Important points you always remember at site | Civil engineers interview question
Вставка
- Опубліковано 29 вер 2024
- civil Engineers interview Questions....This video is important to all fresh civil engineers because without proper knowing these points any error may could happened at site....
Part 1:- • Trick to remember Impo...
Related article:- www.civilclick....
...............................................................................................................
To keep in contact follow me......
Articles Website:- www.civilclick....
Facebook:- / civilforeyou
Instagram:- / moid_11
Google+ :- plus.google.co...
=====================================================
==Column Construction Drawing plan reading | How to read structural drawing in Urdu/Hindi Part - 4 video...
• Real Column Constructi...
==How to study Structural drawings Notes in Urdu/Hindi Part -3 video...
• How to study Structura...
======================================================
Subscribe the channel click the RED button
=====================================================
BS-Civil technology tutorials...B-Tech Civil tutorials. DAE Civil tutorials...Quantity surveying tutorials.....civil designing tutorials.... all available on this platform....
Thanks For supporting or start learning with us!!
Please modify the point 8.... one mason can cover (2.5 to 3) meter cube volume....
how many part of civil engineering interview
Ye to namunkin h 1mession jyada se jyada 4to5cum brickwork ke Sakta h
You are providing wrong information, for 230mm thick - One Mason fix only 600 to 650 Bricks in a day of 8 hours duty in substructure works, and 500 to 550 bricks for superstructure works & the same for half brick works.
Are you Pakistani?
Goog
Bhai chair bar ki quantity , cutting length, K bare m ek video bnao
One Masson cover one day brick work is 2.5 - 3.0 cubic meter per day
No, according to DAR Vol. I , to 686 Bricks in B/W foundation works, 627 Bricks in half brick works, so we can 650 Brick on an average in substructure, but in case of super structure it 525 Brick in a day by a mason in 8 hours duty
30m3 cube
500×30 = 15000 brick
Mason one day 1 to 1.5m3 or 500 to 600
please sir comment lene ke checker me galt mat batao
Point no-8. Sir aap kuchh bhi bologe or hum maan lenge, its impossible that a mason can cover 25-30 cu.m brick work in a day Impossible ha but 1 mahine mai 30cum zaroor kar skta hai,a mason can do brickwork 1.25 or hardly 1.6 cum in a day.
Please check out according to CPWD - DAR Vol. I , to 686 Bricks in B/W foundation works, 627 Bricks in half brick works, so we can 650 Brick on an average in substructure, but in case of super structure it 525 Brick in a day by a mason in 8 hours duty
Ohhhhhh bhai. I am also a civil engg.. nobdy can coverr 25. Cum brick work .
Bro do u knw that 25cum = 11250 nos. Of brick
Sooooooo it's impossible...
Sir 1 Mason 25 to 30 mtr cube 1 din me kaise kr sakta h...
Lapping sir agar m25 conectarte ho to
Namunkin h
How many bricks come in
25&30 cubic metre how can do one Mason
12500to75000bricks
Sir,water ratio 0.45 or 0.50 kha se aata h
Bhai please flooring ki ek video bnado... Types of flooring, mortar ratio used in flooring, technical terms of flooring, quantity of flooring, material used please ek video bnado bhai
one mason never do 25 to30cum of brick work for god sack do not spread wrong information.
Aslmoalikum bhai kasy hn ap?? Ap apna koi e.mail ya sell num ya f.b id bta skty hn plz
Boss 1 Mason 1 day 25-30 cum brick Masonry work nahi kar payega so please correct it
Bhai agr Hume ek pit h jisme water hai usme concreting krna h to konse grade ka concrete mix tayyar krna honga ?
Why parapet wall should not be exceed 1.2m why? Reason?
If we exceed its height it may fall on tha ground with the lateral forces
If brick work by a mason is 25 m cube den in sft it will be ??
882.18 sft
Water cement ration
For m20 =.0.45
0.45 ki unit liter hai na
Yes .. u can take kg or liter . Both r same for water
vaii ap please jel pen use kro to bohut Jada help hoga
Really gud method..❤
1mason 25 to 30 m3 how??
8 no is totally wrong...
Please don't give us wrong information..
On average a bricklayer or a mason lays about 500 bricks so the total volume of brickwork is 35(ft^3) = 0.972(m^3) as single brick is 0.0703125(ft^3) = 0.001944(m^3).
Brick size 9"*4.5"*3"
civil engineer k office work me kya kya work hota hain uspe video banaye
why we should provide Lapping Length ??
Plz make corrections in 8 no.
It should be 2.5-3 m3.
Please make a video for " types of construction work done by labourers and meson with in a day."
Like excavation work, plaster work, brick work, concrete work etc.
I hope you understand what I want to say..
