As a genuine subscriber and being thankful for the knowledge you share a small suggestion - Compare this video with any other podcast/LLA video the Volume level is relatively very low, high volume attracts viewers these days. kindly improvise 😄
install a bigger system makes sense. replace gas geyser with electric geyser, replace a petrol scooter with ev scooter, replace a lpg cooktop with electric induction then saving goes up to 50k per year which will increase your recovery cost i am using this kind of setup from 3 yrs
Solar companies think that Govt increase the subsidy amount for their profit. 3kw solar before new subsidy cost upto 2 lakhs but from last month they increase the rate upto 2.5 lakh.
In delhi, calculation is very complex.. I have calculated.. From oct to march.. Comsumption is less than 200 unit result in zero bill.. Free electricity.. While from march to oct we have 1 Ac at home run for 16 hours every day.. We dnt have roof.. So we replace old ac with new inventor ac with 5 in 1 convertor ac of LG.. My annual bill reduce by 40 percent.. From 35 k annually to 21 k
Hi, thanks for promoting PM Surya Ghar Yojana. But please share the complete detail. If there is no grid supply the solar power do not work and do not give power to home. In night the solar panel do not generate any electricity, so all power will be consumed from grid, and there are other disadvantages too. You are doing good work in finance, so please inspect all the aspects of any products. G
२ kw ला १ लाख ६० हजार लागतात आणि ३ kw ला २ लाख १० हजार लागतात. Subsidy वजा जाता २ kw ला १ लाख आणि २ kw ला १ लाख ३० हजार खर्च येतो. २ kw मध्ये २०० units आणि ३ kw मध्ये ३०० units कमीतकमी मिळतात. सध्याच्या रेट ने २ kw ला १५०० आणि ३ kw ला ३००० saving मिळते.
Gov should build more solar power grids instead of unnecessary flyovers and bullet trains. Had they started this at least 5 years ago, just think about the possibilities that could have been realised today.
We are the most populous country in the world....day by day more Indians are being added to the mixture and every resource is getting strained.... So no.... Flyovers and trains are not unnecessary....infact the current trains and roads we do have are not sufficient.. But yes, solar energy needs to be further popularized as the more demand, the lower the cost for future users.
India has set a target of achieving 500 GW of installed capacity from non-fossil fuels, including around 270 GW of solar capacity, by 2030. In August, the centre said that the solar power generation capacity has now surpassed the 70 GW mark. And the implementation efforts are only going to ramp up in the coming years so we are well on track. Don't know what you are blabbering about.
Sir plz aap mujhe ye btaye... Jaise hamare yaha 3 kw ka ongrid solar system lagwaya h.. Hamari input unit 50 hoti and export unit 300 hoti h jisme 250 unit humne grid ko transfer kr di... Ab wo 250 unit ka payment hydill wale customer ko dete h ya nhi... Kyuki hamri 1 year ki complete grid ko di gyi average unit 3000 hogi... Agar costomer ko payment nhi mila to 3000 unit ka hydil department ko fyada hoga.. And costomer ko loss... Ab aap btaye ki hume payment recieve hoga ya nhi.... Agar koi purana bill ho to aap us bill k dwara detail se bta dijiye...
One thing she forgot to mention that solar panel is not guaranteed electricity. It don't give electricity in rainy season and winter season. So if rainy and winter season at your place is 8 months, then it will take forever to recover cost. Solar panel companies are reluctant to cover broken panels or burnt due to any reason - you need to pay whole 6-7K for that panel. So if rain is very heavy or windy solar panel is useless. The only electricity it make it winter can run a wifi and emergency bulbs.
Modern panels are strong enough to withstand normal weather conditions. Also maximum 30 to 45 days per year hi aise hotein hai jisme 0 solar radiation aata hai panels par woh bhi poorein india ki extreme geography ko lekar hai. So people living in india are in the best location for rooftop installations. Foreign People in extreme locations are installing solar power rooftops. See videos of jerryrigeverything livinng in canada and solar programs of european nations. Woh sab profit mein hai. India has far better environment and solar radiation than europe and canada combined.
Here is my doubt. Just in case the solar panel installed in my house generates 400units of electricity. And I consumed only 150units. So now additional 250 units was generated. However the electricity bill gets null, but what about the additional units? Will that be added as income to bank account?
