Five units of HRB-1000 used simultaneously

Поділитися
Вставка
  • Опубліковано 20 гру 2023
  • Excavation of rock to create double train track, while the original train track is still in use, right between a refinery and some oil storage tanks. Wire cutting is done in the bottom and side and 5 units are used simultaneously to split full depth in one go. The splitters are moved with a single excavator and powered by a single power pack. The splitters are not controlled individually, instead, the hydraulic flow is going to the splitter with the least resistance.