Thai House Build Week 11 - Walls & Roof go up

Поділитися
Вставка
  • Опубліковано 22 сер 2024
  • Week 11 of our Thai house build saw the block work for walls begin along with the start of the roofing system. Both teams are working alongside each other on site. Week 10 was a week off for the builders while the column concrete cured for 7 days. Good progress is being made, in between rain showers.

КОМЕНТАРІ • 2

  • @rimzalia1362
    @rimzalia1362 Місяць тому +2

    Ensure your contractor install wire mesh where concrete meet AAC blocks. It avoids surface wall crack in the future

  • @mabamabam
    @mabamabam Місяць тому +1

    Interesting.
    Its like a standard south asian post and beam but updated a bit with the concrete slab, steel roof, and AAC.