Construction time-lapses w/closeups (compilation): Week 96 of the Ⓢ-series

Поділитися
Вставка
  • Опубліковано 3 лип 2024
  • Week 96 in the ongoing Ⓢ series, which follows the construction of a new 13-story senior living building in San Francisco. This is a #construction #timelapse compilation with time lapses and various closeups at various speeds, from the one-week period of November 29 to December 4, 2021, condensing the week's activities into about 39 minutes.
    This week is mostly longer, wider time-lapses, as opposed to closeups, although there are some. The work is almost entirely around the doors and the tile in-between. Hope you enjoy the episode!
    I don't know yet when the next episode will be. This series has lasted longer than I ever expected, and is colliding with other commitments. It will definitely continue (looks like at least past Week 101 now), but in the new year the publishing schedule may be a little more erratic. From now on, I will just be announcing (via the Community Tab) a few days before an episode comes out, so if there's no announcement you can assume no new episode yet. I'll get them out as fast as I can!
    ⏭️ 𝗜𝗻𝗱𝗲𝘅 𝘁𝗼 𝘁𝗵𝗲 𝗰𝗵𝗮𝗽𝘁𝗲𝗿𝘀:
    00:00 - Introduction
    00:17 - Mon Part 1: Tile between doors 1 and 2
    04:40 - Mon Part 2: Tile prep to right of door 3
    05:48 - Tue: Door 2 gets a threshold
    08:23 - Wed Part 1: Dirt and a buggy
    10:07 - Wed Part 2: Fire Dept Connection
    12:18 - Wed Part 3: Panels and lighting door 3
    15:50 - Wed Part 4: Panels and lighting door 2
    16:50 - Thu Part 1: Door 3 and nearby tile
    19:30 - Thu Part 2: Door 2 panels
    22:17 - Thu Part 3: Door 1 gets a threshold (almost)
    23:32 - Fri Part 1: Panels and lighting door 3
    26:58 - Fri Part 2: Tile near door 2
    29:16 - Fri Part 3: Door 3 panels, nearby tile
    32:14 - Sat Part 1: Tile near door 3
    34:05 - Sat Part 2: Tile near door 2
    35:48 - Closing and previews
    🎵 Music licensed from Audio Network. As usual, you're always welcome to listen to your own playlist instead if you prefer (there's no narration or dialogue in the video). In chronological order of first appearance
    Introduction and Monday Part 1:
    Forward Momentum - Gavin Harrison (3540/4)
    Monday Part 2 and Tuesday:
    I Found Out 3 - Oli Swan (3627/87)
    Wednesday Part 1:
    Bullet Dodger - Adam Drake, Gareth Johnson (2679/5)
    Wednesday Part 2:
    Carnaby Street - Christian Marsac (1129/11)
    Wednesday Part 3:
    Virtual Reality - Gareth Johnson (3040/9)
    Wednesday Part 4:
    Blues Walk Fast (60) - Paul Mottram (1154/7)
    Thursday Part 1:
    Grime Street - Philip Guyler, Paul Clarvis (3485/8)
    Thursday Part 2:
    Outervision - Terry Devine-King (3609/5)
    Thursday Part 3 and Friday Part 1:
    Everest Lost 2 - Nick Kingswell (2897/41)
    Friday Part 2:
    Doo The Wop - Igor Dvorkin | Duncan Pittock (1191/1)
    Fri Part 3:
    Famous 3 - Bob Bradley, Steve Dymond, Jonny Firth (2868/9)
    Saturday Parts 1 and 2:
    Blue Notes - Marc Jackson Burrows (3426/7)
    Closing and previews:
    Crack On - Chris Fairbrass, Richard Fairbrass, Neil Sidwell (2686/8)
    This video is not endorsing or recommending, nor was it endorsed by, any business, product, or organization. The appearance of, or mention of, any person, business, product or organization in it is not necessarily an endorsement or recommendation of or by that person, business, product, or organization. This recording is of views and scenes visible to the public.
  • Розваги

КОМЕНТАРІ • 36

  • @berndfreier2798
    @berndfreier2798 2 роки тому +10

    Hello and good morning everyone. I wish everyone a happy new year here and hope you have all got off well. Especially our hospital construction boss. Let's see what he will show us today. Stay healthy. 001

  • @Bill_N_ATX
    @Bill_N_ATX 2 роки тому +9

    Well, you’d think they’d want to wrap it up before week 104. Two years is a long time to build this structure. You know that COVID made a mess of their schedule but I’m sure both the customers and the contractors want this one done.
    And for those of us here from the beginning….boy does time fly!

    • @tonypinker2884
      @tonypinker2884 2 роки тому +4

      Yep I started watching this one from the start of demo on the Radio station.....

