
      @SatishIITR  2 роки тому

      15th percentile value of any data set is the value above which 85 percent data would lie. So if you a series of data (for example Mr values estimated at different locations of a highway) then arrange them in decreasing order and locate the value below which only 15 % values lie. This can also be done by making a frequency table and plotting cumulative frequency curve in excel sheet.

    • @abhisaitejareddy2443
      @abhisaitejareddy2443 2 роки тому

      @@SatishIITR Thank u for ur valuable information sir...

  • @leenabadgujar5870
    @leenabadgujar5870 Рік тому

    Sir how to select the poisson's ratio?

    • @SatishIITR
      @SatishIITR  Рік тому

      There is hardly any effect of Poisson Ratio on stresses. Take as per guidelines given in IRC 37

  • @kumodkumar1845
    @kumodkumar1845 Рік тому

    Hello Sir,
    can you provide me excel sheet of CC pavement for FWD? for find Radius of Relative stiffness?

    • @SatishIITR
      @SatishIITR  Рік тому

      There are no such excel sheets

  • @patelmanoj3002
    @patelmanoj3002 11 місяців тому

    sir please help from where we can get this software

    • @SatishIITR
      @SatishIITR  11 місяців тому

      This software is freely available for download on internet. Try

  • @manasswain5450
    @manasswain5450 Місяць тому

    Sir, Can you please share the KGPBACK moduli please

  • @prathibhaumapathi9771
    @prathibhaumapathi9771 2 роки тому

    please explin the normaliseation of fwd ಡಾಟಾ for standard load on rigid pavement with a set of data !
    I it's only the you for correct person to solve my problem so I am requesting you sir please explin me !

    • @SatishIITR
      @SatishIITR  2 роки тому +1

      Normalization here means extrapolation only. If deflection value for a load of 39 kN is 0.234, then for 40 kN it will be 0.234*(40/39).

  • @prashilmoon9738
    @prashilmoon9738 9 місяців тому

    Sir I can't find the KGPBACK software. Can you share the link please.

    • @SatishIITR
      @SatishIITR  9 місяців тому

      Unfortunately, I also do not have it. I made this video when I was in CRRI and took the help of one scientist there. Will try to get it for you, if possible.

    • @prashilmoon9738
      @prashilmoon9738 9 місяців тому

      @@SatishIITR That would be a great help sir. Please let me know if you find it somehow.

  • @vikiyoggi2
    @vikiyoggi2 Рік тому

    Kindly, provide excel sheets in the video if possible sir!..Thanks

    • @SatishIITR
      @SatishIITR  Рік тому +1

      There are no Excel sheets for this analysis. It is done through a software, which is provided by the IRC alongwith the code. You can download it www.geotran.in/back-calculation-software

  • @shubhambhalla4806
    @shubhambhalla4806 5 місяців тому

    Sir how to download KGP BACK Software?

    • @SatishIITR
      @SatishIITR  5 місяців тому

      It comes with IRC code. Not available for download

  • @technoconsconst.748
    @technoconsconst.748 3 місяці тому

    kgpback software link plz

    • @SatishIITR
      @SatishIITR  3 місяці тому

      There is no link available for this software. It comes with IRC code.

  • @parasmanisindhia4493
    @parasmanisindhia4493 10 місяців тому

    Sir
    F.W.D. The value of deflection is obtained from the test. Then how is the modulus value of each layer obtained? Sir please explain.
    It will be so kind of you.
    Thank you

    • @SatishIITR
      @SatishIITR  10 місяців тому

      Modulus of eavh layer is obtained using KGPBACK software. It is a program based on Genetic Algorithm and comes with the IRC code. I have explained this method in the video also.

    • @parasmanisindhia4493
      @parasmanisindhia4493 10 місяців тому

      Thank you sir

    • @parasmanisindhia4493
      @parasmanisindhia4493 10 місяців тому

      ​@@SatishIITRHow to get
      KGPBACK Software?

    • @SatishIITR
      @SatishIITR  10 місяців тому

      you can download it from internet@@parasmanisindhia4493

    • @parasmanisindhia4493
      @parasmanisindhia4493 10 місяців тому

      Sir, please provide the download link.

  • @BHARATKUMAR-zf4co
    @BHARATKUMAR-zf4co Місяць тому

    m 0.4
    P 40000
    r 1500 (1200+1500+1800)/3
    w 0.107 (0.134+0.107+0.08)/3
    E 66.67

    53.34 66.67*0.8
    80.00 66.67*1.2
    Im getting E value as 66.67 by using above parameters. Can you please tell me what I did wrong

    • @SatishIITR
      @SatishIITR  Місяць тому

      I did not understand these calculations and your question. Why did you take average of r and w?

    • @BHARATKUMAR-zf4co
      @BHARATKUMAR-zf4co Місяць тому

      @@SatishIITR As per code r is average of radial distances and w is average of surface deflections measured at 1200 mm, 1500 mm and
      1800 mm. My question is by using parameters for calculating subgrade modulus range Im getting the answer as 66.67 MPa

    • @SatishIITR
      @SatishIITR  Місяць тому

      @@BHARATKUMAR-zf4co a subgrade modulus of 66 looks fine

  • @CanvasVibe
    @CanvasVibe 2 роки тому

    Sir I wanted to ask you some questions

    • @SatishIITR
      @SatishIITR  2 роки тому +1

      sure,. you can write either here or you can send me an email.

    • @CanvasVibe
      @CanvasVibe 2 роки тому

      @@SatishIITR ok sir

    • @CanvasVibe
      @CanvasVibe 2 роки тому

      @@SatishIITR I wanted to ask you that it is possible to suggest reconstruction of the pavement section after performing the FWD test.

    • @CanvasVibe
      @CanvasVibe 2 роки тому

      After analyzing the data..after calculating the overlay required can we suggest this?

    • @CanvasVibe
      @CanvasVibe 2 роки тому

      Or else how can we analyze that the granular layer n subgrade are not sufficient enough to carry the design MSA

  • @abhishekchaudhary4497
    @abhishekchaudhary4497 2 роки тому

    Sir, can you upload link of this pdf ?

  • @subeeshxavier
    @subeeshxavier Рік тому

    Fugro India is going to start FWD in India