[Day Time Testing!][SMRT] R151 (839/840) at Yishun

Поділитися
Вставка
  • Опубліковано 29 вер 2024
  • Recorded on 18/05/2024
    -Train Details
    R151 (839/840) (Batch 1)
    Build By: Changchun Alstom Railway Vehicles Co. Ltd.
    Year Build: 2022
    Year Entered Service: 2024
    Year Refurbished: N/A
    Traction Control: SiC-VVVF (Alstom MITrac TC 1500)
    TRN: 777
    Destination: Marina South Pier (Test Train)
    This could signify that R151 will debut on NSL very soon!
    If you have any enquire you can send me an email:
    singaporetrainschannel@gmail.com
    Follow me on Instagram:
    / singapore_trains_channel

КОМЕНТАРІ • 4

  • @ValidRail6188
    @ValidRail6188 4 місяці тому +2

    This is the “First” time you’ve caught an Alstom Movia R151 (839/840) in my “hometown” Yishun. Very lucky you, never get to see cause I go Swimming at Safra after My Mendaki.

  • @EonityLuna
    @EonityLuna 4 місяці тому +1

    They are just bullshitting again. A few days later it will probably disappear back onto the East-West Line.
    Trust me, even when the day comes when all 106 R151 trains are in service, none will be on the North-South Line. It will be all on the East-West Line, while the North-South Line will be the dumping ground for the C151As, C151Bs, and C151Cs.
    I have been burnt by them before. Fool me once, shame on you. Fool me twice, shame on me.

    • @SingaporeTrainsChannel
      @SingaporeTrainsChannel  4 місяці тому

      Fella debuted today
      ua-cam.com/video/cTbUKiZIlps/v-deo.htmlsi=UCHwOZWmjJNHVqyN