The Progress Around J10 Is Doing Well And What They Planed To Do For Build Works Or Closures But They Are Working Really Hard And I'm Very Proud Of This Improvements
Junction 10 on the M25 near Esher does need a rebuild as it’s a very busy interchange with the A3 London-Portsmouth road that passes through Guildford. And I have heard that the A3 could have avoided Guildford with a bypass. Or a tunnel that would have seen the A3 pass underneath Guildford. With the Hindhead Tunnel that was built to allow the A3 to pass underneath Devils Punch Bowl south of Guildford.
Brilliant montage of how it progresses. Well done a big like from me
Thank you! Cheers!
The Progress Around J10 Is Doing Well And What They Planed To Do For Build Works Or Closures But They Are Working Really Hard And I'm Very Proud Of This Improvements
Junction 10 on the M25 near Esher does need a rebuild as it’s a very busy interchange with the A3 London-Portsmouth road that passes through Guildford. And I have heard that the A3 could have avoided Guildford with a bypass. Or a tunnel that would have seen the A3 pass underneath Guildford. With the Hindhead Tunnel that was built to allow the A3 to pass underneath Devils Punch Bowl south of Guildford.