- To drive forward the energy transition, huge wind turbines are needed at sea to harvest powerful sea winds and supply green electricity for the mainland. The dimensions of modern offshore wind turbines are now enormous. So are the challenges for handling their gigantic components. The first Liebherr LR 12500-1.0 crawler crane to be delivered, including a seven-and-a-half wide HighPerformanceBoom, had its first job in the port of Rostock. The completely newly developed crane bolide had to lift almost 90-meter-long foundation pillars into the water.
#liebherr #crawlercrane #energytransition
Key moments:
00:00 Intro
00:12 Transportation
01:15 Assembly
03:23 Deployment
📱 Follow us on social media ▬▬▬▬▬
► LinkedIn: / mobile-and-crawler-cranes
► X: / lh_construction
► Instagram: / liebherrconstruction
► Facebook: / liebherrconstruction
► UA-cam: / liebherr
🌐 About Liebherr ▬▬▬▬▬
The Liebherr Group is a family-run technology company with a broadly diversified product portfolio, which includes a total of 13 product segments. The creative exchange between the segments promotes the development of innovations and visionary technologies, fascinating products and services, which make a real difference. Liebherr aims to inspire their customers with all their solutions. In doing so, the limits of what was previously feasible are being redefined time and time again, meaning Liebherr often also contributes to the technological progress. - Наука та технологія
Faszinierenf für mich ist nicht alleine der Ingenieur der dieses Ding plant, sondern viel mehr die Arbeiter die den Kran mit Toleranzen von einigen zehntel Millimetern zusammenschweißen. Dort hilft dir der Arbeiter von Timejob bestimmt nicht weiter.
Unsere Mitarbeitenden leisten hier einen mega Job 💪 💛
Awesome Liebherr Bigger Crane
💛 💪
Einfach ´´faszinierend``.Tolles Video!Danke!👌👍
Nice to see that you still do videos of that kind. Very impressive crane!
Thank you 💛
Insane😮
Power 💪
💪
Amazing size of hook..!!!!
💛 💪
nice, but when you buy one, do you have to ask for it to be rigged first?, as this looks like a giants Lego set. ( lets hope they give better instructions than Ikea to assemble it!).
Ha ha ha, looks fun though 😅
Our Liebherr experts help to setup such a crane the first time and we have of course manuals for the set up of each crane 😉
Great😮
💛
AWESOME POWER
💪
Wir waren mit dabei #maxikraft 🩶💙
Es war unfassbar und sehr schön, danke an alle die mit dabei waren 🙏✌🏻😎👍🩶💙
Nice
💛
I like this small toy !
😄💪
Magnificent engineering machine...I wonder how long it takes to assemble this gigantic crane?
Damn how much does that block weigh?!?!
AWESOME 💪💪💪 Price please? Cost of transport and assembly?
About 100 euro per hour mate. 4 hour minimum hire.
In the words of Wedge Antilles, "Look at the size of that thing!"
It's really impressive 💪
interesting developements ,the centre part (hipbone and turntable) is totally designed to become the absolute hub to connect everything around ... and the crane divided in pieces it can be transported everywhere and pass roads and bridges. Impressing technology !!
💛 💪
I don't know what that piece weighs, but it arrived on a *lot* of axles.
Approximately 1700ton. Baltic Eagle Offshore Wind Farm
Where is the crane installed?
Port for Rostock. Maybe you need to read the description?
@@towercranesbelarusactually it was moved since, it’s now in Eemshaven
The crane job in the video was at the port of Rostock, Germany 🇩🇪
What was the massive pipe for? And why were they immersing it? That’s one freaking colosal piece of crane, what kind of engine is the one responsible to power the tracks?
These pipes are monopiles for offshore wind turbines. They are manufactured by EEW Group in Rostock, Germany
@@date-1765 but shouldn’t they put the on a ship or something?
@@discoverymoi Well, they are transported on ship depending on destination ans usecase, but can also transported floating in water when closed off, which requires smaller ships
Thanks for the explanation @@date-1765
nice video hope future have 3500ton or 4000ton lr crane however i know not impossible
Liebherr HLC 295000 offshore crane is a favourite of mine, can lift upto 5000 tonnes & a maximum lifting height of 175 metres above deck.
💛 💪
Liebherr-MCCtec Rostock
naw, this one is build in Ehingen...
Definitively not from LED in Lindau. 😂
Schickt ihr eigentlich 18-Jähre Fahranfäger in eure Fahr-Kräne die mit ca. 100 Sachen mit euren Fahr-Kränen über die Landstraße brettern?
How Much $ ?
lifting for 🤔🤔🤔
Ich stelle mir immer zu die Frage, wie hebt man die neues WKA ( Haus ) an?
Denn selbst ein WKA mit nur 5 MW ist so groß und so schwer wie ein EFH. Dann kommt ihr mit solchen Videos um die Ecke und ich kann daran glauben, das du 15 MW WKA wirklich montieren kannst und das kein Fake ist.
# Man stelle sich vor, da passt was nicht ! Aber Liebherr baut ja jeden Kran einmal zur Probe bei sich auf, auch wenn das bei dem alles so neu ausschaute, als ob es wirklich das erste mal gewesen wäre.
Richtig, all unsere Krane durchlaufen einen Abnahmeprozess und werden dort einmal durchgetestet 😉
@@LiebherrGroup Damit es auf der Baustelle eben so schön geschmeidig ausschaut, als ob das ein Kinderspiel wäre.
# Es wie beim Ballet, was so leicht ausschaut, ist echte harte Arbeit und jahrelanges Training
👍 💛
hello for approximate information purposes, what is the amount of this beautiful toy 🤔🤔🤔 €€€€€
🤩🤩🤩🤩🤩
H boom ?
HighPerformanceBoom 💪
What a beast! its wild to see what the EU is going to spend to do the wind energy scam. We have nothing even close here in California. It always blows me away seeing how big these machines are!
💪
Grauenhafter Videoschnitt !
Hat der Video-Editor eigentlich verstanden, das er da ein Produktvideo und kein Musikvideo zusammenschnibbelt ??? - Schade drum !