Swingset Bases and Playset Foundations: How We Build Them at Site Prep

Поділитися
Вставка
  • Опубліковано 15 січ 2025

КОМЕНТАРІ • 15

  • @SteffanFehrenbach
    @SteffanFehrenbach Рік тому +2

    It would be a nice touch to put a soft bezel on the upward edges of all top boards so all edges of wood are soft, making rounded edges vs. 90 degree edges, just a thought. Very thorough job, well done.

  • @stevenardiello3005
    @stevenardiello3005 9 місяців тому

    What do you anchor the play set to with the rock sub base?

  • @oneshotgrow
    @oneshotgrow Рік тому +1

    How much does something like this job cost?

    • @site-prep
      @site-prep  Рік тому

      Here is the link where you can get a free quote. Thank you.

  • @cbooboo59
    @cbooboo59 8 місяців тому

    What kind of mulch or wood chips did you use?

  • @Eddy-hi1nj
    @Eddy-hi1nj 8 місяців тому

    What kind of fabric did you use?

  • @chrisf8143
    @chrisf8143 7 місяців тому

    what is "stabilization fabric" please?

  • @matthewslayton189
    @matthewslayton189 2 роки тому

    Great video! So how does it drain? Through the rock and under the pressure treated lumber?

    • @site-prep
      @site-prep  2 роки тому

      Hi Matthew,
      Water can drain straight through the crushed stone and into the ground below.

  • @masonludgate6413
    @masonludgate6413 2 роки тому

    Did yall compact the stone at all before putting down the fabric?

    • @site-prep
      @site-prep  2 роки тому +1

      The stone we use (3/4" clean) is about 95% compacted straight from the truck. So we don't always compact it, especially if it's not the top layer.

  • @str0wz629
    @str0wz629 Рік тому

    You guys ever do a pool pad?