Would lifting the completeted Lattice structure "from the bottom" with multiple Basket Hitches between the Structure and the Spreader or Lifting Beam be preferred over other methods when lifting vertically in a horizontal position as picture? Is it normally preferred to hook up at the bottom rather than the top when possible?
Would lifting the completeted Lattice structure "from the bottom" with multiple Basket Hitches between the Structure and the Spreader or Lifting Beam be preferred over other methods when lifting vertically in a horizontal position as picture?
Is it normally preferred to hook up at the bottom rather than the top when possible?
Hi my dear how are you I'm United Arab Emirates living Abu Dhabi from Bangladesh
good
Very good crane