Train DERAILS in Atlanta, GA

Поділитися
Вставка
  • Опубліковано 13 сер 2024
  • With multiple locomotives derailed, crews are in a race against time to get them back on track.
    Follow me on social media!
    Instagram: v12producti...
    Twitter: v12productions?la...
    Flickr: www.flickr.com/photos/v12prod...
    #railroad #news #engineering
  • Авто та транспорт

КОМЕНТАРІ • 448

  • @Normal1855
    @Normal1855 4 роки тому +186

    An hour and a half to rerail three trains. That's amazing. Also, those tractors make it look easy when lifting those engines.

    • @axion4957
      @axion4957 4 роки тому +4

      Multi track drifting

    • @nitroplayzbg1730
      @nitroplayzbg1730 3 роки тому

      That is true

    • @sodorflubbs5000
      @sodorflubbs5000 3 роки тому +1

      I agree. I hate to use the cliche but they made it look easy. Mind you, thankfully, they were all upright and I assume no one was too hurt.

    • @michaelstein2535
      @michaelstein2535 3 роки тому

      That’s astonishing,I’ve never seen a rerail

    • @rancelynch6514
      @rancelynch6514 3 роки тому +1

      When ever you see someone who does their job and make it look easy......it's because THEY ARE GOOD AT IT.

  • @pqhkr2002
    @pqhkr2002 4 роки тому +385

    How not to do multi-track drifting....

  • @harrisonofcolorado8886
    @harrisonofcolorado8886 4 роки тому +114

    The thumbnail immediately made me predict everyone's gonna make a drifting related joke in the comments.
    I guess I was right.

    • @MetroGaming75
      @MetroGaming75 4 роки тому +1

      Hey you're from Thunderbolt1000siren channel

    • @harrisonofcolorado8886
      @harrisonofcolorado8886 4 роки тому

      @@MetroGaming75 where else would I be from?

    • @MetroGaming75
      @MetroGaming75 4 роки тому

      @@harrisonofcolorado8886 Pennsylvania

    • @harrisonofcolorado8886
      @harrisonofcolorado8886 4 роки тому

      @@MetroGaming75 well, good guess but actually no, I'm from Colorado. I thought you meant that you recognize me from comments on his video. (I actually saw a few of your comments too)

  • @karlreinke
    @karlreinke 4 роки тому +69

    I've watched Hulcher work many times over the years.
    First off, if it looks like they operate as a well oiled "military style" operation, you're not wrong. In fact they recruit new operators at military job fairs looking for veterans about to be discharged.
    Almost more impressive than how fast they clean up a derailment is how quickly they get set up upon arrival. Those pipelaying machines obviously cannot be transported with the booms and counterweights attached and they must be assembled on-site. Every worker has a job from unchaining the big Cats to threading the cables in the lift blocks.
    There was once a derailment in my town and from the time the trucks rolled in to the time they Hulcher workers were gathered for their safety briefing after assembling the machines was 27 minutes.
    And then there are the machines themselves. These sideboom Cats are old. Very old. Some were built in the late 60s to early 70s. They are very well taken care of and are constantly upgraded.
    In many respects RJ Cormann and Hulcher have living-working heavy equipment museums with these machines.

  • @leonkernan
    @leonkernan 4 роки тому +128

    The Fast and the Furious: NS Drift.

  • @MaxTheHybridButYT
    @MaxTheHybridButYT 4 роки тому +61

    doctor: dont worry, multi track drifting doesnt exists, it cant hurt you
    Multi-track drifting:

  • @cyberrednec
    @cyberrednec 4 роки тому +44

    someone finally did it...
    *Multi track drifting*

  • @MrWc867
    @MrWc867 3 роки тому +10

    Sir Topham Hat......."THOMAS! You naughty engine, I can no longer trust you to lead Percy and James down the main branch anymore, I thought you were a useful engine, but I was wrong. As soon as the workers get you all back to the yard, you will stay in your shed!"

