700 MWe Indian Pressurized Heavy Water Reactor
Вставка
- Опубліковано 16 лип 2024
- This is the third webinar organized by INAE Mumbai Chapter .
The Webinar was on "700 MWe Indian Pressurized Heavy Water Reactor" .
Speaker : Mr. AK Balasubrahmanian, Director (Technical) NPCIL, Mumbai
Co ordinator: Dr. RB Grover, FNAE, Co-convener, INAE Mumbai Chapter, Emeritus Professor, HBNI , Mumbai - Наука та технологія
Very good informativation about 700 MWe Design
Nuclear power is important from climate change perspective
👏☢️❤
if you have everything you can do it modular fashion to reduce the 48 months time limit, unless oxide is limited in quantity
I hope that Indian Govt would consider to further develop the I-PHWR design to a capacity of 900-MWe.
As the PFBRs continues to get delayed its best that Indian Govt must consider to Sign a deal with Russia for for Construction & T-o-T of "BN-800 FBRs" in India by BHAVINI.
At the same time the focus must be to firstly set up BARC's indigenous 900-PWR & then increase scale up the Design to a capacity of 1000 to 1500-MWe.
Nuclear Energy must become contribute at least 10% of India's total Electricity production till year 2035 & up to 20% till year 2050.
We have deign and talent . We can develop our own reactor of any power we need.
Construction of БН 800 in India? Where did you get this from?