Thank you, sir, but as I follow you in this video course as well. as I noticed in this video you didn't add the stiffness modifiers. can you explain this please sir
Thank for such a useful tutorial. But dear it has some mistakes. You said you are gonna use M20 grade concrete but now you choose M25, the grid is also wrong and not matching the original architectural drawings.
I have explained the property modifier in 20 story building project . in this project the design code is IS and it does not provide the modifier values to be used.
This one of the most organized tutorial I have ever seen very comprehensive indeed
Thank You Sir You deserve thousands of Subscribe likes and share from India......
thanks alot dear.
Kudos! your are such an intellectual
Sir, you are really doing a great job. Keep it up.
thanks dear.
What type of software is used in writing the introduction part as a handwritten words?
Thank you sir ❤️
Good sir
thank you.
Thank you, sir, but as I follow you in this video course as well. as I noticed in this video you didn't add the stiffness modifiers. can you explain this please sir
Hi dear
the IS code does not provide the modifier values to be used.
Thank for such a useful tutorial. But dear it has some mistakes. You said you are gonna use M20 grade concrete but now you choose M25, the grid is also wrong and not matching the original architectural drawings.
Why all properties were deleted? Is it recommended?
can you do this series according to ubc 97 and ACI 318?
I have a serious of 20 story building design according to ubc97 and ACI 318 in my channel if intressed you can watch it.
Yes thank you!
Will watch that after this😊
Why roof storey is having master storey option "Yes"?
So good
thanks dear
Sir please explain about property modifier while defining section ..Thank u so much
I have explained the property modifier in 20 story building project .
in this project the design code is IS and it does not provide the modifier values to be used.
Upload some practical project for civil engineers
Sir please provide the pdf file of building plan and auto cad file pdf also....
Dear you took 4' 1" at the bottom but in actual the distance from the top of the plinth beam to the base of footing is 7 feet. Why not take 7 feet?
I think your mistake in grid chek please