for many people it seems it take too much work to hit like, much more than making a great video, adding music and text. Thanks for sharing so awesome videos.
Wow very neatly explained, i just replaced 2 burnt 3pole contactor after switching the mccb the panel nor the meter coming online? There's no fuse holder and there's some thing like a cement resistor in-between A1 & A2 of contactor.any other steps to troubleshoot friend?
Thank you for your explanation, is this for 3-phase 220 or 3-phase 380? how I size the capacitor if I have 160 Amp CB. and another 100 Amp CB? Very thanks ( Note, where are A1,A2,A3 located?)
Last time we made one it has 50kvar capacitor bank with 100A fuses.It is obvious if you have 6 stages power factor 50kvar each you can't use 160A main breaker.But it's designer responsibility to size the wright breakers.
cool vid.at the end of next week but probably later i need to test a 2500A cabinet with 2 prebuilt modules in it.and now i know how they work.and i will we using the word power factor from now on.in dutch the correct term is cosine phi verbeteraar (cosine phi improver) witch it way to hard and long to say.and nobody knows wat u are talking about anyway.
sir aik APFC panel he usme 55 kvar ka power bank lga huwa he total but usme power factor -0.99 dikha rha he and capacitor on bhi nh ho rha he kya karu sir please help me sir
There is not a lot to explain.Current transformer measure demand for reactive power. If if the demand for reactive power increases pf relay start switching on individual stages.If there is no demand for reactive power the stages are being switched off.
for many people it seems it take too much work to hit like,
much more than making a great video, adding music and text.
Thanks for sharing so awesome videos.
Thanks. Great graphical explanation. Now i finally have some knowledge of how PF correction is implemented with wiring diagrams.
Laguna
Thank you sir for your kindness and generosity support,
My next post to watch on your UA-cam is 'How power factor correction works. Thank you.
Man Electrical Engineering is fun if you have this music playing in the background. I almost forgot I was wiring a panel!
Hi! Can we get 200 likes?
How did you calculate the size of the fuses ?
Thank for your great effort. I want to know that why in schemes contactor relays are also used that feed A1 of the capacitor contactor.
Good work really easy to understand thank you 😊😊😊
Excellent video
Wow very neatly explained, i just replaced 2 burnt 3pole contactor after switching the mccb the panel nor the meter coming online? There's no fuse holder and there's some thing like a cement resistor in-between A1 & A2 of contactor.any other steps to troubleshoot friend?
Hi bro i need the wiring diagram
@@williamngamakoua5040 i fixed it friend, the contactor coil was burnt due to transients. I replaced them with the new ones.
buenas tardes tendra informacion de un dcrk5 ya lei el manual pero no me compensa en automatico
What cap values do you need for a 3P 63A household? thanks
Sir es tune ka kya nam h pz btaye.
Very good
Nice video sir ji
Thank you for your explanation, is this for 3-phase 220 or 3-phase 380? how I size the capacitor if I have 160 Amp CB. and another 100 Amp CB? Very thanks ( Note, where are A1,A2,A3 located?)
Last time we made one it has 50kvar capacitor bank with 100A fuses.It is obvious if you have 6 stages power factor 50kvar each you can't use 160A main breaker.But it's designer responsibility to size the wright breakers.
A1 and A2 that's two ends of contactor coil.
Aferin güzel bir çalışma olmuş
Superb
cool vid.at the end of next week but probably later i need to test a 2500A cabinet with 2 prebuilt modules in it.and now i know how they work.and i will we using the word power factor from now on.in dutch the correct term is cosine phi verbeteraar (cosine phi improver) witch it way to hard and long to say.and nobody knows wat u are talking about anyway.
SoY_FooD I am glad you like it.
Sir practically wiring k connection btao kesy krty h
Are you CT connect in red phase that is complsary have ya any phase use it.
You can use the ct at any phase but you need to declare it on the relay/regulator.
Why don't you make a programing about beluk power factor relay
Good bro i need wiring diagram
Nice
Make a video about beluk apfc relay programing
អគុណបងThank
100 KW KA LOAD H TO KITNE KVAR LAGATE H OR C.T KONCI LAGATE H
Good job ,
sir aik APFC panel he usme 55 kvar ka power bank lga huwa he total but usme power factor -0.99 dikha rha he and capacitor on bhi nh ho rha he kya karu sir please help me sir
Song name?
Amazing👍good
berapa persen klw pake power beng keiritan y
sir pleas many capastet attach sulection use for powerfactpe
What about ogzlary؟؟؟؟
what is the level 3 password to access power export for the beluk controler.
Could you make it actual please
Cool!!
please explain the working
There is not a lot to explain.Current transformer measure demand for reactive power. If if the demand for reactive power increases pf relay start switching on individual stages.If there is no demand for reactive power the stages are being switched off.