Tower crane disassembly Day 2 of 4: Counterweights, jib, trolley, hoist unit
Вставка
- Опубліковано 12 вер 2024
- Watching the dismantling of #towercrane number 1 from below in a series of time-lapses, at various speeds, both close-ups and wide shots from multiple cameras at multiple locations. On this second day (out of four days), they use the big mobile crane to remove the counterweights, jib, trolly and hook block, and the hoist unit. We also see some views of the mobile crane closing down for the night.
Originally, I thought this day was going to be only for assembling the mobile crane, but when I wandered over to check it out, I found that they were already starting the disassembly, so fortunately I got there just in the nick of time. I did have to take time out during the removal of the last counterweight to rush back and get more cameras and more batteries. The good thing is that, for once, they're working on a sunny afternoon, which is great for the photography. Normally, these kind of activities start early in the morning, which in San Francisco typically means fog and overcast, which is not great for photography. But not this time!
There's no dialogue or other audio, just music, so feel free to turn down the volume and provide your own accompaniment music if you don't like the music I have provided.
From Ⓗ series Week 161 (July 26-29, 2017).
Music licensed from AudioMicro.com. This video is not endorsing or recommending, nor was it endorsed by, any business, product, or organization. The appearance of, or mention of, any person, business, product or organization in it is not necessarily an endorsement or recommendation of or by that person, business, product, or organization. This recording is of views and scenes visible to the public.
Just watching this makes my knees shake.
Thanks for the awesome video! I learn something new everyday.
You're welcome!
There isn't enough money in the world to make me do what these guys do.
Welcome the Van Ness
tower crane
comes down
2017
0:29
I need something to settle my stomach now
notice everything is bye hand no large power tools
Is it possible that tower crane build at the center of building construction? if yes how to remove the tower crane when the building is done?
In Day 4, you will see that the tower crane sections inside of the building are simply pulled vertically out of the building.
It is also possible to design the body to be part of the construction and leave the post inside the construction.
What are the tittle of these songs of the video?
How to get this musics pls