Building a Redi Rock retaining wall on a creek

Поділитися
Вставка
  • Опубліковано 27 гру 2024

КОМЕНТАРІ • 16

  • @docwho1912
    @docwho1912 3 місяці тому +2

    Curious to know the total cost of this project. We may need to construct a retaining wall at the beck edge of our yard, in Winston-Salem, that backs up to a flood zone, with known flooding over the past 50 years. Three times in 50 years the basement has ended up with up to a foot of water. The goal of a retaining wall, keep the water from flowing into our backyard, so it continues to move downstream, in-channel (of the creek). Going to guess we are looking at a 50 foot long wall. Probably does not have to be more than two feet high.

  • @chargermopar
    @chargermopar 2 роки тому +8

    All that paperwork and work to build something to keep nature from doing what it wants. Looks like a challenging project but it always amazes me that you can dig next to and under a water level and it is dry. Around here the water level is the same everywhere. I look forward to seeing what Redi-Rock is. Great video although I do turn the volume down when the chipmunks start singing, LOL!

  • @jaboy123
    @jaboy123 2 роки тому +2

    Cool video. Looking forward to part 2.

  • @Omalley600rr
    @Omalley600rr 2 роки тому +2

    Great video looking forward to part 2

  • @Vega02flaco
    @Vega02flaco 2 роки тому +2

    I watch the part 2 first and looks Really good the wall 👍

  • @TheHomePros6221
    @TheHomePros6221 2 роки тому +1

    Great job Sean!!

  • @candyspratt4652
    @candyspratt4652 2 роки тому

    Thankyou,. Looking forward to part 2

  • @FunkyPhantom-y4l
    @FunkyPhantom-y4l Рік тому +1

    The cost of building that wall is almost the price of a home? With everything required to do just to be able to start building the wall. Interesting vid.

  • @yolandarivera8858
    @yolandarivera8858 2 місяці тому

    We all want to kno how much this project cost. Plz do tell

    • @srmcontracting
      @srmcontracting  2 місяці тому

      Paperwork (engineer, permit, waterway) was about 15k. Construction was about 30k

  • @billfenner7084
    @billfenner7084 2 роки тому +1

    How much does the footing have in it.

    • @srmcontracting
      @srmcontracting  2 роки тому

      The footing is 10 yards of concrete. I over ordered a little bit and we ended up with 18" of concrete. The plans called for 12" minimum. Thanks for watching

    • @billfenner7084
      @billfenner7084 2 роки тому +1

      @@srmcontracting Okay. That's not going anywhere.

  • @teachthestory
    @teachthestory Рік тому

    Cost?

  • @MrBenB
    @MrBenB 6 місяців тому

    Part 2.
    ua-cam.com/video/1N1BX8p7m1M/v-deo.htmlsi=58isBKCj38Xx2BV0