- 2
- 139 170
RaimondiItalianCrane
Приєднався 20 чер 2012
Raimondi gru MRT213 tower cranes.m4v
Raimondi Cranes has taken the challenge out of new building projects by including the following:
Turn Table Group: counter-Jib equipped with all the drives pre-assembled at the factory for faster erection and easy maintenance.
Maximum Safety: no protruding parts on Counter-Jib. Inclusion of hand rails on the walking platforms.
Tubular Structure of the Masts: for more stability and less wind resistance.
Tensile Bolts for Tower Connection: for higher stability of crane, easy dis-assembly and elimination of maintenance.
Frequency Variation Hoisting Winches: to guarantee smooth engine start ups and reaction time in line with manoeuvring to avoid structural overloads.
Lebus Type Drums: this is to reduce load oscillations and consequent structural vibrations. It also guarantees longer life of ropes against wear.
Turn Table Group: counter-Jib equipped with all the drives pre-assembled at the factory for faster erection and easy maintenance.
Maximum Safety: no protruding parts on Counter-Jib. Inclusion of hand rails on the walking platforms.
Tubular Structure of the Masts: for more stability and less wind resistance.
Tensile Bolts for Tower Connection: for higher stability of crane, easy dis-assembly and elimination of maintenance.
Frequency Variation Hoisting Winches: to guarantee smooth engine start ups and reaction time in line with manoeuvring to avoid structural overloads.
Lebus Type Drums: this is to reduce load oscillations and consequent structural vibrations. It also guarantees longer life of ropes against wear.
Переглядів: 96 427
Відео
Raimondi italian tower cranes.m4v
Переглядів 43 тис.12 років тому
Two crucial aspects need to be considered when weighing up options to purchase a crane: the maximum handling rates of the crane and its total intended duration of use, also referred to "service life". While great importance is placed to the maximum handling rates in the decision to purchase, too little focus is placed on an assessment of the crane's service life. When a component or an entire u...
Ottima gru e complimenti ai montatori per il lavoro svolto come si deve 👍👍👍
Hi my dear how are you I'm United Arab Emirates living Abu Dhabi from Bangladesh
Would lifting the completeted Lattice structure "from the bottom" with multiple Basket Hitches between the Structure and the Spreader or Lifting Beam be preferred over other methods when lifting vertically in a horizontal position as picture? Is it normally preferred to hook up at the bottom rather than the top when possible?
🏗👍
Why the cranked boom and not a uniform linear boom?
Raimondi is really nice equipment!
I wanna work on that site just the way I like it sorts, no hardhats,sandals.!!!
effettivamente come già notato belli gli elmetti
looks like a Jaso
giusto non rispettate le norme
no safety helmet
bien
good
Very good crane