Update 2024 Cab Ride
Вставка
- Опубліковано 8 жов 2024
- The New Orleans Streetcar Line was rerouted and at the same time extended by about 10 meters. This video tells the story of it being displaced by the new route of the Mainline. At the end there is a Cabride over the new Route.
. Good video, like .
Thank you.
Masterpiece of work
You are too kind.
I shudder to think how much maintenance time this must take . . . .
I have enjoyed watching (remotely) your layout grow. It is beyond my vocabulary to express my appreciation of this work of art. But the question remains about maintenance. A lot of your foliage is real so there must be a lot of leaves, twigs, lawn clippings, etc., etc. that require your attention. Are you in there every day for an hour or two grooming the greenery?
I seems you are a steady customer of mine, I appreciate that. You are right, the greenery does take a lot of my attention and time. I am out there not every day, but quite often. Not a lot of my foliage is real, but all of it. It needs trimming all the time (so do the weeds). It seems I am out there more often tending mother nature than running trains.
Amazing...simply amazing....
Cheers
Thank you and cheers to you too.
Is the bridge over the pond being repaired or have you removed it😮
Lovely video as always and like these little updates so we know it’s still going.
The three bridge sections were repaired, but did not go back into place. The racoons have won, I gave up. Two sections have found a new home, one on the mainline, the other with the streetcar expansion. I still have a spare leftover.
Thanks for liking the video. I will continue to have an update now and than.