Five units of HRB-1000 used simultaneously
Вставка
- Опубліковано 20 гру 2023
- Excavation of rock to create double train track, while the original train track is still in use, right between a refinery and some oil storage tanks. Wire cutting is done in the bottom and side and 5 units are used simultaneously to split full depth in one go. The splitters are moved with a single excavator and powered by a single power pack. The splitters are not controlled individually, instead, the hydraulic flow is going to the splitter with the least resistance.
- Наука та технологія
We need a dealer in México.
Please contact us at info@yamamotorocksplitter.com for dealer contact details