Building a Self Storage Facility Step 3: Foundation Work

Поділитися
Вставка
  • Опубліковано 21 вер 2024

КОМЕНТАРІ • 11

  • @chrism4351
    @chrism4351 3 місяці тому

    Geez no frost protection in Michigan? I'd have a tough time moving forward without it. I can see omitting frost walls, but would still put rigid foam down 24" out to prevent frost heaving. Hopefully you have a good dry subbase and proper drainage.

  • @mitchpater
    @mitchpater Рік тому

    The site Charlie mentioned was mine so appreciate the laser tip. some of the wood moved because of heavy rain and caused some errors but all fixable. either way congrats on your site man looks good.

    • @Retipster
      @Retipster  Рік тому

      No kidding! Wow, small world. I'm glad you could get it all fixed up at your site! :)

  • @robthebuilder4004
    @robthebuilder4004 9 місяців тому +1

    Like the series! How did you select the contractors?

    • @Retipster
      @Retipster  9 місяців тому

      I just focused on finding a good General Contractor, and then my GC found the right subcontractors.

  • @MasterPassiveIncome
    @MasterPassiveIncome Рік тому

    Super impressive buddy! Let me know if you need an investor. LOL!

    • @Retipster
      @Retipster  Рік тому

      Thanks, Dustin! I'll keep that in mind.

  • @bruceakeman8274
    @bruceakeman8274 8 місяців тому

    why am i not seeing a vapor barrier go down . i think you place it before steel bars. your floors are going to sweat? yes ,like the thicking edge footing.

    • @bruceakeman8274
      @bruceakeman8274 8 місяців тому

      still, super good job. liked the Lazer , have not seen this.

  • @Tim_Krause
    @Tim_Krause Рік тому

    $300k save! Nicely done!!!!

    • @Retipster
      @Retipster  Рік тому

      Yeah, no kidding! Dodged a bullet on that one.