JSA No:
JOB TITLE: Piling & Concreting Works for the construction of Foundations/Building
S.NO
JOB STEP
HAZARDS
CONSEQUENCES
CONTROL MEASURES
1
Mobilization of equipment & Materials
Involvement of unskilled personnel
Personal injury/Accident
Trained & skilled staff to be authorized for working
Ensure JSA briefing & Daily TBT to all workforce prior to commence activity
Unauthorised/ uninspected equipment/tools at site
Failure of equipments & tools.
Only inspected Equipments/Tools must be allowed at work site
Use right tools for right job
Slip, Trip & fall
Slip and trip can result musculoskeletal injuries & Fractures.
Take care of overhead structure/pipe racks
Keep access/walk ways always clear from any obstruction
Inclement weather condition
Workers can hit by Piling machine, equipment and get injured due to fog.
Stop work in case of any inclement weather conditions ( fog etc.)
Restrict movement of heavy vehicles/equipments in fog
2
Piling
Uncertified piling Machine & Operator,
Collapse of tripod,
Piling equipment/machine failure.
Workers can injure by tripod.
Pile machine & its operator should be certified
Stand the tripod properly, tripod to be fixed on ground properly.
Keep away all unauthorized people during movement of heavy vehicle/equipments
Be careful of nearby live areas
Ensure Close HSE monitoring /supervision
Improper barricade
Entry of unauthorised person.
Fall of person in Pile.
Barricade the working area properly
Sling broken, load drop
Fatal/injury due to load drop.
Ensure proper & inspected accessories being used for drilling
Ensure that drilling bit is properly fixed with locking pins
Keep away during drilling operation
working area should properly barricaded
Noise
Can cause deafness & psychological imbalance.
Provide Ear Plug
Slip, Trip & fall
Slip and trip can result musculoskeletal injuries & Fractures
Ensure proper stacking of all materials at site
Keep access/walk ways always clear from any obstruction
Ensure proper housekeeping of workplace all the time
Inclement weather condition
Workers can hit by Piling machine, equipment and get injured due to fog.
Stop work in case of any inclement weather conditions (Rain, storm, fog etc.)
Restrict movement of heavy vehicles/equipments in rain/fog
Fire & explosion
Loss of life & Burn due to fire.
Ensure availability of inspected fire extinguishers at site
3
Lowering of Steel Cage structure
Personnel hand injury while handling with steel
People under suspended load
Unbalancing of load
Personal injury.
Hit by suspended load which can result in injury.
Ensure Involvement of skilled labour
Ensure use of proper PPE’s
Area should be properly barricaded during lifting operations
Poor Housekeeping.
Poor housekeeping can create unhygienic work place which can leads to growth of insects.
Ensure proper stacking of all materials at work site
Maintain good housekeeping all the time
4
Concreting of Piling
Inappropriate PPE’s/Tools during concrete work
Slip of tools can injure workmen due to inappropriate ppe and tools.
Use of appropriate PPE’s during concrete
Ensure use of inspected tools for the right job
Availability of fresh water at site
First aid box should be in place at site
Skin contact with concrete or other chemicals
Skin contact with concrete can cause blisters, dead or hardened skin.
5
Working at night shift hours
Poor visibility at night hours
Tripping of workers due to Poor visibility
Ensure proper lighting.
Bahot Achha Video share in All HSE Professional Group and person! Easy steps👣
Wowww sir nice explanation
Nice
Simply explained love for you 👌👌👌👌👌
Good explanation
Great job bhiya👍
Thanks you so ao much
Wonderful information, sir .
Excellent Bhai
Thank you bhai
Is ground fault circuit interrupter using in construction site? In distribution box
Super 👍
👍👍👍👍
Very good information ❤️❤️
Good work
Thanks brother big admirer of you please send me formate for boom ladder risk Assessment thank you
The process is called boring or drilling not piling. The structure is called bored piles. Pile here means post or stake or "khamba" in hindi.
Sir, I watch all your videos and I love it. Safety Engineer I have done ITI and I want to. What may or may not happen to get admission in Safety Engineer ..
Thank you sir ❤️
You welcome
Bhai SSOW (safe system of work) pe video banao.
Hi bro send me some of hira and jsa of hot work tempalates
Sir bore machine training kaha aur kyse hota hai mujhe interest hai pls
Sir your HSE Notes App didn't work right now.. What's worng in the app if any technical issue to face plz solve this issue.. Your app is very knowledgeable and needed for HSE.
Sir ADIS ka sylebus mil jayega
Ya ADIS ke liye Kaun si book badiya hai
Sir aap abhi kaha pr job kr rhe hai
Otherwise risk assessment???
Sir where you made this format I mean in Excel or ms word in software you make this format
MS WORD, you can also use Excel
Sir HSE Note app not open
Ya there is some issue
Sir aapki salary kya hai
Format ka link nhi h sir ji
www.safetymgmtstudy.com/2022/06/Job-safety-analysis.html?m=1
Hello sir
Job hai aap pass
bentonit ek piling m kitna lgta h
Ye to quality Wala bataega
Aaj kal polymer ka jamana chal rha hai🤣🤣
Apka hse note kam nahi kar raha hai
Ya we are working on it
Sir ji JSA ka file PDF format m mile ga please
Download link is given in discription
@@SuperPowersPDF format
Nahi Mila sir PDF format
www.safetymgmtstudy.com/2022/06/Job-safety-analysis.html?m=1
Number do na bhai baat kar na hi
What is this? Is there any English-speaking engineer left in the world?