Mam agar solar panel kaharab hoo jaye ya fir change karwana pade toh kya process rahegi. Aapne mann se karwa sakte hai yaa fir iski bhi koi gov procedure hai
We in Mumbai paying too much to adani electricity... But for us we donot have roof to put solar .... One house with 2 ac bill comes to 7000 per month .. for us it is very helpful but we donot have roof to put this... Kuch rasta ho toh batana
Good initiative by government however made useless by government employees. I had applied for connection last month. Until last week website was not working. Application was accepted once it started working but since than I am awaiting feasibility approval. I don't know whether I will get connection this time.
all this should be migrated to private players government should just provide subsidy. mere toh 1000 unit see jayda aate hai summers me so mereko jarror lagwana padega ye. problem hai pehle pura pay karke lagwana fir baad me subsidy denge. ak middle class banda kahan see jayega 1.5 lakh rupees.
Hi Mam Please a add a point that in after market the 2 KW solar panels will be cost around 1 lakh rupees. So there is the scam, you can not chose the saler from out side, only from the list.
Additionally, GoI has already launched a Power Sector Scheme i.e . RDSS under which around 25cr Smart Meters will be installed which is under process. In Smart Metering, provision for Net Metering has already been kept
Whenever I try to apply, no option shows in circle name Or division name, and then I can't proceed with the application because it's a required field. What can I do?
I am owning a flat which is in 2nd floor. Assuming i have got the society approval for solar panel installation in that case can I use this scheme? Eligible?
क्या बिजली बिल में फिक्स्ड डिमांड चार्जेस भी जीरो हो जाएगा। जैसे मान लो सोलर पैनल से महीने में घर की बिजली का काम चल गया , ग्रीड से इस्तेमाल नहीं हुआ तो क्या फिक्स्ड डिमांड चार्ज भी नही आयेगा बिल में लगकर?
Mam, you have explained in very good manner with facts, however as I work in the power sector so I just want to submit some additional changes regarding Applicability of Technical Feasibility Study for Distribution Company:- As per Electricity (Rights of Consumers) Rules, 2020 Ministry of Power has notified the following amendment dtd. 22.02.2024 in sub-rule 7 of Rule no. 11 (Consumer as prosumer) of Electricity (Rights of Consumers) Rules, 2020 Sub-rule 7A : The applications for roof top solar photo voltaic systems upto 10 kW capacity, complete in all respects shall be deemed to have been accepted without requiring technical feasibility study and any commensurate enhancement of the sanctioned load of the consumer, as may be required, shall be carried out by the distribution licensee All distribution companies with approval of their respective SERCs will incorporate the above amendment
बकवास है, इससे अच्छा मैं Loom solar या Zunsolor का लगवालू सस्ता, quality और under 1 लाख में हो जायेगा
As a genuine subscriber and being thankful for the knowledge you share a small suggestion - Compare this video with any other podcast/LLA video the Volume level is relatively very low, high volume attracts viewers these days. kindly improvise 😄
install a bigger system makes sense. replace gas geyser with electric geyser, replace a petrol scooter with ev scooter, replace a lpg cooktop with electric induction then saving goes up to 50k per year which will increase your recovery cost i am using this kind of setup from 3 yrs
How much kilowatt set up you have used bro?
@@pramodmohanty6192 3 kw it generates 12 units average per day
@@pramodmohanty6192 3 kw
Roti kase bante ho induction pe😂
@@Abhinavocitycoiled cook top
Thanks!
Welcome 😊🙌
Namaste!
Aapne bilkul asaan basha may poori jankari, Kam shadonmay bathaya hain.
Dhanyawad.
Thank you.
Welcome 😊🙌
50 ki chiz ko pehle 500 kardo fir usme 70% discount pr becho subsidy k naam pr 150 ka... Bolo Wahh modi ji wah
I’m your big fan. Information helps a lot. I watch and find most of your videos helpful
Thank you 😊🙌
@@bekifaayatimam scheme m to 75 percent subsidy mil rhi h 2 kw p to uska kitna pay karna hoga
@@bekifaayatinext best creator award winning ytber
@@bekifaayatiagar bijli ka connection na ho to kya nahi milegi
Solar companies think that Govt increase the subsidy amount for their profit.
3kw solar before new subsidy cost upto 2 lakhs but from last month they increase the rate upto 2.5 lakh.
Ayega to modi hi
😂
In delhi, calculation is very complex.. I have calculated.. From oct to march.. Comsumption is less than 200 unit result in zero bill.. Free electricity.. While from march to oct we have 1 Ac at home run for 16 hours every day.. We dnt have roof.. So we replace old ac with new inventor ac with 5 in 1 convertor ac of LG.. My annual bill reduce by 40 percent.. From 35 k annually to 21 k
Hi, thanks for promoting PM Surya Ghar Yojana. But please share the complete detail. If there is no grid supply the solar power do not work and do not give power to home. In night the solar panel do not generate any electricity, so all power will be consumed from grid, and there are other disadvantages too. You are doing good work in finance, so please inspect all the aspects of any products. G
Thank you Bekifaayati for being on our(citizen of India)'s side as always.