  • @speedyspeedboi762
    @speedyspeedboi762 4 роки тому +96

    Nani?!?! Multi-track drifting?!?!

  • @Trainfan1055Janathan
    @Trainfan1055Janathan 4 роки тому +23

    I've seen #3331 in front of my house in Bath, PA before.

  • @cats0182
    @cats0182 4 роки тому +55

    Remember that in "days of yore". the railroad's own employees and cranes and wreckers would have done the entire job. Today that work is farmed out.

    • @mattberg916
      @mattberg916 4 роки тому +9

      Faster and cheaper

    • @AaronSmith-kr5yf
      @AaronSmith-kr5yf 3 роки тому +3

      I could see how it would be much more cost effective to farm out this type of specialty work. Especially if there are several different rail-roads operating in a specific area. You don't need these guys on your payroll 24/7, unless you're completely incompetent and smashing trains all the time.

    • @louisianagator95
      @louisianagator95 3 роки тому

      @@AaronSmith-kr5yf I would imagine that the same employees that would operate this equipment would have other day-to-day duties, but yeah, the equipment and training would be too costly.

    • @yaboydemoffyaboydemoff7314
      @yaboydemoffyaboydemoff7314 3 роки тому

      RJ Corman which is the company I have been working for, for quite a while has been doing derailments for class 1 across the country for years upon years.

  • @WJack97224
    @WJack97224 3 роки тому +2

    Fine video. Nice recovery. For years I would see the "side-winders" and wondered about their applications and then a few years back I saw a video where they were used to hoist engines and box-cars that had derailed. Thanks again. Good on ya mate.

  • @MrWc867
    @MrWc867 3 роки тому +2

    Wow, one of those aggressive engineers that likes to take up both lanes and not let anyone pass...😊

  • @rodralston2279
    @rodralston2279 3 роки тому +1

    This was a dream cleanup for these guys. It doesn't get any easier than this. Small derailment, easy access, level ground. A challenge would be a derailment on the side of a steep mountain, with half the wreck in a tunnel and the other half on a bridge. These guys would pour in there and REALLY amaze us then.

  • @newwomyn
    @newwomyn 4 роки тому +6

    It seems to me from the initial look of this incident the three units were working the Inman Hump on the Atlanta North District Subdivision. It does appear that at least one of the units made it through a switch, then when the second unit passed through, a joint broke on the frog causing the last two to derail. These three units will be taken to the shop, their traction motors removed, and the wheel sets will be disassembled and inspected for damage, then reassembled. They will be inspecting the couplers and installing new brakes lines and shoes.
    If my memory serves me correctly, the bearings are 6 7/8 GG Class. They will need to be checked for brunelling and broken outer ring counterbores. This is an AAR and FRA requirement in the aftermath of a derailment. Since they were in the yard, they would be under strict PTC, and be running at restricted speed. I was in the industry for ten years as an AAR qualified quality assurance auditor. My main focus was bearings and under carriages for rail cars and locomotives. Norfolk Southern was one of my main customers. I am now retired.

    • @v12productions
      @v12productions  4 роки тому +2

      That's really interesting! Thanks for sharing.

  • @sultansyaifi5404
    @sultansyaifi5404 4 роки тому +8

    *initials D* : I'm the best at drifting ...
    Also Locomotive: *hold my oil*

  • @mikeday6908
    @mikeday6908 3 роки тому +1

    Never stops, never sleeps. Quite an understatement!

  • @jasonasselin
    @jasonasselin 4 роки тому +19

    Very cool! I just filmed a crew putting loaded log cars back on with only hand tools and frogs.

  • @emelody7849
    @emelody7849 4 роки тому +1

    Excellent job to the crew who got the job done so quickly. You guys don’t get enough credit

  • @Ben942K
    @Ben942K 2 роки тому +2

    Unfortunately I responded to a train crash once for work. Before the crew could move the train our job was to vacuum the material out of the rail car first. I don't remember how many loads we removed, but it had to be at least four. Late into the evening after enough weight was removed from the rail car I asked if I could have two sizable springs off of it. I still have them today as decoration/talking piece.
    Those machines doing the work are loud and amazing to watch in action up close. I thought what they had to do was very dangerous as well. One of the lead guys I'm assuming reminded his people to stay off their phones even after much of the work was done 🤦🏾. It was still an active scene with everybody watching and "safety first" in mind.

