In case core test results are not satisfy the requirements then we go with load test for flexural members . Other than flexural members should be preferably investigated by analysis.
Rate Analysis - : Rate Analysis can be defined as the analytical study (qualitative and quantitative) that leads to the definition of a new unit rate referring to a given job or work type, by identifying its basic elements. How is a new unit rate defined? The starting point to define the new unit rate, is to run a careful analysis of the elements and resources that build up to form the new work item. The elementary components, or resources, are generally the following: • workforce • materials • hired equipment • overheads • company profits Labor The cost of labor is defined by the type of workers (specialized, qualified operators) and the hours of work necessary per quantity unit. Materials To define the cost of the necessary materials, you need to determine the following: the purchase price • on-site transport costs • unloading • stacking and storage • waste (an excess percentage of unwanted material due to the production processes) Rentals Meaning the rented equipment or machinery that may be of 2 main types: • “operated equipment”: this means that the rental cost is inclusive of both the equipment, or machinery, and the necessary operational labor (eg. a crane and the crane operator). The operated equipment rental includes the labor costs required for its use, the fuel, lubricants, insurance costs and maintenance. • “without operator”: in this case the equipment or machinery is rented with the operator. This kind of freight cost does not include the cost due to labor required for its use. Neither does it take into account the cost for fuel, lubricants or maintenance. Overheads Overheads are the costs incurred in an indirect way and not directly related to the works or to the construction site. On average they are quantifiable with a fixed percentage of between 13% and 17% - (may vary from zone to zone). Overhead costs include the following items: • Administrative and Management • site technical systems • surveys and audits rzp.io/l/Vy5ZxFep1
HLO,MY ITI DRAUGHTSMAN CIVIL TRADE COMPLETE KARA HU & AUTOCAD SOFTWARE SIKHA HU & ABHI SURVEYOR KI TRAINING LENA CHAHTA HU TOH DESIGNING FIELD MAY EXPECT LARU JAISE AUR SOFTWARE'S SIKHU YA SURVEYING SIKH KR CAREER KO AAGAY BADHAU KUCH SAMAJ NAHI AA RAHA PLEASE REPLY BADE BHAI DHANYAVAD 🙏🏼❤️
Initial setting time for OPC is Min 30 minutes And final setting time is max 600 minutes Apane kaha ki 600 se jyada final setting time hota hai.. Pls don't give wrong information to students.
সিভিল ইঞ্জিনিয়ার পড়ছি আমার জন্য দোয়া করবেন। আমি সারাবিশ্বে ফার্স্ট ক্লাস ফার্স্ট বিশ্বসেরা সিভিল ইঞ্জিনিয়ার ব্যারিস্টার হতে চাই ইনশাআল্লাহ। অনেক অনেক অনেক চিরস্থায়ী ভাবে আশির্বাদ করবেন ইনশাআল্লাহ
Calculating 16mm Steel rod weight per metre we used the formula D^2 L/162 and per foot D^2 L/162. We know that 16mm dia of Steel bar have 3 number of Steel in one bundle and length of one piece of rod is 12 m. 16mm steel bar weight:- 16mm steel bar supplied in U bent or straight rods, length of 16mm steel bar is 40 feet or 12meter and 16mm steel bar weight is 1.580 kgs/m, 0.480 kgs/foot, 18.96 kgs/piece and 56.889 kgs/bundle. 16mm rod length:- 16mm rod supplied in U bent or straight rods, length of 16mm rod are 40 feet or 12meter
HLO,MY ITI DRAUGHTSMAN CIVIL TRADE COMPLETE KARA HU & AUTOCAD SOFTWARE SIKHA HU & ABHI SURVEYOR KI TRAINING LENA CHAHTA HU TOH DESIGNING FIELD MAY EXPECT LARU JAISE AUR SOFTWARE'S SIKHU YA SURVEYING SIKH KR CAREER KO AAGAY BADHAU KUCH SAMAJ NAHI AA RAHA PLEASE REPLY BADE BHAI DHANYAVAD 🙏🏼❤️
Thanks sr ji
Its ok
Kya karti hai mam
Thank you so much sir for all videos ,no one share knowledge with us due to lack of knowledge I felt very low but you trained me with your great skill and give me confidence.