Koi sense nhi banta ab solar panel lagane ka
Thank you aapka video dekh ke clear ho gya
२ kw ला १ लाख ६० हजार लागतात आणि ३ kw ला २ लाख १० हजार लागतात.
Subsidy वजा जाता २ kw ला १ लाख आणि २ kw ला १ लाख ३० हजार खर्च येतो.
२ kw मध्ये २०० units आणि ३ kw मध्ये ३०० units कमीतकमी मिळतात.
सध्याच्या रेट ने २ kw ला १५०० आणि ३ kw ला ३००० saving मिळते.
Thanks for informing
Gov should build more solar power grids instead of unnecessary flyovers and bullet trains.
Had they started this at least 5 years ago, just think about the possibilities that could have been realised today.
Charge your brain with solar power .
@@nikhilPUD01perfectly said ❤
We are the most populous country in the world....day by day more Indians are being added to the mixture and every resource is getting strained....
So no.... Flyovers and trains are not unnecessary....infact the current trains and roads we do have are not sufficient..
But yes, solar energy needs to be further popularized as the more demand, the lower the cost for future users.
India has set a target of achieving 500 GW of installed capacity from non-fossil fuels, including around 270 GW of solar capacity, by 2030. In August, the centre said that the solar power generation capacity has now surpassed the 70 GW mark. And the implementation efforts are only going to ramp up in the coming years so we are well on track. Don't know what you are blabbering about.
Useful information
Sir plz aap mujhe ye btaye... Jaise hamare yaha 3 kw ka ongrid solar system lagwaya h.. Hamari input unit 50 hoti and export unit 300 hoti h jisme 250 unit humne grid ko transfer kr di... Ab wo 250 unit ka payment hydill wale customer ko dete h ya nhi... Kyuki hamri 1 year ki complete grid ko di gyi average unit 3000 hogi... Agar costomer ko payment nhi mila to 3000 unit ka hydil department ko fyada hoga.. And costomer ko loss... Ab aap btaye ki hume payment recieve hoga ya nhi.... Agar koi purana bill ho to aap us bill k dwara detail se bta dijiye...
state to state varry karta..50 unit ke liye 3kw solar kyu lagwaya🤣
@@Ramu-ds5bw unit export karne k liye
ua-cam.com/video/f_sRGdJ9yb8/v-deo.html
Ye vedio m h detail
u r osammm yaar
Useless solar panel as per financial data but for saving environment good❤😂😂
Nice yojna🙏 1:38
One thing she forgot to mention that solar panel is not guaranteed electricity. It don't give electricity in rainy season and winter season. So if rainy and winter season at your place is 8 months, then it will take forever to recover cost. Solar panel companies are reluctant to cover broken panels or burnt due to any reason - you need to pay whole 6-7K for that panel. So if rain is very heavy or windy solar panel is useless. The only electricity it make it winter can run a wifi and emergency bulbs.
Modern panels are strong enough to withstand normal weather conditions.
Also maximum 30 to 45 days per year hi aise hotein hai jisme 0 solar radiation aata hai panels par woh bhi poorein india ki extreme geography ko lekar hai.
So people living in india are in the best location for rooftop installations.
Foreign People in extreme locations are installing solar power rooftops. See videos of jerryrigeverything livinng in canada and solar programs of european nations.
Woh sab profit mein hai.
India has far better environment and solar radiation than europe and canada combined.
PM surya ghar muft bijli yojana kab tak chalegi ? 1 crore registration ke baad kya hoga ?
still working portal still working
Ky on grid , off grid, or hybrid solar system ma bhi subsidy milte han because in rural area light 2-3 din tak Kati rahti han..
Off grid
Is solar panels are installed by gov. or we have to buy it
Easy presentation.. good video 👍🏻
Thank you 😊🙏
Property proof jaruri hai kya
2 kw k liye kitna lgega total
How do we install in small flats where we don’t have the personal access to rooftops and apartment doesn’t have solar in its agenda?
Mam humko 450 monthly bill aata h to kitna kharxha lagega aur kitna subsidy bad me milega
Agar mera hybrid system hai then am i eligible?
Wonderful ✌👍
Thank you 😊🙏
Very nice
Thank you 😊🙌
Very useful information
Thank you 😊🙌
Here is my doubt.