  • @thomasstambaugh5181
    @thomasstambaugh5181 4 роки тому +9

    I looks to me as though the position of the switch was changed under the second unit. I notice the flashing light on the switch machine at 0:09 and 0:20. In the latter, the crew is clearly looking at the switch. A simple picked switch usually affects only truck, often just one axle. In this case, the trailing truck of the second unit and the entire third unit all went the same way. I'm wondering if somebody jumped the gun in re-aligning the switch.

    • @NJPurling
      @NJPurling 4 роки тому

      Was there an enquiry as to the cause? I assume all 3 locomotives would have been examined as well as the track switch itself.

    • @johnrauner2515
      @johnrauner2515 4 роки тому +4

      Normally switches have occupancy circuits that prevent this. As long as the switch is occupied the motor cannot move. Having said that, I agree this sort of thing usually only effects a single truck. In addition, it usually means the truck ends up on the ground in the center of the switch more or less heading over the center of the frog. So it may be this is a very basic switch with no occupancy detection and as you say somebody jumped the gun.

    • @scottsilvey7522
      @scottsilvey7522 4 роки тому

      The GP40-2 the second locomotive
      had its front truck pick the turnout.
      With it weighing 120 tons the front
      truck easily moved the points of
      the turnout to the diversion route
      and the rear truck of the GP40-2
      and the SD40-2 followed the points
      onto the diverging track and a
      derailment followed and a fun day
      was had by all!!!

    • @thomasstambaugh5181
      @thomasstambaugh5181 4 роки тому

      @@scottsilvey7522 : I can see that scenario as well. I wonder if any investigation was done.

  • @jstoli996c4s
    @jstoli996c4s 4 роки тому +4

    1.5 hours. That is some fast, impressive work.

  • @BNSFBishop
    @BNSFBishop 4 роки тому +3

    Wow nice video and great clear commentary, interesting, I saw 9706, the GE Dash 9 back on December 31 2019, wow.

    • @v12productions
      @v12productions  4 роки тому

      Thanks!

    • @Med0sproductions
      @Med0sproductions 4 роки тому

      BNSFBishop lol interesting meeting you here too bro. its me, EM 24DOT1, just on my main music channel. this video is awesome, i hope NS repaired whatever damages the EMD’s suffered from that

  • @nounoufriend
    @nounoufriend 3 роки тому +1

    Back on pretty fast you have some great equipment for rerailing we would got them in in couple of weeks in UK be a week deciding who to blame

  • @omega_mlg1027
    @omega_mlg1027 4 роки тому +7

    *the train starts to drift* "DEJA VU"

  • @stephendrummer1542
    @stephendrummer1542 4 роки тому +6

    Just plain “wow” folks just getting the job done, kudos to everyone there.

  • @syedjavedahmad9719
    @syedjavedahmad9719 3 роки тому +1

    90 minutes, wow that is amazing progress.

  • @TandemDawgBMG
    @TandemDawgBMG 3 роки тому +3

    The happens on my layout all the time...

    • @MikeT-TheRetiredColonel
      @MikeT-TheRetiredColonel 3 роки тому

      At least it doesn't take you an hour and a half, if it does, then you got some severe problems ;)

  • @royhoco5748
    @royhoco5748 4 роки тому +1

    when I worked for a major railroad they were still using track mounted derricks for cleaning up wrecked trains. slow cumbersome lifting machines that took long times to put equipment back on the rails. this derailment could have been caused by a thin flange on a wheel or a split or gapped switch or the rails could have spread under the locomotives.

