  • Integrated trial runs for #Metro3 has been commenced. Various systems like rolling stock (coach), signal telecommunications, tracks traction etc., are being validated during the trial runs which is being carried out between #BKC to #Aarey
    After completion of trials and certifications of individual systems and certificate from Independent Safety Accessor (ISA), the system shall be offered for inspection of Commissioner of Metro Railway Safety (CMRS). Upon receiving CMRS sanction, the section will be opened for passenger services.
    #IntegratedTrialRuns #Metro3 #MumbaiUnderground #ConnectingTheUnconnected

КОМЕНТАРІ • 142

  • @srmtravel
    @srmtravel 2 місяці тому +8

    This route is going to be the game changer route. Hats off to all the people behind this project. 👏

  • @Sun56736
    @Sun56736 3 місяці тому +14

    Goosebumps on ! , much awaited project . Sometimes feel why we as a generation waited so much to see/use these important projects. Heartily Thanks to Good Governance, MMRC & all key players 🙏

  • @sekharmadhavdas1359
    @sekharmadhavdas1359 3 місяці тому +51

    Please jaldi start Karo, aamchi Mumbai needs it.

    • @neo3823
      @neo3823 3 місяці тому +18

      Thank Shiva sena for blocking the car shed

    • @daviddiveroli9331
      @daviddiveroli9331 3 місяці тому +1

      ​@@neo3823Thanks them for trying to save the environment

    • @neo3823
      @neo3823 3 місяці тому +2

      @@daviddiveroli9331 just excuses, if they want why haven’t they built enough STP ?

  • @ROSHANSINGH-ii4jh
    @ROSHANSINGH-ii4jh 3 місяці тому +22

    Its will give big relief for Mumbai peoples 👏👏👏

  • @kunalsawant3951
    @kunalsawant3951 2 місяці тому +5

    Mumbaikars are waiting for this project since forever!

  • @sagarkb3149
    @sagarkb3149 3 місяці тому +5

    Superb hum indians ind ki growth dekhke khush hai🙏

  • @livelong1388
    @livelong1388 3 місяці тому +6

    In bkc some community members of auto driver were protesting that sinde government is too fast too develop metro and their loot for passengers will stop due to metro

  • @navneetkalia
    @navneetkalia 3 місяці тому +5

    Mind blowing video !! Love it..!! Can't wait to ride on this....track !!

  • @RNDixit-me5uj
    @RNDixit-me5uj 3 місяці тому +104

    Really disappointed to see such slow progress 😢😢

    • @mrinal1129
      @mrinal1129 3 місяці тому +9

      Busy in election....nothing can be done in India..

    • @Bhartiya_Railworld
      @Bhartiya_Railworld 3 місяці тому +65

      All thanks to Ex. CM Uddhav saheb thakarey

    • @sunilkurhade7955
      @sunilkurhade7955 3 місяці тому +38

      ​@@Bhartiya_Railworld Jisne protest karwaye so called librandus ke saath aur Bollywood actors ko kaam pe bhi lagaya protest karne ke liye aur credit lene aa gaye kaam koi aur kare credit koi aur le waah incompetency ki bhi koi had hoti hai

    • @chungusmaximus
      @chungusmaximus 3 місяці тому +33

      @@sunilkurhade7955 bhai he is making fun of chuddhav thackrey, we all know what he did. it takes time for infra , india isn't a excellent country in terms of infra compared to to china or west , but soon we will have technologies if we prioritize the core engineering fields.

    • @Bhartiya_Railworld
      @Bhartiya_Railworld 3 місяці тому +9

      @@sunilkurhade7955 jo area jungle hi nahi hai, protest hua aur Film City jese area occupied area mein bante hai woh chalta hai ?

  • @akk424
    @akk424 3 місяці тому +72

    THANKS CONGRESS AND THACKREY FOR DELAYING LAND ACQUISITION

    • @zanjeer7827
      @zanjeer7827 3 місяці тому +23

      And the biggest irony was that the bollywood kids were protesting against the depot because of environment. And after a few months some of them bought Ferrari and Lamborghini. So much for the environment.

    • @sagarkb3149
      @sagarkb3149 3 місяці тому +2

      Bollywood???

