Heatwaves and Mivan Construction The Mivan technology enables extremely rapid construction, improves durability and earthquake resistance, and reduces wall thickness and increases carpet area in high rise buildings. The Mivan construction technology essentially comprises a highly durable aluminum formwork fabricated in the shape and layout of the building including the walls, columns, beams, and slabs. It is extremely modular and uses the same formwork for all the floors of the building. The steel reinforcement is fixed within the formwork and concrete is poured into it to make the different members of the building. When something sounds too good to be true, it is. As good as Mivan construction sounds, however, there are some disadvantages: High modularity comes at the cost of extremely low flexibility. The initial cost of making the formwork is prohibitive and therefore is only suitable for skyscrapers or extremely large sized projects. But those are not its biggest disadvantages. The proverbial cake is taken by thermal insulation. Mivan construction technology uses reinforced cement concrete as its only material. Since the entire building is made with concrete and steel, both being materials that offer notoriously low thermal insulation, energy efficiency of such structures is almost zero.
sir need one suggestion. it's been 1 year of oc applied but not received yet and flat not received. builder not giving any concrete reply. what to do? where to complain? also will builder adjust delay charges in final invoicing ?
Excellent stuff as always.
You rock Amitjee
Heatwaves and Mivan Construction
The Mivan technology enables extremely rapid construction, improves durability and earthquake resistance, and reduces wall thickness and increases carpet area in high rise buildings.
The Mivan construction technology essentially comprises a highly durable aluminum formwork fabricated in the shape and layout of the building including the walls, columns, beams, and slabs. It is extremely modular and uses the same formwork for all the floors of the building. The steel reinforcement is fixed within the formwork and concrete is poured into it to make the different members of the building.
When something sounds too good to be true, it is.
As good as Mivan construction sounds, however, there are some disadvantages:
High modularity comes at the cost of extremely low flexibility. The initial cost of making the formwork is prohibitive and therefore is only suitable for skyscrapers or extremely large sized projects. But those are not its biggest disadvantages. The proverbial cake is taken by thermal insulation.
Mivan construction technology uses reinforced cement concrete as its only material. Since the entire building is made with concrete and steel, both being materials that offer notoriously low thermal insulation, energy efficiency of such structures is almost zero.
Mivon construction flat heat kafi jyada hota summer me. Second future me khuch bhi alteration nahi ho sakta. Rest of the things is ok
Keep up the great work sir … articulation and knowledge 👍🏼
Sir, i learnt of mivan 2 years back. This i learnt from you tube. But in real life people/ builders still do not talk about this.
Sir upto 12 floor building me bhi mivan jaruri he??.. because people says only high rise buildings need mivan??.. please suggest Sir🙏🏻
What about expansion joint in Milan constructions
Mind blowing 😇
Very informative Video Sir
Is it wise decision to take top floor in Mivan technology Sir?
Sir Kamaal ke examples dete ho aap
Tata la Vida construction is brick type. Can we burly flat there. Or we have to buy only MIVAN
Hello Sir, The outer walls are constructed my MIVON, While internal walls by Bricks.. what could be suggestion???
गुरुजी Mivan के बारे में एक doubt है... क्या Mivan construction low rise society में भी हो रही है, or is it only for high rise Apartments?
I have myself seen construction of 2 floors in a month for mivan
Sir ek video ...DDA flats (80s or 90s wale) per
Good information sir ji
Sir, Can you please let me know which are MIVAN construction in Dwarka Exp. Aff. Housing
Sir what are Mivan projects upcoming in Ahmedabad?
sir need one suggestion. it's been 1 year of oc applied but not received yet and flat not received. builder not giving any concrete reply. what to do? where to complain? also will builder adjust delay charges in final invoicing ?
Mind blowing
What is difference between Mivan and Mix-Mivan technology Sir?
Half of the walls are mivan and some part of the walls can be bricks. But going for full mivan is risk free.
Sir, Delhi ke DDA flats par bhi koi video banaiye.
Sir, what all projects are constructed using mivan technology ? And what all builders will be using in future projects?
Mivan only
Shapoorji, Hero, Sobha etc in Dwarka Expressway
MIVAN is the only future.
Informative video sir ji....sir kya panchkula aur Chandigarh mein mivan project aaya hai ya nahi sir...
PR 7 ke around mohali mein bann rhe ab
What about non mivan low rise project at premium location
Hasyaspad
Hasyaprad
Hasyaspad :)