Yamaha RD 350 LC Crankshaft Part 2

Поділитися
Вставка
  • Опубліковано 31 жов 2022
  • Part 2 shows the inspection of the centre section to evaluate the condition of the inner main bearings and labyrinth seal area, in this case both middle shaft and seal are damaged and need replacing, as do the big end pins which means a complete centre section is reuired, the two outer webs are fine to be used again their threaded ends usable.
    In part 3 we will concentrate on rebuilding and truing the parts using industry standard tools and gauges and a bit of persuasion.
    Thanks for looking.
  • Авто та транспорт

КОМЕНТАРІ • 5

  • @TurbodanNM
    @TurbodanNM 2 місяці тому

    I think ill give it a shot with this 400 crank I've got here. Not a bad job from the looks of it.

  • @Gege-md9kg
    @Gege-md9kg Рік тому

    Good video for repair hello how many pressure have tour press for these job Thank

    • @daviddanielstephenson2833
      @daviddanielstephenson2833  Рік тому +1

      Hi, the press is a decent quality20 Ton unit with a set of dedicated pin set and ram socket and can go a little more at a push, most cranks use about half of the range, the secret is to use tooling that stops any flexing, a firmer support helps to get the pins out easier without any sudden jumping.
      One often finds that some of the smaller cranks are harder to remove their pins, if you get flexing it can damage things which will show in the balancing up later.

    • @Gege-md9kg
      @Gege-md9kg Рік тому +1

      @@daviddanielstephenson2833 ok lot of thanks

    • @marcoserra3798
      @marcoserra3798 Рік тому

      Impressive!!how many times a crank can be rebuilt?