    • @s.lshivde1319
      @s.lshivde1319 3 місяці тому +3

      Projects should not be delayed by any one for one and other reasons. Central government should have power to by pass all hindrances created by opposition.

    • @tukaidas1272
      @tukaidas1272 2 місяці тому +1

      Shradhaa kappor braught red laborghini

    • @indian_coaster_enthusiast
      @indian_coaster_enthusiast 2 місяці тому +3

      And thank you to bjp and especially bmc for maintaining the snail's place.

  • @yashwardhansable5187
    @yashwardhansable5187 3 місяці тому +14

    Hope it opens soon

  • @sagarkb3149
    @sagarkb3149 3 місяці тому +7

    This metro is biggest game changer for mumbai bit due to shivsena Bollywood so called leftist jinko vajah se protest huye uski vajah se 15000 crore ka loss ho gaya public ka uska kya??? Why courtvis silent on this ?? Ye politics nahi hum taxpayer ki request hai kyu politician ind ke malik hai aise rahte hai shame 😡

  • @santoshtavargeri
    @santoshtavargeri 3 місяці тому +69

    Pappu urf Aditya Thackeray had suspended this project

  • @abhay1138
    @abhay1138 3 місяці тому +12

    Most Beautiful video ever seen for an infrastructure project

  • @naturalgamerplaynaturaly
    @naturalgamerplaynaturaly 3 місяці тому +4

    This city deserved this type of infrastructure minimum 50 years ago, not bad getting now, people please don't sell your votes for freebies and secularism. Think and vote, request for every one is please vote for any one

  • @manishjoshi7342
    @manishjoshi7342 3 місяці тому +15

    Shame on mva government for delaying this project...

  • @Sag10293
    @Sag10293 2 місяці тому +5

    Once this metro comes, the BKC mulla rickshaw drivers will become helpless. They will surely lose 50% of their customers to metro. Much needed.

  • @audiovisualexcellence
    @audiovisualexcellence 3 місяці тому +62

    Project delayed because chiutyas like old shav sena held the project hostage. Thank God for eknath and BJP, this is becoming a reality soon.

    • @ChiSa123
      @ChiSa123 3 місяці тому +3

      *Uddhav Sena/MVA

  • @atuld6820
    @atuld6820 3 місяці тому +15

    BJP hai to mumkin hai ❤

  • @sagarkb3149
    @sagarkb3149 3 місяці тому +7

    Aukatless Bollywood ko is metro ke aas pas bhi nahi rakhna chahiye protest kar rahe the to ab kya hua??? Paise nahi mile kya???

  • @vilaspatil9694
    @vilaspatil9694 3 місяці тому +4

    Wait & watch slow but steady.

  • @drashokkumar9209
    @drashokkumar9209 3 місяці тому +3

    Please make sure stations look Grand in appearance . Lots of finishing work to be done . But we should have stations with individual personalities . Each station should look different , grand and beautiful .

  • @natasha8058
    @natasha8058 2 місяці тому +1

    Metro in Navi Mumbai near cidco was build within 2 years 11 stations and this metro still under construction

    • @8876abhinav
      @8876abhinav 15 днів тому

      Navi Mumbai Metro was built in 11 years and it is an above ground metro. Constructing underground in a densely populated and unplanned city like Mumbai is much more difficult

  • @ObleshReddy
    @ObleshReddy 3 місяці тому +4

    I’m sure they will open this phase before this election & next phase before Maharashtra assembly election

    • @ChiSa123
      @ChiSa123 3 місяці тому

      Phase 1 is opening in May. So not for general election. But maube for Maharashtra assembly election.

  • @anandkumarsaraf859
    @anandkumarsaraf859 3 місяці тому +17

    Nice kab chalu hogi

    • @adivlogs141
      @adivlogs141 3 місяці тому +1

      Soon!

    • @ChiSa123
      @ChiSa123 3 місяці тому +2

      Phase 1 to open in May I think! Phase 2 before end of year.