  • @craigglowen7243
    @craigglowen7243 3 роки тому

    Tough job! I was a Trainmaster in Janesville Wisconsin, 1969 and a crew like this rerailed and removed a few cars detailed, from a G.M. assy plant. Difficult also, the facility was down in a valley the track circled around the plant going downward!

  • @denisetindall1487
    @denisetindall1487 4 роки тому +19

    I like train videos on UA-cam 😁

    • @389383
      @389383 3 роки тому

      Good, cause there are lots. If you like one all the rest will follow.

    • @_n8787
      @_n8787 3 роки тому +1

      I like tacos

  • @dimidomo7946
    @dimidomo7946 4 роки тому

    You did a fine job with the derailment capture and narration V12 Productions. Nobody got hurt.

  • @SEWisconsinRailfan
    @SEWisconsinRailfan Рік тому +1

    If 3082 snagged a switch, how did the crew go so far without realizing it was on 2 tracks!

  • @greglaplante7593
    @greglaplante7593 4 роки тому +1

    I live in Atlanta and at least 18 Norfolk Southern trains come by every day right behind my house .

  • @edfrawley4356
    @edfrawley4356 4 роки тому

    The tractors as you call them are probably D9 pipelayers that we called wreck dozers with a lifting capacity of 140,000lbs each.

  • @TheFlightSimDude7
    @TheFlightSimDude7 4 роки тому +10

    We need locomotive dashcams!

    • @HustleMuscleGhias
      @HustleMuscleGhias 4 роки тому +6

      They already have those. I believe they are actually required to be a lead qualified locomotive in the consist ( don't quote me on it )

    • @ronbelnap8370
      @ronbelnap8370 4 роки тому

      HustleMuscleGhias not yet a requirement, but very handy

    • @silicon212
      @silicon212 4 роки тому +2

      Loook up General Electric's Lococam. As with GE's Locotrol system, they're on both EMDs and GEs.

  • @twistedaxles9126
    @twistedaxles9126 4 роки тому +1

    Normie was tryna Tokyo Drift.

  • @NashRailfan
    @NashRailfan 3 роки тому +1

    totally relatable in model trains

  • @antonyhobbs1144
    @antonyhobbs1144 3 роки тому

    Sheffield station in England was closed for nearly a week when a train carrying cement wagons was detailed in the station

  • @jerredwayne8401
    @jerredwayne8401 4 роки тому +3

    Never seen these side booms re rail an engine in person but I've seen them on the pipelines

    • @dtbanks42
      @dtbanks42 4 роки тому

      I done it for 3 years form Louisiana California Chicago

  • @alphonsotate2982
    @alphonsotate2982 4 роки тому

    1958 Cat D8 SIDE BOOM crawler tractors normally used for pipe laying used by R.J. Corman Co for rail work.

    • @tomcander3669
      @tomcander3669 4 роки тому +1

      They are not that old..they are late H's and K models. Late 1960s to late 1970s. D7F's and D9G's are also used by Cormann and Hulcher.

    • @rearspeaker6364
      @rearspeaker6364 4 роки тому +1

      @@tomcander3669 AND THEY STAY RUNNING FOR A HUNDRED YEARS AS LONG AS CAT MAKES PARTS FOR THEM.

  • @johnwatson8820
    @johnwatson8820 3 роки тому

    great catch, greetings from suffolk uk,big ns fan,take care!!

  • @JacksonSubNScaleModelRailroad
    @JacksonSubNScaleModelRailroad 3 роки тому +2

    Crazy, I seem to model this almost every day somehow...

  • @jerrykinnin7941
    @jerrykinnin7941 4 роки тому +2

    Rerails are RJ Cormans bread and butter. Those trucks can run at night they're all lit up beacon lights and strobe lights. It's a treat to see.

    • @animenut69
      @animenut69 4 роки тому

      Agreed. Love seeing those cats

  • @towingfromflorida6478
    @towingfromflorida6478 3 роки тому

    As a heavy duty wrecker operator, I enjoy and understand what they are doing, and the how's and why's of what they are doing. Skilled recovery is a art.