Best knowledge. Thank 🙂🤝 sir
18.96 kg
18.96 kg hoti hai
@@AnkitKumar-zx8od ok sir. Thank
ua-cam.com/video/PkN5tBIEQcA/v-deo.html
Shaander vedio .. Good information sir ...aap ase he vedios bnate rhe ...
Thanks... Please subscribe for more video like this
Thanks you sir
For giving good knowledge & experience
Thanks sir
Please upload new video in footing to slab casting in house construction steps Question/Answer.
😀😀😀😀😀
ua-cam.com/video/PkN5tBIEQcA/v-deo.html
Tqq so much sir
Thank you Sir Ji 🙏🙏🙏
Nidhi ji kya aap meri help kar sakti ho kya
Nice
Thanks for giving such knowledge I will note down these points to work on site
Yes
Job lgi?
Thanks sir 👍
Q.no.8 answer-(16^2/162)×12=1.5802×12=18.962 kg
ua-cam.com/video/4Cfqtcy0EGY/v-deo.html
@@anjconstruction02 u
@@simavloge1543 what is this
It's correct
Q 8 answer is 18.96
Nice teaching skills sir ji
neme k Engineer hai Hume se ache Labour hai aaj k Duniya m Jo Rooz 800 Kama leete hai.hum tu Baat soon kr bhi 15000 who bhi 1 month m Dil Uthe gaya hai.B.C Engineer name se
Ha bhai..kya kr sakte h yaar
Right yar
U r not working as engineer. U r working as a munshi.
Engineer Salary starts from 30,000/-
And he do not stand whole day on site.
Jab Tak Chale Raha hai Aallah ka Shukar Hai Company hai Jab Tak aap ki Zaroorat hai tab tak Bakki Din Ghar pr.
Bhai kaam ana chahiye kitni bhii salry le sakte ho
1- soil samples liye jayge (SBC)
2- Soil report aygi
3- drawing aygi
4- excavation hoga....
Sabase pahele estimate nikalenge
@@Engineeraddas432 no...first step Conception in the mind of owner .
Good knowledge sharing
Thanku sir 💝
ua-cam.com/video/PkN5tBIEQcA/v-deo.html
शानदार कॉन्सेप्ट्स गुरु
Q1. Plastering first and then flooring work will be done....
Right bro
Thanks sir
Question no. 8 answers is 18.96 kg
Thank u it is very much use full 🙏
Thanks you 🙏
Good morning ❤️
Gm
Very halpfull vedio for civil engineer .
Thank you for civil engineering interview questions
ua-cam.com/video/PkN5tBIEQcA/v-deo.html
Upka Bahut Galan answers hai
Thankyou so much sir,it helped alot really!!!!
Keep watching my videos
Excellent Boss
Nice work
Thanks
ua-cam.com/video/PkN5tBIEQcA/v-deo.html
I think in mix design it would be Cement:Coarse Aggregate:Fine Aggregate
ua-cam.com/video/PkN5tBIEQcA/v-deo.html
No cement sand agreegat
@@chetankante1484 are bhai wahi baat h unhone b shi bola h sand or aggregate ko coarse &fine aggregate bolte h knowledge le bhai acche se
Useful 👍👍
Bhai bas questions type video or banaye it's very interesting
Thanks
Nice video sir.
In case core test results are not satisfy the requirements then we go with load test for flexural members . Other than flexural members should be preferably investigated by analysis.
ua-cam.com/video/PkN5tBIEQcA/v-deo.html
Excellent video sir aise hi video upload kijiye
Sir lintel aur chajja beam aur slab se pahele cast kita jata aur first step clean ing of site hota hai
Sahi kaha bro
Tq so much sir for this vidio because this vidio very useful of civil engineering prectical vive 🙏
ua-cam.com/video/9SRTwI0Ec9E/v-deo.html
Thank u for this ❤️
ua-cam.com/video/PkN5tBIEQcA/v-deo.html
(16^2÷162) ×12= 1.580×12=18.96 kg
I like this video
Rate Analysis - :
Rate Analysis can be defined as the analytical study (qualitative and quantitative) that leads to the definition of a new unit rate referring to a given job or work type, by identifying its basic elements.