    • @mighty3224
      @mighty3224 3 місяці тому

      Phase 2 may be next year end not this.. and also phase is delayed ​@@ChiSa123

    • @sagarkb3149
      @sagarkb3149 3 місяці тому

      Is year open hogi

  • @tapaskumarpatra8667
    @tapaskumarpatra8667 3 місяці тому +4

    😢😢 please make it faster 😭😭

  • @adityarao7255
    @adityarao7255 3 місяці тому +15

    they have built agra metro in a record time of 23 months which was inaugrated on 6th March 2024. its high time MMRDA expedites and starts metro line 3 soon.

    • @Vivek-hf7mx
      @Vivek-hf7mx 3 місяці тому +15

      Only 4 stations in agra metro

    • @arjunkadam1114
      @arjunkadam1114 3 місяці тому

      Is Janam Mai to nahi hoga😂😂😂😂😂 opening

    • @ChiSa123
      @ChiSa123 3 місяці тому +2

      ​@@arjunkadam1114phase 1 is opening in May

    • @ChiSa123
      @ChiSa123 3 місяці тому +10

      Mumbai's rock is extremely hard. The areas available above ground and their entry points are difficult. Please, don't compare the 2 places! Also, Agra only has a few stations below ground. Except for the train depot, all of the Aqua Line/Line 3 is built underground... underneath an island made from reclaimed land between 7 islands... Mumbai!
      Also, many things were delayed because of Uddhav Sena/MVA government. Agra is a different rock type, less congested than Mumbai, and has had a stable Yogi Adityanath government. MVA harassed the MMRC municipal commissioner Ashwini Bhide repeatedly and tried to transfer her just because of Aarey.

    • @fatsc6h6
      @fatsc6h6 3 місяці тому +5

      Agra metro is over ground ,this is through rock .UP ke ho ? 😅

  • @sahilmore921
    @sahilmore921 3 місяці тому +8

    Finishing ajun baki aahe

    • @sagarkb3149
      @sagarkb3149 3 місяці тому +1

      But delay ka 15000 crore extra ka lagle???

  • @rayanndsilva3372
    @rayanndsilva3372 3 місяці тому +9

    Why has it pushed to september ? Thts nit done at all. Come on Guys

    • @bhupenvagal757
      @bhupenvagal757 3 місяці тому +3

      This is going to be inaugurated in two phases one from sarey to BKC second one from BKC to coloba. Looking at the progress of the project first phase will start in 2 or 3 months.

    • @ChiSa123
      @ChiSa123 3 місяці тому

      First phase will open in May I think. Second phase is in September. 🤔

  • @booksquotes948
    @booksquotes948 3 місяці тому +2

    Mumbai - pune - nashik rrts when

  • @mighty3224
    @mighty3224 3 місяці тому +2

    Abhi bohat kaam bacha hai.. station renovation and all.. it will again take arounf 3-4 mo ths i guess

    • @binshumeshsachan2051
      @binshumeshsachan2051 3 місяці тому

      Opening in april from BKC to aarey. Then in September from BKC to cuff parade.

  • @sferns99
    @sferns99 3 місяці тому +2

    Sorry guys Looking at BKC station still lots need to be done.Dont understand why the projects in India take countless years to finish.

  • @studentin30sbeyond6
    @studentin30sbeyond6 3 місяці тому +1

    Only showing those sections where work is done, take a look at the BKC stations, they are still doing digging for foundations, very slow pace of work, zero accountability to deadlines

  • @inkedia
    @inkedia 3 місяці тому +1

    Mumbai Rains should Not Stop Metro - Fingers Crossed !

  • @indian_coaster_enthusiast
    @indian_coaster_enthusiast 2 місяці тому +1

    8 years to build a 46 km line...
    Bmc and its 28000 crore at work, everyone!

    • @saralakulkarni
      @saralakulkarni Місяць тому +3

      Uddhav thackeray delayed land acquisition process.

    • @parthkatkhede7772
      @parthkatkhede7772 28 днів тому +2

      Say thanks to land acquisition delay by Thackeray

  • @deshmukhdp
    @deshmukhdp 3 місяці тому +2

    why only one track ? it should be two track for either of the direction

    • @8876abhinav
      @8876abhinav 15 днів тому +1

      It is two tracks. There is a second tunnel running on the opposite side

    • @aaryankumar8770
      @aaryankumar8770 День тому

      Bhai in underground section both tracks have different tunnels because that's according to the standard tunnel machine size
      And that sized tunnel is far easier to build and maintain compared to twin track tunnel

  • @admirable2971
    @admirable2971 2 місяці тому

    Only western lines developing
    Central liners also need s facilities tax tho central wale bhi dete hai

  • @Braintech35374
    @Braintech35374 2 місяці тому

    Mumbai le loka zopaa kadhatata. Tynaa choklet waar choklet detata project complete vahyache 😂

  • @devangshah123
    @devangshah123 Місяць тому

    september se phele chalu nahi hoga.