Just in case the solar panel installed in my house generates 400units of electricity. And I consumed only 150units.
So now additional 250 units was generated. However the electricity bill gets null, but what about the additional units? Will that be added as income to bank account?
What if consumption is greater than 350 units.. and have balance 350 units
Mai bs is cutie ke liye video dekta hu😅
Great job 👍
Thank you 😊🙏
Battery kitne saal me change hoga and uska cost kya hoga ye v bata do😢
Mam agar solar panel kaharab hoo jaye ya fir change karwana pade toh kya process rahegi. Aapne mann se karwa sakte hai yaa fir iski bhi koi gov procedure hai
ye faicility abhi bhi chal rahi he ?
mere ko lagana he
We in Mumbai paying too much to adani electricity... But for us we donot have roof to put solar .... One house with 2 ac bill comes to 7000 per month .. for us it is very helpful but we donot have roof to put this... Kuch rasta ho toh batana
Shameful government which stops same plan of Delhi government
Where is the proof😂😂😂
Which plan of delhi govt salary to maulana 😂
Exactly😅😅
BJP dont have educated ppl. What you expect
@@indianindian8859 no of solar plan. Tum andhbhakto ko har jagah muslim hi dikhte kya 🤣
Delhi govt && unke plans 😂😂😂
Government job ho to bhi apply kar sakte hai kya.....
Didi please increase volume in your videos... Volume is very low..
your device volume is low
Good initiative by government however made useless by government employees. I had applied for connection last month. Until last week website was not working. Application was accepted once it started working but since than I am awaiting feasibility approval. I don't know whether I will get connection this time.
all this should be migrated to private players government should just provide subsidy. mere toh 1000 unit see jayda aate hai summers me so mereko jarror lagwana padega ye. problem hai pehle pura pay karke lagwana fir baad me subsidy denge. ak middle class banda kahan see jayega 1.5 lakh rupees.
GOVT EMPLOY KR SKTA HAI APPLY JA NAHI
Thanks I will send this to my mom to explain it better 😤
Punjab state ko agr extra unit genrate ke ke do to kya uske pspcl hme paise deti hai ya nahi????
Tumhe kya jarurat hai tum andolan karo
@@kumrankittume bhut dard ho rha h. kahi modi Tera baap toh nhi ..
@@jaspalgill-xm2us lodee mnu ta tera duja peo lgda jhra vch uthyaaa ohda nm lai k
@@jaspalgill-xm2us delet krta hun cmnt ena e c bss?
@@jaspalgill-xm2us sale aa jnde jije nl pnge lain
Hi Mam
Please a add a point that in after market the 2 KW solar panels will be cost around 1 lakh rupees.
So there is the scam, you can not chose the saler from out side, only from the list.
mera monthly bill summers me 8000 aata hai so i will go for 3kv and subsidy is 78k not 60 and 3kv system will cost 1.5 lakh 2kv is less.
bhai Feasibility Approval me kitna time laga tha
Wo aap ke discom pe depend karega humara 1 mahine baad aya tha approval.
Mam koi rent ke makan wale kese apna ghar le sake vo bhi koi pm yojana se
Par ismai sirf solar panel hai. Inverter betray to hai nhi. Is se accha to bhar se lgvaoge 1kw ka. To 70k -80k mai aaram se lag jayega 2 battery ka.
do you know how much credit will be given per unit for extra electricity?
Sab area me iss facility available nahi hai. Apne area me CESE electricity provider ka option hi nahi show kar raha hai.
West Bengal does not allow net metering . West Bengal has excess production of power
if yo are from haryana you can get 100% free 60% by center gov Remaning pay br state gov jai haryana
Additionally,
GoI has already launched a Power Sector Scheme i.e . RDSS under which around 25cr Smart Meters will be installed which is under process. In Smart Metering, provision for Net Metering has already been kept
Sub badhiya he lekin aapko thoda or sarl bhasa me samjhao ge to aam admi ko asani se samjh me aaye ga
Maine pass k post office se apply kiya
Do we get money for the extra units which are not used that can be transferred to the electricity department? Can anyone please give the answer
No money only unit credit
@@shekharchauhan8152 what's the benefit of that unit when I already have solar to generate the electricity
Apply nhi ho rha hai...details nhi bta rh hai
2 kilo watt solar plan how much subsidy concive customer
Is subsidy allowed for hybrid solar system
Tap investment k upar video banao ki vo safe h ya nahi h or koi scam ya fraud to nahi h detail k sath
Sure, we will try to cover this in our future videos.
Agar solor heavy snowfall ki vjh se Tut Jaye to is condition who will be responsible..