  • @curtismeskus504
    @curtismeskus504 2 роки тому +6

    We appreciate the work that goes into making the video

  • @berndfreier2798
    @berndfreier2798 2 роки тому +3

    21:45 The Bird comes back ;-)

  • @constructionwatcher5381
    @constructionwatcher5381 2 роки тому +2

    Thanks for another fine episode. I see in the previews that next week we work yet again on the fin!

    • @HospitalConstruction
      @HospitalConstruction  2 роки тому

      Yes indeed. And believe it or not (you probably will believe it!) there is actually fin work on into Week 101.

  • @lloydbolt6992
    @lloydbolt6992 2 роки тому +3

    I have watched all of these since the start, might have skipped through them of late but still good, Will you do a walk through the building is finished?, would love to see the inside once its done...

    • @HospitalConstruction
      @HospitalConstruction  2 роки тому

      Would love to. But it is a private building and I have no access. So probably not likely, unfortunately.

  • @tonypinker2884
    @tonypinker2884 2 роки тому +1

    For a nice modern looking building the doorways, windows and tilework on the ground floor look so old fashioned it makes you wonder what they were thinking

    • @HospitalConstruction
      @HospitalConstruction  2 роки тому

      Well, it is a building for older, retired persons, so there's that. ;-)

  • @davidwashingtoncontendingf1862
    @davidwashingtoncontendingf1862 2 роки тому +1

    Thank you fire surfer!!👌🏽

  • @emadeldinhessain3272
    @emadeldinhessain3272 2 роки тому +2

    Great. Well done.

  • @musqmeca5301
    @musqmeca5301 2 роки тому +1

    acabando de ver aqui do Brasil as 22:57 do dia 08/01/2022 mais um show da construção Americana, está quase lá está quase no fim.

  • @chaoukizouine9946
    @chaoukizouine9946 2 роки тому +3

    Bonjour du 🇨🇦 👍👍👍

  • @petedriscoll3737
    @petedriscoll3737 2 роки тому +1

    Its been building so fast

  • @davidwashingtoncontendingf1862
    @davidwashingtoncontendingf1862 2 роки тому +2

    Happy new year to everyone! I've been watching this video since day one and enjoying every bit!! I have one question about this building; why is part of the large picture on the building blurred out????

    • @firesurfer
      @firesurfer 2 роки тому +1

      Blocking the telephone number.

  • @petedriscoll3737
    @petedriscoll3737 2 роки тому +1

    u done every floor

  • @rjsc19591
    @rjsc19591 2 роки тому +2

    .. lo veo desde el principio.. ahora me percato de que soy casi dos años mas viejo.... 😭😭

  • @davidsilvera7436
    @davidsilvera7436 2 роки тому +2

    @HC, you got an error in your time caption:
    "22:17 - Thu Part 3: Door 2 gets a threshold (almost)"
    It's actually Door 1 not Door 2.

  • @petedriscoll3737
    @petedriscoll3737 2 роки тому +1

    The video comes every Sunday

  • @lepassionnedegrueatour6064
    @lepassionnedegrueatour6064 2 роки тому +1

    Il vas avoir un nouveau chantier ?

  • @michasleziak1506
    @michasleziak1506 2 роки тому +2

    👍👍👍

  • @commonsense3482
    @commonsense3482 2 роки тому +1

    Any update on next episode noticed nothing for over 2 weeks now?

    • @HospitalConstruction
      @HospitalConstruction  2 роки тому +1

      There will be a post on the "Community Tab" shortly before the next one. Unfortunately, I can't say for sure at this time.

  • @firesurfer
    @firesurfer 2 роки тому +1

    Is this a service entrance/guerney lift ? The floor inside is about 4 foot down. Electric lift? Sure look like automatic opening doors.

    • @constructionwatcher5381
      @constructionwatcher5381 2 роки тому

      The whole side of the building we see here will be commercial space, not part of the senior residential operation. The pedestrian entrance to that in from the street on the right side.

    • @HospitalConstruction
      @HospitalConstruction  2 роки тому

      The ground floor is commercial space, and I've heard rumors that it will be a restaurant and/or bar, but I don't know for sure. I assume there will be ramps and steps down from the doors, but I imagine they leave that up to the tenant(s) to configure after they lease the space.

  • @petedriscoll3737
    @petedriscoll3737 2 роки тому +2

    Its week 96 almost week 100

    • @petedriscoll3737
      @petedriscoll3737 2 роки тому +1

      Give me reply from Me hospital construction channel

  • @danielguilbeau5403
    @danielguilbeau5403 2 роки тому +2

    Ces bouches incendies sont magnifiques 👍👍👍👍👍👍

  • @robertshaffner707
    @robertshaffner707 2 роки тому +1

    Are you still calling that storefront a curtain wall even though it clearly is not by any definition?