Time-Lapse of the Gordie Howe International Bridge project | April 2022 to December 2024

Поділитися
Вставка
  • Опубліковано 23 гру 2024

КОМЕНТАРІ • 12

  • @Ashley-ku7is
    @Ashley-ku7is 4 дні тому +6

    The precision needed to connect the two sides perfectly in the middle is astonishing. Well done!

  • @robertbenefiel2781
    @robertbenefiel2781 4 дні тому +7

    Can’t wait to cross the bridge!!

  • @dirkus3722
    @dirkus3722 4 дні тому +23

    For future time-lapse videos, please consider showing one point of view from start to finish, then another point of view start to finish, etc. Thanks!

    • @allanc5743
      @allanc5743 3 дні тому +1

      You wouldn't be able to see everything from one spot. And if they showed every angle from start to finish, people would tune out because the video would be too long.

    • @dirkus3722
      @dirkus3722 2 дні тому +1

      @@allanc5743 You misunderstand me. They already showed start-to-finish from multiple perspectives, but kept switching between them. I'm suggesting the exact same footage, exact same length, but rearranged to show each perspective one at a time.

  • @Tabbylover55
    @Tabbylover55 4 дні тому

    This time lapse was oddly meditative...
    Such a magnificent engineering achievement, well done to all the thousands of people involved!

  • @John-Adams-Can
    @John-Adams-Can 3 дні тому

    Mr. Hockey would have been proud of 🇨🇦

  • @JohnCotterell-zm4ds
    @JohnCotterell-zm4ds День тому

    Imagine what the Ikea assembly manual would look like for this!

  • @mrb5103
    @mrb5103 4 дні тому

    Wow!🥰

  • @denelson83
    @denelson83 4 дні тому +1

    There is still a lot more work to be done in the next nine months before this bridge opens.

  • @michaelm7116
    @michaelm7116 4 дні тому +2

    oh canada

  • @SWATT101
    @SWATT101 3 дні тому

    Whew...just in time for a 25% duty lol