How is a new unit rate defined?
The starting point to define the new unit rate, is to run a careful analysis of the elements and resources that build up to form the new work item.
The elementary components, or resources, are generally the following:
• workforce
• materials
• hired equipment
• overheads
• company profits
Labor
The cost of labor is defined by the type of workers (specialized, qualified operators) and the hours of work necessary per quantity unit.
Materials
To define the cost of the necessary materials, you need to determine the following:
the purchase price
• on-site transport costs
• unloading
• stacking and storage
• waste (an excess percentage of unwanted material due to the production processes)
Rentals
Meaning the rented equipment or machinery that may be of 2 main types:
• “operated equipment”: this means that the rental cost is inclusive of both the equipment, or machinery, and the necessary operational labor (eg. a crane and the crane operator).
The operated equipment rental includes the labor costs required for its use, the fuel, lubricants, insurance costs and maintenance.
• “without operator”: in this case the equipment or machinery is rented with the operator. This kind of freight cost does not include the cost due to labor required for its use. Neither does it take into account the cost for fuel, lubricants or maintenance.
Overheads
Overheads are the costs incurred in an indirect way and not directly related to the works or to the construction site.
On average they are quantifiable with a fixed percentage of between 13% and 17% - (may vary from zone to zone).
Overhead costs include the following items:
• Administrative and Management
• site technical systems
• surveys and audits
rzp.io/l/Vy5ZxFep1
ua-cam.com/video/9SRTwI0Ec9E/v-deo.html
HLO,MY ITI DRAUGHTSMAN CIVIL TRADE COMPLETE KARA HU & AUTOCAD SOFTWARE SIKHA HU & ABHI SURVEYOR KI TRAINING LENA CHAHTA HU TOH DESIGNING FIELD MAY EXPECT LARU JAISE AUR SOFTWARE'S SIKHU YA SURVEYING SIKH KR CAREER KO AAGAY BADHAU
KUCH SAMAJ NAHI AA RAHA PLEASE REPLY BADE BHAI DHANYAVAD 🙏🏼❤️
tq
Thank's Sir 😍
18.96
Correct
Q.8 ans
(16^2÷162)×12=18.96kg
One length bar weight hai 12meter ki hoti hai
Aapne to 16mm ko meter me change hi nhi kiya hai
Good Information tqs
DPR- daily progress report.
Thnks sir
18.962kg (16mm dia steel with 12m)
8th answer 18.96
Thank you
Formula to calculate unit weight of steel is, D^2 L / 162
No !
For calculate unit weight of steel is (D^2/162) only
@@shubhamkishor3464 yeah "L" is replaced with unity.
Thank u so much sir from the all corner of the 🙏🙏
16mm 12m weight of steel 18.93
18.96
Thank you sir ..,
very knowledgeable👍
Initial setting time not less than 30 minutes final setting time not more than 600minutes i.e, 10 hrs
ua-cam.com/video/PkN5tBIEQcA/v-deo.html
Initial setting time for OPC is
Min 30 minutes
And final setting time is max 600 minutes
Apane kaha ki 600 se jyada final setting time hota hai..
Pls don't give wrong information to students.
Tum theory base per kisiko judj mat karo
Thank you sir
Thank u very much sir
Thanks... Please subscribe for more video like this
the weigth will be 18.96 kg
Thank u Sir 🙏🙏
No:8 Question ka Answer 18.96
Nict sir thanks🌹🌹🙏🙏🙏 guru ji
Q-8...
