VIDEOMANUAL SACE Tmax T7M Shunt opening, closing and undervoltage release - SOR ,SCR, UVR
Вставка
- Опубліковано 9 лис 2024
- Videomanual shunt opening, closing and undervoltage release for Tmax T7M - SOR , SCR, UVR. For more information, please visit new.abb.com/low...
Excelente este canal hacía falta localizarlo
L alaram indication is blinking what is the problem?
very informative.
How can I get trip contact
which point for which coil?
From what I found, D1/D2 are for the UVR, C1/C2 for the SCR, and C11/C12 for the SOR
Excuse me. Does anyone know what the position of the closing coil is: C1-C2; C12-C13 or D1-D2
For a Tmax T7, the ABB drawings show C1-C2 are the closing coil connections
@@larsonfraud4156 how about trip coil ( from trip unit ), do you know
@@congvan9556 C11-C12 are connections for the (shunt) trip coil
@@larsonfraud4156 tks bro