MAke video on Foundation layout a
Jnab link deescription ma hy (bahi)
plz make vedios about how to read about drawing section
BLOCK Testing (सिमेंट +पाणी+स्यांड +खडी के मिक्चर का )
के बारेमे मालूमात करणी है /
1 Mason working qty as per your calculation 12500 bricks it's rong
Please share wastes percentage of material in every construction activity like plaster ,brick work,tile fixing ,rcc work,fabrication and erection work etc .please
Brother thanks for all your videos kindly share some tips regarding RCC and Stone masonry Retaining Walls Thanks in advance
Sir ji m b.tech civil engineering k final year m hu.
mujhe road construction and soil testing m interest h.
M job karna chahta hu.
Please guide me.
The way you explain things is outstanding.
Very nice video butMason ek din m 30 cum brick work cover karega to total 15000 brick ek din m lagaega is it right?
Good .nice
sr....per day k work ka record kaise prepaire kia jata h....plz plz ek video is pr...detail me....video lamba v hoga to koi problm nhi h.....fresher k lie bht kaam aaegi ye video....plz sr
work log book ya sheet kaise taiyar. krni hoti h...cvl engg ko...plz
Dear sir sorry
1 masion 25 se 30 m3 cube work kerta hai
Hai.. 9" wall how much area coverd by 1 mastri.. and also 4 " wall aslo
Sir about brick work a Mason how can fix 25 30 m3 per day.
Can you please make a video of sanitary pipes are laid from toilets to the drain.
Also what exactly happens in a sunken slab
Nice sir
electrical conduct pipe beam key centre sey pass kartey hai khy slab mai ?
sir purane 2 story building me bimb lAgane ka video banaye sir.bohot se logo ka queastion hai.per koyi nhi batata
scaffolding k upar bhi ek video banayein, meri aapse minnat hai.
love u bhai from india
For a concrete mix 1:3:6 and water cement ratio 0.6 both by weight, what is the quantity of water required per bag?
30 liter
sir 1 mason superstructure m 1 meter cube kam kr skta h per day kyoki 1 cum m about 500 bricks lgti h to mason itni hi bricks lga skta h
me ak fresher's hu isliye UA-cam par video dhundta hu lekin yeh likha dhikhai nhi de raha Hain achhi tarha se
U and your videos r great bro.. Seriously very nice. ....
acha aj basically aj may apko bataney jaraha hou...... sir g mjhe apk ye alfaz bht ache lgte hai
please sir make a video on all materials usesinabuilding matetials
apka point 8 samaj nhi aya
Mason ki productivity per day ke hisab se aapne galat bataya.
ap thora surveying ka b kuch guide karen plz.
Bhai water cement ratio to .35 se .70 k beech hona chahiye na? Fir M10 aur M15 me .3 kaise use hoga?
How different bar overlapping length
column ki drwng se coloum ka section kaise nikalte hai iski bhi video banao
Sir ek concrete mix design per achhi video banaye
one massion one day me kintna brick work kar paye ga
Sir one day a masson who many m3 brick work
Diploma walo K bare m banaye civil engineering
60D meri samajh m nhi aaya, Explain!
Sir 1 video footing ki steel kaise niklte hai
Layout video upload kiji sir
What is chair bar?
Char bars is used to support the bars and make the space between the bottom surface and bar
25 to 30 or 2.5 m3
Wonderful
Sir
level ground , beam,column ,footing,
column coordinates, lay out, slab drawing... in sab ki drawing kse read krte hai please btayiye sabhi bcho ko ye Janna chahte hongey...please
thank you
tolarance kya hota h slab beam column m
Sir plinth beam q liya jata h..
Sir 25 m^3 feet mai kitna huaa..
plz sir iska answer nikalkr bataiye
Point 8 no. Please lookout
very good questions
M 20 ka Matlab Kya he
M means mix and 20 is strength in Mpa
8 Nos.....Point is wrong
Sir concrete ka grade badega to W/R decrease hoga
Yes, you are right but depends on slump of concrete, concrete used in which works as Road, Column, Shear Wall, Raft, Footing.
u r the real teacher bhai
bhai
where are you from
Very beautiful tutorial. Thank you Bhai 👍👍👍
Jagabandhu Behera NM
grade of steel ???
Please daily progress shaet
Civil engineering knowledge
ua-cam.com/video/Zmu257_jhog/v-deo.html
Sir
Floor to floor height 3m h or laping 50d to column ka cutting length kitna hoga rectangle column me
4. 6 met
With footing
These is wrong
Very basic knowledg..kuch majedar nahi mila
Na krsoo g
Kya bro..smj ni aya
boht hi zyada beautifull video sie thanks sir rcc slab ka steel nikalna to ap ne seekha diya tha sir concrete nikalna btayen please
thankx...........
Behappy sir
Sir sand ke type ke hisab se use ka use bata sakte hai vidio
You can wtach video on my channel for brick work calculation & use of mortar
point to be noted vidio. thnqs
Theek hai
thick h
Tnx
Sir chair bar kya hota hai??
OK ji
👍
Theek h sir ji
Trss k bary ma video bano
Truss
Chair bar ka ek video jrury h
A
Please make a video about bar bending schedules and explain it fully