КОМЕНТАРІ •

  • @maxmarcus6074
    @maxmarcus6074 4 роки тому +37

    I'm studying building and construction and I had a 3 hour long class covering this. But you managed to explain it in a very simple and explanatory manner! Much appreciated

  • @Constructacademy
    @Constructacademy 3 роки тому +2

    Thanks for taking the time to make this video. The benefit of a bill of quantities versus other pricing documents is that you have a suite of unit rates to value change. In addition to this the use of a standard method of measurement provides defined rules of measurement as well as making clear what is to be included within the item. Thanks again for the video

  • @SEEISOMATHEBE
    @SEEISOMATHEBE Рік тому +1

    well explained my man. i hope Junior engineers get to see your work. clean and simple

  • @wazir3647
    @wazir3647 9 місяців тому +2

    Sir what's the difference between
    1 bill of quantities
    2 Interm payment certificate
    3 Rate analysis documents
    4 Abstract of quantities
    5 Quotation
    Will not it cover in BOQ?

  • @johnrudsterjamolo9319
    @johnrudsterjamolo9319 3 роки тому +7

    Thank you for this very informative video, sir! hands down.
    sir, do you have a sample overall BOQ of a certain project?
    thank you

  • @jibrillaibrahim6722
    @jibrillaibrahim6722 3 роки тому +2

    Tnx for taking time to make this video in other to compact knowledge to flows members

  • @theotema2053
    @theotema2053 3 місяці тому

    You just saved my attachment! Thank you Sir ❤❤

  • @RaviKumar-ri5kx
    @RaviKumar-ri5kx Місяць тому

    Great explanation in simple way, Thank you brother

  • @brendankaipa
    @brendankaipa 10 місяців тому +1

    Great explanation

  • @golamnur989
    @golamnur989 2 роки тому +1

    Thanks for making this video. Very well explained. I am from india working in Kuwiat I truly appreciate your work.

  • @ДмитрийКалиыгин
    @ДмитрийКалиыгин 2 роки тому

    Mesej yang jelas, struktur yang jelas, mudah difahami, terima kasih

  • @darshan.sardhara
    @darshan.sardhara 3 роки тому +2

    Can I get 4-5 sample files of BoQ which you have already made..?

  • @Spreadpeaceall
    @Spreadpeaceall 2 місяці тому

    What are all method using in bill of quantities, please explain

  • @kolajoadeyinka5540
    @kolajoadeyinka5540 2 місяці тому

    How did you write the M2(meter square) or M3(meter cube)?

  • @engineersaqib2328
    @engineersaqib2328 3 роки тому +1

    Great lacture, I got your point. Thank you

  • @majeedbaz
    @majeedbaz 4 роки тому +1

    Greeting sir,
    in this video you have explained about how the boq will be look like and as a contractor how it supposed to be rated for bid submission, if there is any explanation about how it supposed to be prepared?
    your saying in this video these boq will be prepared by profound personals using drawings.
    but actually i have to know about how those profound professionals preparing the description of work?
    for exmaple in your boq description for P.C.C works says "providing and laying machine mixed P.C.C with 20mm down aggregate including the cost of formwork, compaction, levelling and curing all complete"
    how these description were prepared by the professional and which types of measurements book they are using to prepare and in what order they are preparing it ?

    • @moodup1251
      @moodup1251 4 роки тому

      Have you got the answer ?

    • @alexansahlarbi
      @alexansahlarbi 3 роки тому

      Those descriptions are usually based on Architect or Engineer specifications. The BOQ is put together using standards. A very common one is the SMM 7 (The 7th edition of the standard method of measurement). Consult a professional QS for these services

    • @taffyjones1642
      @taffyjones1642 2 роки тому

      @@alexansahlarbi I dont think SMM 7 is used; I think the "standard" standard in use now is NRM 2.

  • @hanihashem8883
    @hanihashem8883 2 роки тому

    Hi.thanks to brief and clear topic
    But I ask you can explain me rate price in the table

  • @mwelipama6884
    @mwelipama6884 4 роки тому +2

    You are awesome man 👍

  • @nowshadalimondal2084
    @nowshadalimondal2084 3 роки тому +1

    What is the name of this two software?

