    In this video, you will learn how to use Phasing in Revit. Phasing can be very complicated and confusing as to what you should expect in each view based on the phasing. I would recommend keeping most of the values default as changing all the phasing can make things even worse for becoming familiar with it. This video covers all the phasing settings and what they do as well as an example of models in different phases while changing the phase filters of a view. Please ask questions in the comments if you have any as I want to make sure you understand how phasing works in Revit. My hope from you watching this comprehensive guide on phasing is that you will become a master of phasing in Revit.
    Check out my website for downloads:
    architecturevanguard.com
    Please leave comments and questions below and I will get back to you!
    If you found this video helpful, subscribe and check out the others:
    / @architecturevanguard
    And turn notifications on, 🔔Ring that Bell🔔
    Track: NIVIRO - Flashes [NCS Release] Music provided by NoCopyrightSounds.

КОМЕНТАРІ • 70

  • @twowongs8266
    @twowongs8266 Рік тому +5

    Great tutorial! Finally someone who takes the time to ACTUALLY show us where to find the Tab and what everything means. I have waded through so many presenters who apparently practice circular breathing and never shut up. The mouse cursor stays on the drawing only, at lightning speed as if somehow this would make us click like & subscribe, which we don't!
    I learned a lot today and I am happy and now subscribed 😀

  • @suzetteadams-rickards4791
    @suzetteadams-rickards4791 Рік тому +3

    Excellent tutorial, I will be able to reference it when I need a refresher but prior to this tutorial I was at a complete loss. Thank you for taking the time.

  • @AlbrechtJ
    @AlbrechtJ 4 роки тому +12

    The best explanation for the Phasing on Revit. I hunt for this for long time. Thanks for excellent learning course.

    • @ArchitectureVanguard
      @ArchitectureVanguard  4 роки тому

      Glad you found this helpful and thank you for subscribing! I really appreciate the kind words!

  • @emanyassin3959
    @emanyassin3959 2 роки тому +3

    The best explanation for the Phasing on Revit.Thank you!

  • @daneLemma-gq6ve
    @daneLemma-gq6ve 2 місяці тому +1

    I appreciate this video so much and it was very helpful.

  • @jackson77ish
    @jackson77ish 7 місяців тому

    Mate you are one of my top five Revit lecturers! Thank you!

  • @patriciamachucamellick9609
    @patriciamachucamellick9609 3 роки тому +3

    Great explanation! Finally I got some sense in the Revit phasing - THANK YOU!!!

  • @caitlinmorehouse3576
    @caitlinmorehouse3576 2 роки тому

    Shew - thank you Architecture Vanguard! I've been thrown into a Revit project with phasing, and was drowning! Now I feel like there is hope! Warm thank you from winter in Nova Scotia at 6am!!

    • @ArchitectureVanguard
      @ArchitectureVanguard  2 роки тому

      So happy to hear this, glad it was helpful! I'll do my best to send all the extra warmth from Texas up there. 😝

  • @ramyanemuri6219
    @ramyanemuri6219 2 роки тому +1

    thank you so much .. the most clear explanation i ve ever had

  • @cruzmakaveli9891
    @cruzmakaveli9891 4 місяці тому

    Thank you for the tutorial. Its been very informative and have finally got a handle on this phasing. Thank you for taking the time to do this. Very much appreciated. How do you allocate room tags to Phasing or do you just hide it, is there a "right" way of doing this ?

  • @viratmanchanda1645
    @viratmanchanda1645 Рік тому +2

    Brilliant tutorial!!!

  • @sahibagujral4669
    @sahibagujral4669 3 роки тому

    really really amazing video!! just cleared all my doubts!! better then any other revit expert!!

  • @visdomfreedom2798
    @visdomfreedom2798 Рік тому +1

    Thank you for your good explanation.

  • @Bloodymoonwolf88
    @Bloodymoonwolf88 3 роки тому

    I have learned a lot and in a very short time thanks for that.
    And I will expand the phases as I have several conversions in successive staggered time lines.

  • @dondiedanamoroto1761
    @dondiedanamoroto1761 3 роки тому +2

    Great tutorial bro. keep up the good work! Cheers

  • @Andylandia
    @Andylandia 9 місяців тому +1

    Thank you!!

  • @rahidmullas4575
    @rahidmullas4575 6 місяців тому

    Wow. great video. very useful.

  • @ismailhuzayim849
    @ismailhuzayim849 2 роки тому +1

    Many Thanks

  • @csmeyers74
    @csmeyers74 Рік тому +1

    Just subscribed. Great stuff! But please, turn up the mic!

  • @danielmitrofanov9877
    @danielmitrofanov9877 5 місяців тому

    Thank you! This is very practical and useful!
    Can you help me please to create the project with two phases of new construction?

  • @user-ig5el4si7g
    @user-ig5el4si7g Рік тому +1

    Great one! Keep going!

  • @yvonnechen3299
    @yvonnechen3299 2 роки тому +1

    Thanks!

  • @asiab2335
    @asiab2335 2 роки тому

    Thank you a lot, you've got it straight to the point:)!

  • @cathychoi6959
    @cathychoi6959 2 роки тому +1

    Thanks

  • @bitspacedesign4427
    @bitspacedesign4427 4 роки тому +2

    very informative thanks

  • @jeanettephan5494
    @jeanettephan5494 2 роки тому

    you're a legend. thank you

  • @mahmoudalaa2181
    @mahmoudalaa2181 2 роки тому +1

    so great

  • @bitspacedesign4427
    @bitspacedesign4427 4 роки тому +1

    pls make a complete project video in revit ...that would be great

    • @ArchitectureVanguard
      @ArchitectureVanguard  4 роки тому +1

      I will consider it, although most of the work I do is large projects. If I run across a small and personal project, I would definitely do that. Thank you for the suggestion!