Ans- 18.96kg
সিভিল ইঞ্জিনিয়ার পড়ছি আমার জন্য দোয়া করবেন। আমি সারাবিশ্বে ফার্স্ট ক্লাস ফার্স্ট বিশ্বসেরা সিভিল ইঞ্জিনিয়ার ব্যারিস্টার হতে চাই ইনশাআল্লাহ। অনেক অনেক অনেক চিরস্থায়ী ভাবে আশির্বাদ করবেন ইনশাআল্লাহ
Thanks
(8) Questions for answer 18.96 kg
Calculating 16mm Steel rod weight per metre we used the formula D^2 L/162 and per foot D^2 L/162. We know that 16mm dia of Steel bar have 3 number of Steel in one bundle and length of one piece of rod is 12 m.
16mm steel bar weight:- 16mm steel bar supplied in U bent or straight rods, length of 16mm steel bar is 40 feet or 12meter and 16mm steel bar weight is 1.580 kgs/m, 0.480 kgs/foot, 18.96 kgs/piece and 56.889 kgs/bundle.
16mm rod length:- 16mm rod supplied in U bent or straight rods, length of 16mm rod are 40 feet or 12meter
Right
ua-cam.com/video/PkN5tBIEQcA/v-deo.html
Perfect!
@@Civiconcepts Sir kisi Manufacturing company m Experience waale students se kon se questions ask kiye jaate h interview ke time please tell me
You r totally extraordinary speaker .
👍👍👍
ua-cam.com/video/PkN5tBIEQcA/v-deo.html
Q.8- 18.96 Kg
Muje bhi sikha doge kiya esi calculations
Sir our aisi hi video bonao
(8) questions answere: 18.96kg
Right
@@Civiconcepts sir is time pe kahi job mil sakti hi Kya civil engineer
@@Civiconcepts pls reply sir
shukriya sir
3:58 that is not dumpy level,that is auto level
ua-cam.com/video/PkN5tBIEQcA/v-deo.html
HLO,MY ITI DRAUGHTSMAN CIVIL TRADE COMPLETE KARA HU & AUTOCAD SOFTWARE SIKHA HU & ABHI SURVEYOR KI TRAINING LENA CHAHTA HU TOH DESIGNING FIELD MAY EXPECT LARU JAISE AUR SOFTWARE'S SIKHU YA SURVEYING SIKH KR CAREER KO AAGAY BADHAU
KUCH SAMAJ NAHI AA RAHA PLEASE REPLY BADE BHAI DHANYAVAD 🙏🏼❤️
1.185
Pointing ke baad plastering hota hai joints ko thoda kured te hain fir plastering karte hain taki wall aur mortar me achha bond ho
Sir interview mai calculator allowed hai Kya?
Nhiiii
@@subhadrapanda7482 oooh
Nhi😄
@@civilengineer5325 ....ji
@@subhadrapanda7482 hyyy ji
Thnks 👍
play @ 1.5 speed
Good 👍👍👍👍👍
Thanks... Please subscribe for more video like this
Thanks... Please subscribe for more video like this
18.97 kg for 16mm dia 12m long steel baar
Ryt
No it's 18.962
Thank you Gurooji 😊
18.96 kg
I didn't get 7th one
Super
0:58 PCC not PPC
Yes
Nice bhai
18.96
Very very very nice videos
In Canadian gallon 4.54 litres pr gallon
😁ye kaha padh liya😂
@@Anandpandey01 😀😀 indian always have some extra information faltu ki 😀🥰
@@Stepfordreams sahi kaha bhai😂😂😂😂😂
question no 8. ka 18.962
Yes sir thank 🙂 answer correct h mera.
Thank u for information
18.962 kg sir👍
Correct
Sir is traha ka he short vedio banow bhot maza karta ha sir dakna ma
Kis kis ko question ke answers patha the?
क्क्क्क्क्क्क्क
18.8 kg
The Art of ur teaching is very intersting and humble
ua-cam.com/video/PkN5tBIEQcA/v-deo.html
Q.8
Ans: (16^2÷162)×12 = 18.96
Right
Good work sir g
8ka ans 18.96kg hoga n
Tq u so much sir 🙏
Subscribe
ua-cam.com/video/PkN5tBIEQcA/v-deo.html
18 kg?
18.96m
ua-cam.com/video/PkN5tBIEQcA/v-deo.html
Building construction steps
LayOut should be the No. 1 step ...you skipped it .