Basic Solar Installation in 2 Minutes

Поділитися
Вставка
  • Опубліковано 17 вер 2024
  • Group 3 built this solar #Power generating substation. Hear from the lead who explains what was done. They even earthed the installation to protect from over surges. Congratulations Group 3.
    The Renewable Energy Technology Training Institute (RETTI) is developing the capacity of young Africans to design, construct, manufacture, install, distribute and repair solar systems aiding Africas transition to clean energy and full access to electricity.
    We do the following:
    📌Train
    📌Examine
    📌Provide Internships
    📌Supervise student take home projects
    📌Induct into the Growth Support plan
    📌Provide information for starting a solar business.

КОМЕНТАРІ • 4

  • @MarySarah-e7r
    @MarySarah-e7r 6 днів тому

    We have solar panels 160W two places and we want to get battery now but the battery we want to get is 12V 40Ah two places and we have inverter 24V but I want to ask that can the solar panels change the battery very well and can we be using the inverter 24 hours

  • @willchester3114
    @willchester3114 8 днів тому

    180 watts solar panel sir not volt

  • @subwayenergylimited
    @subwayenergylimited 21 годину тому

    You people need to be properly trained. You are mixing things up with assigning wrong ratings to the different components.
    Automatic carry over😂😂😂