  • @alitalebi5198
    @alitalebi5198 4 роки тому +2

    perfect

  • @moshecohen5089
    @moshecohen5089 5 місяців тому

    Great

  • @axdn
    @axdn 2 роки тому +1

    Hi, thanks for such a great channel.
    I am working on a historical renovation project where some elements such as doors and windows are going to be removed for cleaning and then reinstalled. Do I need an specific filter or new phase only for those specific elements? I really appreciate your help.
    Thanks

    • @ArchitectureVanguard
      @ArchitectureVanguard  2 роки тому

      Thanks so much for the kind words! Here's a general rule for phases and considering new ones: Is the work you are considering for a new phase going to be done at a different time or broken out specifically in the construction as separate in some way? If so, it should be a new phase, otherwise, a filter, temporary phase or something else. Hope that helps

    • @axdn
      @axdn 2 роки тому

      @@ArchitectureVanguard Thanks for your quick response. This is kind of tricky situation: Several existing elements are removed to be repaired and placed back as part of the conclusion of the project. I am confused on which phase they should go. Maybe create a new phase where elements are created in existing phase, and placed as temporary and then completed? any further clarification it will very appreciated,
      Thanks,

  • @miguelcarrillos
    @miguelcarrillos 3 роки тому

    Good explanation.
    Sometimes I want to show the existing “Room tag” when I’m showing “Previous + Demo” and those existing room tags disappear. That’s because I don’t want to show an existing floor plan (on the set of drawings). Can I change those existing rooms to demo phase, so they can be shown on my “Previous + Demo” phase??

    • @ArchitectureVanguard
      @ArchitectureVanguard  3 роки тому +1

      Through my experience, I have not typically shown rooms tags on demo floor plans. The problem with this is that rooms are created in the phase the vies are created in. You are likely not creating rooms in your demo plan views that have the previous phase set. You also probably do not have the previous phase set on those demo drawings so you can see the demo lines instead of existing lines. I hope all that makes sense.

  • @brianpoppe6546
    @brianpoppe6546 2 роки тому

    How do you phase areas, not rooms? i.e. a group of 3 rooms are existing offices. So on the existing area plan their areas are offices. In new work one office is now a conference room (assembly area). How does that get shown in the new area plan?

    • @ArchitectureVanguard
      @ArchitectureVanguard  2 роки тому

      Areas cannot be phased unfortunately. Rooms can be but they are based on the phase the view is in when you make the room.

  • @cast98ec
    @cast98ec 2 роки тому

    Is there a filter that can show existing, demo and new? Can one be created?

    • @ArchitectureVanguard
      @ArchitectureVanguard  2 роки тому

      The best filter to do that is "Show All" filter. I tend to avoid this only because you do see everything including the temporary construction.

  • @lesliefedde9407
    @lesliefedde9407 3 роки тому

    How does this phasing work in refleced ceiling plans? I have put in an ACT in areas of the plan based on existing conditions. Now when putting in the Demo ceilings the ACT does not show up with the red dashed print like a wall. I found that it is a pattern. But the pattern is only available for Draft mode and none of the patterns gives me a hidden linwork. Plus if putting in the draft pattern puts that pattern in all the ceilings that are demo not just the ACT patterns. The only work around I have found is putting in a pattern for demo on the ACT grid to be demolished and then match the coloring on the walls to the patterns. This works but it places the pattern on the existing plan as well. So You would not be able to print an existing plan in the set. Only a Demo and a New. If you have any alternate plan for Demolition of ceilings let me know. I would love to see a video on this. Thanks

    • @ArchitectureVanguard
      @ArchitectureVanguard  3 роки тому +1

      Any new model placed will default to New Construction. You might be able to change that in the phasing options. You might check the material on the ceiling or the view settings for ceilings you are drawing in. I would say as long as you have your models on the correct phase and each view with the correct phase settings as to what you want to see, then you are good. Make sure Show previous + New is on for basic new construction plans and you would have Previous + Demo for the demo plans. With modeled elements on the correct phase you would see what you need to. Also check phase filters as those would affect how you see phased elements globally.

  • @robertmaynard7837
    @robertmaynard7837 3 роки тому

    I was working backwards, I guess. I created the existing walls of the structure, and designated them as existing, then added new walls and named them as new construction. I have different copies of the same levels but they are labelled as either existing or new. But watching your video, each level should be labelled new construction? In the existing level 1, there are walls surrounding empty space (garage), but in new level 1, there new walls, floor, windows, and doors. In existing level 1, I want only the original existing walls, etc. to show. suggestion?

    • @ArchitectureVanguard
      @ArchitectureVanguard  3 роки тому

      Then I would think that for existing level 1 then you can view the original walls by having the phase be new construction and showing previous only as the filter.

  • @rutht1537
    @rutht1537 2 роки тому

    What happens when there is multiple phases - say 1, 1.5, 2 (these are phases the arch has & their model is linked into ours). We want to show phase 1 - do we get the arch's newer phases to not show?

    • @ArchitectureVanguard
      @ArchitectureVanguard  2 роки тому

      You can handle that through the visibility graphics per view or view template in the linked models. You could also match their phasing so that things show up by default more correctly.

    • @rutht1537
      @rutht1537 2 роки тому

      @@ArchitectureVanguard Thank you - we have matched their phasing & it's still showing all the newer phases that we don't want to see on the sheets yet.