  • @haroldreardon8070
    @haroldreardon8070 4 роки тому +4

    Way too much drama in the description. The crews NEVER race to get the work done. R J Corman has their safety logo printed on the CAT's booms and they just like Hulcher work very carefully.

    • @SCRANE1115
      @SCRANE1115 4 роки тому

      I understood it as RJ Corman racing to the scene, not deliberately racing to complete the task. I agree with you there on the narrative. No good railroaders perform that way. Seems very few railroads keep company "wreck crews" in all major places so I thought it a complement to Corman and it's crews. I liked the video. It wasn't a dry documentary about equipment picking switches.

    • @chuckgilly
      @chuckgilly 4 роки тому

      R.J. Corman and others do race to the scene, the railroads offer a bonus if they get the line cleared in a specified time.

  • @GeneralG1810
    @GeneralG1810 3 роки тому

    Damn what a crew, better than what we have here in Australia. Don't get me wrong total props to our guys but I bet they'd love that equipment

  • @baldypalmsrailroad
    @baldypalmsrailroad 4 роки тому +1

    Great narration on what is taking place. Love the drone footage.. Skol! Ron//

  • @kylesnorfolksouthern8345
    @kylesnorfolksouthern8345 3 роки тому +2

    My doctor: “Don’t worry, multi-track drifting doesn’t exist. It won’t ever hurt you, you’re alright.”
    Me watching this: Ú_Ù

  • @DoctorBetterverywell
    @DoctorBetterverywell 3 роки тому

    This is a unique case. It should be entered in the Guinness book of records :-)))

  • @CyclingDinosaur
    @CyclingDinosaur 4 роки тому +3

    Great video footage

  • @KingOp0ssum_II
    @KingOp0ssum_II Рік тому +1

    Bro those locomotives tried to drift lol

  • @lindaterrell5535
    @lindaterrell5535 3 роки тому +2

    When you positively, absolutely must have a specialist.

  • @donalfinn4205
    @donalfinn4205 4 роки тому

    Great video. No bullshit, no padding, no floss, dross or flimflam. Everyone else take note please. Subbed.

  • @gogetthegoose1
    @gogetthegoose1 4 роки тому +2

    Timely and effective job well done!!!👍👍

  • @shellystrohl9393
    @shellystrohl9393 3 роки тому

    My husband has worked for RJ Corman for 20 years. He has operated those booms for most of those years.

    • @v12productions
      @v12productions  3 роки тому

      That's awesome! What an interesting and tough job!

  • @thestarlightalchemist7333
    @thestarlightalchemist7333 4 роки тому +12

    Nobody:
    NS 3082: *DEJA VU*

  • @mrfatty
    @mrfatty 3 роки тому

    Awesome video, thanks.

  • @londonnight937
    @londonnight937 3 роки тому

    I just wish someone in this world would build a test track somewhere, where the 2 tracks are close enough that the locomotive doesn't care it is on 2 separate rails at the same time, and actually do multi-track drifting.

  • @gingerbread6614
    @gingerbread6614 3 роки тому

    Thank you. Good video.

  • @mikeingeorgia1
    @mikeingeorgia1 3 роки тому

    Running through the switch part way and not realizing it and then reversing direction will cause that too.

  • @Dessme
    @Dessme Рік тому +1

    What if the train went down a bridge, how do they get it out? Or will they just leave it to decay?

  • @derrickwilson7467
    @derrickwilson7467 4 роки тому

    Great video! Great explanation! Thanks for uploading this.

  • @yrunaked4
    @yrunaked4 3 роки тому

    I would agree that the middle unit picked the switch. That was probably a cakewalk for those guys to re rail. no twisted stacked up cars with spilled loads everywhere.

  • @thomasfletcher4765
    @thomasfletcher4765 3 роки тому

    Great work on the video and commentary , V12

  • @bpcXD
    @bpcXD 3 роки тому +1

    this is what happnd when i tried to multi track drift with my lego train

  • @SilverCometMedia
    @SilverCometMedia 4 роки тому +2

    Awesome video!!! Very interesting. I never knew there was a derailment at Inman.