  • @suprashank
    @suprashank 2 місяці тому +1

    I thought this route was going to be operational by now 😢

    • @indian_coaster_enthusiast
      @indian_coaster_enthusiast 2 місяці тому +1

      Nah man.
      For bmc, even 8 years is not enough to open one metro line.
      Slow and steady wins the race.
      Bmc is slow.

  • @vilasgije5484
    @vilasgije5484 3 місяці тому +8

    Thanks to Ex CM Usman Saheb project got delayed.

  • @subhramchaudhary4992
    @subhramchaudhary4992 3 місяці тому +6

    Delhi-NCR is way ahead of Mumbai when it comes to infrastructure.

    • @canutedsouza9238
      @canutedsouza9238 3 місяці тому +8

      There's no uddhav Thackeray in Delhi NCR.

    • @Bhartiya_Railworld
      @Bhartiya_Railworld 3 місяці тому +1

      @@canutedsouza9238 because DMRC ek independent entity hai toh unko koi rok sakta

    • @Bhartiya_Railworld
      @Bhartiya_Railworld 3 місяці тому

      DMRC Delhi Metro System chalti hai

    • @manikantansubramanian1800
      @manikantansubramanian1800 3 місяці тому

      @@canutedsouza9238 UDHAR BHI AAP AUR CENTRAL GOVT KE BEECH EGO CONFLICT. ONLY 3 OUT OF 6 CORRIDORS IN PHASE IV APPOVED. ONLY LAST WEEK OR SO, TWO MORE CORRIDORS APPROVED. ONE MORE STILL PENDING. ONLY WHEN DOUBLE ENGINE SARKAAR HOTI HAI THAB EVERYTHING GETS DONE FAST.

    • @indian_coaster_enthusiast
      @indian_coaster_enthusiast 2 місяці тому

      They don't have bmc na...
      Only the bmc could eat ₹2,80,00,00,00,000 without showing any progress!

  • @asrarbw
    @asrarbw 3 місяці тому +2

    People with epilepsy should avoid this video

    • @ChiSa123
      @ChiSa123 3 місяці тому +2

      Yes, even those without epilepsy. I had to turn on the room lights to watch this video! 😅

  • @parthar101
    @parthar101 3 місяці тому +3

    Is BKC Metro station connected toBKC bullet train station ?

    • @ChiSa123
      @ChiSa123 3 місяці тому +1

      It should be! 🤔

    • @gauravpatil2074
      @gauravpatil2074 3 місяці тому +7

      Yes. As per my knowledge, they made provision to integrate it upcoming bullet train station

    • @8876abhinav
      @8876abhinav 3 місяці тому

      No they are not. They are over a kilometre apart. Bkc metro station on this line is near RBI. The bullet train station is near mmrda grounds. But this line connects with line 2b (Dn nagar mandale) so you can exchange there and in 1 stop reach bullet train station

    • @Nikhil_XD
      @Nikhil_XD 2 місяці тому +1

      The distance between this Aqua line BKC station and bullet train BKC station is around 1 km but they are going to connect them with travelators.

    • @ChiSa123
      @ChiSa123 2 місяці тому +1

      @@Nikhil_XD Yes travelators are necessary. They are also used to connect multiple London Underground platforms.

  • @kiran4652
    @kiran4652 3 місяці тому +3

    Now you can stop complaining about shiv sena and their mindless protests against anything which is good for the people..
    Abhi bhi itna late kyu ho raha hain?

  • @shamimahmed1038
    @shamimahmed1038 Місяць тому +1

    May the 11th and still no fucking clue of when commercial operations are going to start

  • @sohamm00
    @sohamm00 3 місяці тому +5

    Disappointing to see that we could build State of the art Overground stations!
    I mean The design of Aarey Depot Station is more like an Industrial complex look at Sydney Metro Stations they r also build in the same Decade but they look Superb inside nd out they r getting trains from Same Manufacturer and same Unit which is in Sricity. What is the reason that we r just building Cement boxes and not World Class stations?
    Can MMRC reply?