On grid ,off grid hybrid ke baare me kon batega , subsidy on grid me hi milti hai
Ye consumer account no. kya hota hai?
IVRS
mujhe to ek baat ajeeb lag rehi h...........govt sell us 6rs per unit and we give them 2rs per unit!! what a hypocrisy!!!!!!!
Transport and salary of employees
कितना खर्चा होगा जरा ये कोई बताए कया बिहार में भी मिलेगी ?
6*120*12 = around 9000 per year
Seems a typo by editor
Mem agar solar panel koi naturally climate ke Karan Tut Jaye to
After 10 years you have to replace the battery too.. the panel condition will also be deteriorated too..
you will cover the cost in just 5 years next 5 years free. btw, panels par 25years ki warranty hoti hai
Also I heard that company who are installing under pm surya ghar yojna, they use low quality panels compared to what you buy normally
Can those credit can be converted to money
My electricity bill is around 2100 per month then I should apply for 3 kw
Unit k hisab se dekho bhai
Jiske ghar light na ho wo kya kare.
Hamare yaha bahut ghar hai jiske yaha abhi light hi nahi hai.
Jinke paas electricity lagane ka paisa nahi hai. Woh solar system ka 50000 -100000 kaise bhar payega.
Target 100 million
Whenever I try to apply, no option shows in circle name Or division name, and then I can't proceed with the application because it's a required field. What can I do?
Solar is a good option now a days,,,
I like ur style... sidhe point ki baat... u got a team or work alone??
Annual income ka koi criteria hai ya nahi
Yaha ghar hi nahi hai solar kaise lagayenge😂😂😂
Khet me 😂😂
Jab ghar nahi bechare pe to khet kahan 😂😂😂😂😂
78000 is pretty less...I was giving cost of 4 lakhs by vendor if I choose to install 12 3w panel ongrid net meter system
How long could Feasibility approval take ?
Thanks
Welcome 😊🙌
Ghar me solar penal lagwane ke liye youtube pr video dekh raha tha lekin jaise apki video dekhi to mutthi lag gyi 😂
Barish me kaam krta h ki nahi
Government wants full rooftop pitentyial utilisation but us stuck st statistics
However it will help significantly in reducing carbon emissions.
I am owning a flat which is in 2nd floor. Assuming i have got the society approval for solar panel installation in that case can I use this scheme? Eligible?
yes
1kw kitna price lagega total please guid me
1 KW = Rs. 70,000 to Rs. 1,10,000
Aajkal Ashish ke liye taali nahi bajate aap :)
आदर्श आंचार साहिता होने के कारण अभी आवेदन नहीं कर पाएंगे बाद मैं करे 😂😂😂😂
sirf solar panel bta rahi battery kitne ki padegi...uske sath...raat me kaise kaam karega bina battrey ke...
क्या बिजली बिल में फिक्स्ड डिमांड चार्जेस भी जीरो हो जाएगा। जैसे मान लो सोलर पैनल से महीने में घर की बिजली का काम चल गया , ग्रीड से इस्तेमाल नहीं हुआ तो क्या फिक्स्ड डिमांड चार्ज भी नही आयेगा बिल में लगकर?
Vo to bharna padega compulsory
i installed 3kw. total 2 lac . 78000 subsidy by govt. Now enjoy free electricity for next 25 year
Battery change every 4-5 year
battery nahi hoti bhai isame
How much electricity bill were you paying before installing solar roof top?
@@MovieHeals 1500. but in future i am planning to buy electric vehicles
Hamara yaha to UTL ka 185000 me de rahe hai bhai....scam ho gaya tumhare sath😂😂
MINIMUM CHARGES BHI LAGTE HE. BIHAR ME 120 PER MONTH HE
Informative 👍
Thank you 😊🙌
Recently Applied For Subsidy.
Great 👍
Mam, you have explained in very good manner with facts, however as I work in the power sector so I just want to submit some additional changes regarding Applicability of Technical Feasibility Study for Distribution Company:-
As per Electricity (Rights of Consumers) Rules, 2020
Ministry of Power has notified the following amendment dtd. 22.02.2024 in sub-rule 7 of Rule no. 11 (Consumer as prosumer) of Electricity (Rights of Consumers) Rules, 2020
Sub-rule 7A :
The applications for roof top solar photo voltaic systems upto 10 kW capacity, complete in all respects shall be deemed to have been accepted without requiring technical feasibility study and any commensurate enhancement of the sanctioned load of the consumer, as may be required, shall be carried out by the distribution licensee
All distribution companies with approval of their respective SERCs will incorporate the above amendment