  • @TheKurtsPlaceChannel
    @TheKurtsPlaceChannel 4 роки тому

    Fantastic video. Thanks for posting this.

  • @joeythecat7482
    @joeythecat7482 4 роки тому +1

    The way the engines were arranged along with the direction the were going and where they were, the engines were probably switching out cars before the time of the derailment

  • @jwslijm7278
    @jwslijm7278 3 роки тому

    Compare the weight of a single loconmotive with that of all the tractors. A huge difference!

  • @THE_IRON_HORSE
    @THE_IRON_HORSE 3 роки тому +1

    Ok the gp38-2 is heavy enough now imagine a DDA 40x derailing

  • @luisantoniomarrega1120
    @luisantoniomarrega1120 3 роки тому +2

    Parabéns aos operários que estavam fazendo um bom trabalho!🚂👍
    Abraço 😷

  • @jamesboykin7319
    @jamesboykin7319 4 роки тому

    The 3082 (in what we called in mow) Split the switch usually from a sharp flange or an out of adjustment switch point, weak tie's, switch stand etc. usually leads to dinner on the company.

  • @VestedUTuber
    @VestedUTuber 4 роки тому +1

    This is the Multi Track Drifting equivalent of a 16-year-old in a 350Z.

  • @Raymond-rr5iv
    @Raymond-rr5iv 4 роки тому

    I couldn't tell you what you're asking but I have to say this was a very interesting video thanks !!

  • @williamsquires3070
    @williamsquires3070 4 роки тому +3

    They need a big 0-5-0 switcher (hand) that comes down from the sky; that’s how us model railroaders do it! 😏

    • @MattStMarie-bm5sq
      @MattStMarie-bm5sq 4 роки тому

      Have you tried to work out the logistics of upscaling that to work on full scale trains.

  • @ElliottWolcott
    @ElliottWolcott 3 роки тому

    Dang that is one bad train derailment. Did this train derailment got put on the news?

  • @jikemenkins7098
    @jikemenkins7098 3 роки тому

    This is an excellent video

  • @markdiablo4601
    @markdiablo4601 4 роки тому +1

    These side booms are called side winders.

  • @7249xxl
    @7249xxl 3 роки тому

    Great production quality

  • @jasonking2943
    @jasonking2943 4 роки тому +1

    Having worked for NS 27 years just retiring back in oct 2019. Looked as if the switch was picked. Exactly what you stated in the video. It happens more than people think. Normally tho not with the locomotives due to the weight. But it could have been as simple as a piece of rock that didn't allow the switch to close completely. Which is odd because those are not manual switches which would have set a " foul" alert per say. Thankfully it was just a power moved and no cars were involved which cut down on clean up time

    • @v12productions
      @v12productions  4 роки тому

      That's really interesting! Thanks for sharing.

    • @Med0sproductions
      @Med0sproductions 4 роки тому +1

      Jason King i dont doubt it, i just hope NS repairs those old engines!

    • @SOU6900
      @SOU6900 4 роки тому

      Switch could have also reversed under the second unit possibly.

    • @jasonking2943
      @jasonking2943 4 роки тому +1

      @@Med0sproductions I'm sure they will didn't look like much damage at all

  • @benmeyer2916
    @benmeyer2916 3 роки тому

    Very good work by the workers and great shots by you

  • @palmettostaterailfan7019
    @palmettostaterailfan7019 3 роки тому +1

    Multi track drifting.
    Just because the cool kids do it doesn't mean you should

  • @chriswright8464
    @chriswright8464 4 роки тому +3

    Very impressive.

  • @GaryNumeroUno
    @GaryNumeroUno 3 роки тому +1

    Geez, with my company and it's overly complicated rules it would take three weeks to get a locomotive rerailed!

