Complete new Eurobond firewall

Поділитися
Вставка
  • Опубліковано 3 лис 2021
  • Our client in Nottingham was splitting his current industrial building into a number of units. This required a firewall to be installed along the full length and width of the existing. We were also tasked with stabilising the existing block work wall between the columns. Fantastic work carried out by the team. Brilliant work.

КОМЕНТАРІ •