ESP - North Tower - Steel Crown - Elbow Installation - MID 2018

Поділитися
Вставка
  • Опубліковано 9 вер 2018
  • I've been working as a Qulity Control Engineer at Emaar Square Project for 4,5 years now.
    North Tower Construction is a part of Emaar Square Mall & Residances project. Which we started to build at 2015 and about to complete the steel & concrete works of total 50 floors at 2018. Now we are about to finish the installation of steel crown. Hope you enjoy the video.
    These videos were being published to become an unforgettable memory to whom served this project long or short periods. Nothing related with the employer company (Emaar).
    Here some short facts about the organisation:
    Employer : Emaar Turkey
    Project Management : Time - Turner
    Structral Cons : Erdemli
    Architectural Cons : 2Design
    3rd Party Quality Control : PGM
    Main Contractor : Tav-Sera Joint Venture
    2nd Party Quality Control : Paskal Engineering
    Steel Works Sub-Contractor : Mim / ANKA Engineering
    Facade Works Sub-Contractor : Aygün Engineering
    Total Height : +299,99 m above sea level
    Total Floors : +50 above -11 ground
    Special thanks to our media coordinator Galip YAKINAY which has the most effort in creation of this video. 👏