  • @venkateshp6980
    @venkateshp6980 5 років тому +1

    Thanks for the video,
    with this video i got to know how BoQ is created but my doubt it , while quoting the BoQ Amount Eg: PCC work which might need some sub materials , how they will extract the exact materials bifurcation needed & their prices as it varies as per market rate.
    Need some more details on bifurcation of mateials

    • @engineeringacademy9812
      @engineeringacademy9812 5 років тому

      Rate analysis is done to get the price of the work. For that, each place has got its relevant rates and those rates are used.

  • @AhmadAhmad-xp8ff
    @AhmadAhmad-xp8ff 3 роки тому

    Hello sir, i am currently residing in kuwait and i want to learn quantity surveying course which is applicable here in middle east, please help me,

  • @manthanpatel6103
    @manthanpatel6103 2 роки тому

    Make One video for that
    Rule of BOQ making

  • @moodup1251
    @moodup1251 4 роки тому +1

    Excellent explanation thx

  • @chaitali007
    @chaitali007 3 роки тому

    can you please tell me how to download BOQ excel sheet.

  • @mathworkph9706
    @mathworkph9706 3 роки тому

    Do you have sir a sample of specification? One of the requirements for building permit. Big help thanks. New sub here

  • @queenahmeyo9534
    @queenahmeyo9534 5 місяців тому

    Excellent 👌👌

  • @prakashYadav-kr1rq
    @prakashYadav-kr1rq 4 роки тому

    Thank you so much sir very informative video

  • @YenNguyen-zb1ef
    @YenNguyen-zb1ef 2 роки тому

    Character In the video It's great, I like it a lot $$

  • @danielditinti4692
    @danielditinti4692 3 роки тому

    How Do you determine the rate. Is there anywhere where you find this rates

    • @alexansahlarbi
      @alexansahlarbi 3 роки тому

      Rates are calculated based on cost of inputs such as materials to be used, labour and equipment required with a margin for profits and overheads.

  • @mohamedrifkey1826
    @mohamedrifkey1826 3 роки тому

    Decription of work is given or we neeed to do it

  • @davidWangara-ct3ow
    @davidWangara-ct3ow Рік тому

    How to fill abq of a massonte plumbing work

  • @chakekarabo1421
    @chakekarabo1421 3 місяці тому

    Sir how to estimate the rate?

  • @amandaconteh-harris6924
    @amandaconteh-harris6924 2 роки тому

    Thanks

  • @adnanmalik7900
    @adnanmalik7900 4 роки тому +1

    Sir can u please tell how to create excel sheet like that table and heading how can I write?

  • @jayganeshroadways8093
    @jayganeshroadways8093 4 роки тому

    Can you send any video based on labour contractor of buillding stucture how we should start a service of labour based on BOQ

  • @ajmalkhan4261
    @ajmalkhan4261 3 роки тому

    tnx you sir i am from Pakistan.

  • @teak_2878
    @teak_2878 3 роки тому

    thank you very much

  • @saptarshighosh9365
    @saptarshighosh9365 3 роки тому

    What is name of this software?

  • @namphuonghathi9925
    @namphuonghathi9925 2 роки тому

    how do you do that?

  • @shosho7067
    @shosho7067 3 роки тому

    Well Explained, Thnx.

  • @sarojkhatiwada6224
    @sarojkhatiwada6224 2 роки тому

    And what's the difference between boq and abstract of cost????

  • @flavoursofsubitha6142
    @flavoursofsubitha6142 3 роки тому

    Hi, how to take quantity from pdf easily.

  • @zedagimtesfaye3103
    @zedagimtesfaye3103 4 роки тому

    thanks so much can u give more explanation

  • @saikoujammeh2052
    @saikoujammeh2052 4 роки тому +1

    Very useful to me, thanks

  • @suryarekapalli8972
    @suryarekapalli8972 3 роки тому

    What is meaning of APSS No 308 in earth work excavation in estimate

  • @Relax-kx1eu
    @Relax-kx1eu 5 років тому +1

    Really useful

  • @nooreehussain7979
    @nooreehussain7979 Рік тому

    What is QRO in BOQ

  • @amandaconteh-harris6924
    @amandaconteh-harris6924 2 роки тому

    Can you make the writing clear sir

  • @kostadinkocev2669
    @kostadinkocev2669 3 роки тому

    I am wondering does the unit rate consists of the labor work as well as the approximate price of the material or it is just the labor work by the contractor. In this video I can find out that it is only the labor rate considered by the contractor but in practice, I have seen it mixed with the material price as well - I am not sure if that is correct?