    • @raghavtoshniwal739
      @raghavtoshniwal739 3 місяці тому +6

      cost buddy , we still cant afford butification and asthetics since we are still matching are basic needs where as australia is a developed nation , yeah but i agree that atleast BKC staion could have been much more exciting but it is what it is lets enjoy that metro is coming

    • @shamikbera9617
      @shamikbera9617 3 місяці тому +7

      Atleast our stations won’t have snakes and spiders creeping up to passengers 😂😂😂.
      Jk

    • @ChiSa123
      @ChiSa123 3 місяці тому +3

      Dude, do you know how to use punctuation? 😂
      Took me three tries to understand what the flying fk your even trying to say!

    • @sagarkb3149
      @sagarkb3149 3 місяці тому +1

      ​@raghavtoshniwall739 lol ind koi poor country nahi hai paisa sahi use jare to best country ho skti hai ye🙏

    • @raghavtoshniwal739
      @raghavtoshniwal739 3 місяці тому

      @@sagarkb3149 india as a country poor nahi he but on individual level 2400 dollars he per capita jo ki poor category me aati he , tu khud hi bolra ki paise sahi jaga lagay jay toh best country ho sakti he , bilkull ho sakti he but paisa sahi jagah lagega tah na me toh abhi ki baat kar raha hu aaj ki baat kar

  • @pramodrewale3499
    @pramodrewale3499 Місяць тому

    feel sad for Mumbai that this international city is getting pathetic metro station designs 😞

  • @niravjoshi9565
    @niravjoshi9565 2 місяці тому +2

    Just 1 track in metro?? How will it be sufficient?

    • @Nikhil_XD
      @Nikhil_XD 2 місяці тому +2

      🤦‍♂️ there are two tunnels for up and down movement.

  • @XenithForPm
    @XenithForPm 3 місяці тому +25

    Remember before voting ,congres and uddhav sena stopped this from reaching the people of mumbai😢😢

    • @fatsc6h6
      @fatsc6h6 3 місяці тому +1

      Modi destroyed the trees , Uudhav dug the tunnels .Bullet train has not come up in Gujarat for ten years ! Ten years ! Typical bad Gujju mismanagement .

    • @drashokkumar9209
      @drashokkumar9209 3 місяці тому

      Utter Nonsense you are talking about . ​@fatsc6h6

    • @sagarkb3149
      @sagarkb3149 3 місяці тому

      ​@@fatsc6h6lol

  • @Ghostfreak_NB
    @Ghostfreak_NB 3 місяці тому +1

    Very slow progress

  • @Ajay-fl7bl
    @Ajay-fl7bl Місяць тому +1

    the biggest reason i love bjp.

  • @ayushgarg7033
    @ayushgarg7033 3 місяці тому +4

    Devendra Fadnavis ko credit jaega iska lekin BJP ne usko kutte jesa bna diya h.. ek to dhang ka banda tha unke paas CM layak

  • @rohangracias1866
    @rohangracias1866 2 місяці тому +2

    Hope we won't find Beggars on these

  • @user-my4wq5sc7i
    @user-my4wq5sc7i 2 місяці тому +3

    most boring metro till date

  • @tukaidas1272
    @tukaidas1272 3 місяці тому +9

    No vote to khangress and uddavuddin

  • @tukaidas1272
    @tukaidas1272 2 місяці тому +1

    What a shame 🙄🙄🙄
    shanghai metro 831 km
    Beijjing metro 836 km

    • @saurabhagarwal1283
      @saurabhagarwal1283 2 місяці тому +3

      We have local train too 390 km area of mumbai 603.4 km² where as shangai and bejing are 6,340 km² and 16,410 km² respectively mumbai metro line 46 +390 =436 km shut up bro if u dk then get out here.

  • @tukaidas1272
    @tukaidas1272 2 місяці тому +1

    Mumbai metro is shame 46 km only lol
    Such tiny metro in world metro list
    105 rank 😂😂😂😂