This is a great coverage from Shoranur to Thrissur. Loved it. Yes a coverage doing the peak of the monsoon with green lush vegetation around the ghats would be splendid!
Wouldn’t it be possible to double the line from Shoranur Jn to the B cabin and merge it with the main lines before the B cabin which would avoid the need for a third bridge?
@@Travancorepillai how would one line be free?? The train from SRR would be entering on to the down line, but will also block the up line. It's the same problem now as well.
@@Platform7byBinaiSankar I was talking about trains coming from ERS towards SRR. They can go ahead unhindered if the line from SRR to the b cabin is doubled and linked to the main line before the B cabin.
Awesome Dude 👍
Wonderful Compilation
Krishnagudiyil oru pranayakalathu ❤❤❤
37:40 yes, we want❤
njoyed...
37:46 yes
Nice video with a lot of useful info, as usual. 👍
Superb !!!
This is a great coverage from Shoranur to Thrissur. Loved it. Yes a coverage doing the peak of the monsoon with green lush vegetation around the ghats would be splendid!
Engine Sound..❤
37:44 Yes !!
❤🎉great 👍
Please give us a detailed video from shoranuŕ to calicut ìn the present monsoon period.
Will surely do that. That's for the heads up
The name of your organisation was visible at the entrance to Angadipuram station 😊. Nice coverage, bring on the videos thick and fast.
Delighted to receive yr travel video on Wednesday 6 PM sharp. Keep it up Mr Sankar.
Amazing👍👍👍😍😍😍😍😍, keep it up😊😊😊😊, nice journey threw forest and 🚂🚋🚃🚋🚃🚋🚃, amazing👍👍👍😍😍😍😍😍
So now all of your journeys will terminate at Angadippuram? That's nice!
"Krishnagudiyil oru pranayakalathu" film's Krishnagudi was this station, we can see in the film's opening credits
Ente Naadu.Bhagyam undel kaanam🤗
Missing today's video actually
Not keeping well. Hopefully, I'd be able to resume uploads from tomorrow or Friday at the most.
Bro enth work chyunne
Nice vlog. I think srr chts line was constructed as BG , not MG.
Nope. It was built as a MG line. Was converted later.
Wouldn’t it be possible to double the line from Shoranur Jn to the B cabin and merge it with the main lines before the B cabin which would avoid the need for a third bridge?
Even then a train exiting SRR will have to hold a train on the UP Link line
@@Platform7byBinaiSankar True, but at least one line would be free. Anyway if there’s a new alignment for the 3rd line, we could have a solution.
@@Travancorepillai how would one line be free?? The train from SRR would be entering on to the down line, but will also block the up line. It's the same problem now as well.
@@Platform7byBinaiSankar I was talking about trains coming from ERS towards SRR. They can go ahead unhindered if the line from SRR to the b cabin is doubled and linked to the main line before the B cabin.
@@Travancorepillai such crossings are very less and helping only those trains doesn't really help the situation either
54👍
Nsg 5 means
Non Suburban Grade 5
Return train time you know pls
Return time of??
Trisur to angadipuram
@@harisreevijay please refer to NTES for latest and updated train timings.