  • @jordanweir7187
    @jordanweir7187 3 роки тому

    I'm surprised that the engine which damaged the rails didn't get damaged too, or maybe they didn't check it before rerailing D:

  • @dennispersson9466
    @dennispersson9466 4 роки тому

    Your analysis of the situation, and reporting was Spot On, just slighty monotone, but overall great. If I were editing TRAINS Magazine, I would probably be sending you a check for that article.

  • @stephenhunter70
    @stephenhunter70 4 роки тому +3

    I'm thinking the switch was reset under the second unit. I've seen thew result in my own suburb, the person responsible blamed the switch.

    • @davidhenderson3400
      @davidhenderson3400 4 роки тому

      I think you are right. The switch was thrown too late or too soon. Either was it happen under the second engine.

  • @-HDK-
    @-HDK- 4 роки тому +3

    And that's how you earn a rail-nickname like "Sideways".

    • @axion4957
      @axion4957 4 роки тому

      Multi track Drifting is better

  • @kens.3729
    @kens.3729 4 роки тому +1

    Very Nice 👍 Narration.

  • @tracycarifa5740
    @tracycarifa5740 4 роки тому +2

    Jim how many times do I have to tell you don’t drift the the locomotives!

    • @drrollercoaster4130
      @drrollercoaster4130 4 роки тому +1

      Ok I will

    • @ns_guy5149
      @ns_guy5149 4 роки тому +1

      Sorry boss it’s just the cars that make me wanna do it

    • @rearspeaker6364
      @rearspeaker6364 4 роки тому +1

      @@ns_guy5149 YEEEEEEEEE----------------HHHHHHHHAAAAAAAHHHHHHHHH!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

  • @hellcatredeye-g6582
    @hellcatredeye-g6582 3 роки тому

    I was wondering how they got trains back onto the tracks.....I live right here just on the outskirts of Atlanta.. we had a bad train accident here in Lilburn When the hurricane just came through last month really bad..It’s amazing how they get the trains back on track.. Thanks for the video

    • @v12productions
      @v12productions  3 роки тому +1

      Thanks for watching! I also did two videos about the Lilburn derailment.

    • @hellcatredeye-g6582
      @hellcatredeye-g6582 3 роки тому

      V12 Productions perfect thank you

  • @musicforaarre
    @musicforaarre 3 роки тому

    What the hell is that in front of the derail, a sun kink in the left rail ? It must have been a damn hot day ! Aarre Peltomaa

  • @dtbanks42
    @dtbanks42 4 роки тому

    I use to with hulcher services. THEY four corner the locomotive put in for sidebooms 583 all four corners.Hook winch lines to the wheel two wheels to align it to the rail. With 583 you have better control of the locomotive

    • @v12productions
      @v12productions  4 роки тому +1

      That's really interesting. Thanks for sharing!

    • @dtbanks42
      @dtbanks42 3 роки тому

      Hulcher services and RJ Corman are two of the biggest railroad derailment contractors in America these guys are all called 24/7 I used to work for live out of a suitcase

  • @arifakyuz7673
    @arifakyuz7673 4 роки тому +1

    MULTI TRACK DRIFTING!!
    *Deja vu, I’ve just been in this time before*

  • @paulmishler402
    @paulmishler402 4 роки тому +2

    It looks like the train tried to do the deja vu but failed

  • @hohobbyist1098
    @hohobbyist1098 4 роки тому +1

    Snagged a switch? Nah. It was the conductor who flipped the switch. He tried multi-track drifting.

  • @leut_januszwowsplayer4721
    @leut_januszwowsplayer4721 3 роки тому

    Excellent voice for narration.

  • @storiesfromdifferenteras
    @storiesfromdifferenteras 3 роки тому

    I suppose it must be difficult to know which way to go when you've got two cabs. But to go two ways at once with only one cab...that really is something. - Anonymous voice, James & The Diesel Engine

  • @nvaa1991
    @nvaa1991 3 роки тому

    Looks like a multi track drifting attempt. That's Norfolk Southerns Function....