    • @taffyjones1642
      @taffyjones1642 2 роки тому

      The Rate Analysis should cover everything for one unit. So when the "Rate" is placed on the BoQ, it includes all labor cost, material cost, contractor profit, transportation cost, etc. Again, the type of contract must be considered. For example, if the client will supply materials, the material cost is excluded from the Rate Analysis.

  • @bnnbn1639
    @bnnbn1639 4 роки тому

    Teacher, I want to clib BOQ for structures .

  • @pRashAntpOuDel
    @pRashAntpOuDel 2 роки тому

    Please can you give me the excel sheet

  • @sarasamad4883
    @sarasamad4883 3 роки тому

    whats the differnece between a contractor and a consultant?

    • @madanbajyu4967
      @madanbajyu4967 Рік тому

      consultant make drafts and designs but contractor do the construction work.

  • @javierforbes215
    @javierforbes215 4 роки тому

    how do you determine rates if you are inexperienced?

  • @JeanetteNelson-l6v
    @JeanetteNelson-l6v 2 дні тому

    Lockman Trail

  • @TanvirAhmed-xr8il
    @TanvirAhmed-xr8il 4 роки тому

    great video

  • @civilhorizon4045
    @civilhorizon4045 4 роки тому +2

    Jai nepal.....🙏🙏🙏🙏awesome

  • @parasmanibhatta4117
    @parasmanibhatta4117 3 роки тому

    I guess your are the same person who taught ETABS from Uemy :)

  • @saifurrehman2805
    @saifurrehman2805 3 роки тому

    Nice sir

  • @engineeringacademy9812
    @engineeringacademy9812 4 роки тому +1

    Now you can join our Facebook group. Click on the link below ot join:
    facebook.com/groups/2574131862914436/

  • @srvpoudel
    @srvpoudel 4 роки тому

    Do you teach detail estimate preparation?

  • @TerriGuiterrez-i7p
    @TerriGuiterrez-i7p Місяць тому

    O'Keefe Glens

  • @avinashshrivastav6925
    @avinashshrivastav6925 4 роки тому

    Sir can I get the excell sheet of this BOQ please

    • @lilibine1959
      @lilibine1959 3 роки тому +1

      yes i have this type of excell shetswhich is authorized by nepal gov. if u intrest then send me your gmail

  • @juruket
    @juruket 4 місяці тому

    mayben someone can translate to bahasa "lead 20 m as per instruction of the site engineer all complete" because i use google translate, lead is memimpin. please translate me. thanks

  • @engineerahmed7248
    @engineerahmed7248 3 роки тому

    Not necessarily u quote below break even price...Contractor may quote to win contract to get his name into trusted contractors' book...In movies they do it to win over client's trophy wife.

  • @MaryKerns-y9l
    @MaryKerns-y9l Місяць тому

    Tobin Shores

  • @alijafri1615
    @alijafri1615 10 місяців тому

    Mjhe pdf file chahiye kisi k paas hogi kya plz

  • @mimi-qx9wf
    @mimi-qx9wf 4 роки тому +1

    i saw the video in udemy also ...im regretting paying for it.😑😑

    • @engineeringacademy9812
      @engineeringacademy9812 4 роки тому +1

      You don’t have to. Because udemy has got lot more videos than this. Also, you get the certificate after completion.

    • @hanafouad139
      @hanafouad139 3 роки тому

      may you share the link

  • @manjuale3379
    @manjuale3379 4 роки тому

    bro sanga engineering bhanda how to speak fulent english siknu parla jasto xa

  • @FatihiYassin
    @FatihiYassin Рік тому

    👍🏿

  • @roadsafety7079
    @roadsafety7079 2 роки тому

    Copy karke enter ok kar dete ho banane Nahi aata

  • @cosifilrenedy.lopini5550.
    @cosifilrenedy.lopini5550. Рік тому

    Uganda

  • @yb8904
    @yb8904 4 роки тому

    Prozect

  • @shumetnecho1471
    @shumetnecho1471 3 роки тому

    👍👍👍👍👍👍👍👍👍👍👍👍👍👍👍like

  • @katherinefreeman2521
    @katherinefreeman2521 Місяць тому

    White Maria Young Lisa Walker Thomas

  • @michaelsenyah7333
    @michaelsenyah7333 Рік тому

    Amazing explanation

  • @mohammedaslamrifdhy4004
    @mohammedaslamrifdhy4004 Рік тому

    Thanks

  • @amandaconteh-harris6924
    @amandaconteh-harris6924 2 роки тому

    Can you make the writing clear sir