  • @Engr.abidislam
    @Engr.abidislam Місяць тому +1

    Very informative

  • @adnanmalik7900
    @adnanmalik7900 2 місяці тому +1

    Can u give the detailed video on fencing work along with the aramco standard

  • @SebuAli-n3s
    @SebuAli-n3s 20 днів тому +1

    Sir road construction me
    Subgrade layer
    Cbr, omc fdt Procter test
    Ye test ke liye kaun sa code use krte
    Building Construction me
    Reinforcement, formwork concrete ke liye kaun sa code use krte hai
    Saudi arbia me

    • @2iconstructions918
      @2iconstructions918  20 днів тому

      @SebuAli-n3s Dear brother, we've compiled a document with video links for ~80% of our site activities! Download link here for easy access. Each video includes detailed intro & reference docs. 😊 #Document #Videos #Links #Reference #Collaboration
      drive.google.com/file/d/1xhsnc7ISJZMfaBFUz4tuYUpR3KvYoTCr/view?usp=sharing
      Exciting Update for 2i Constructions Viewers!
      We’ve compiled all of our UA-cam video links into a single, easy-to-navigate PDF for your convenience. Simply download the file, scroll through to find the topic you're interested in, and click the corresponding link to access the video directly.
      Please note, this is an early version of the file and may still need further organization. However, we’re working hard to improve it! We're also creating more focused playlists, so you can easily find the content that suits your needs.
      The PDF is divided into four sections, ranging from beginner to advanced levels, making it easy for you to progress through your learning journey at your own pace.
      At 2i Constructions, we are committed to supporting your career development. Thank you for your continued love and support!
      Best wishes for your career growth

  • @adnanarshid5648
    @adnanarshid5648 8 днів тому +1

    Please correction as per SAES-Q-006.
    Base course class A 100% passing sieve# 2.5 inch
    Base course class B 100% passing sieve# 1.5 inch

  • @prabinraj6673
    @prabinraj6673 Рік тому

    Kindly recheck the sieve size of base course material,as per standard requirement it stats that Class-A 2.5inch(100) & 2 inch (90-100)and Class-B 1.5 inch(100) & 1 inch(60-100)

    • @2iconstructions918
      @2iconstructions918  Рік тому

      Thank you brother for your comment... I will check and respond you accordingly...
      Its really nice of you to watch our videos in such concentration... Thank you very much for rectification...

  • @muhammadfaraz2649
    @muhammadfaraz2649 Рік тому +1

    Brother you said moisture content for sub base and base course 1. 5%. but for subgrade value?

    • @2iconstructions918
      @2iconstructions918  Рік тому +1

      Kindly check their related SAIC for further details...
      Or let me know we will check and respond you accordingly...

  • @SebuAli-n3s
    @SebuAli-n3s 19 днів тому

    Sir
    Slab beam column foundation
    Me Kaun sa use code use krte only code number bata dijye

    • @2iconstructions918
      @2iconstructions918  19 днів тому

      Regarding Aramco's formwork, rebar, and related activities under SAES-Q-001, we utilize ACI 347 for formwork, ACI 301 for concrete specifications, ACI 315 for steel bar detailing, and other relevant standards.

  • @HaiderHussain-k7n
    @HaiderHussain-k7n 11 місяців тому +1

    Brother the tolerances you mentioned that's not in width that's all tolerance is applicable in elevation as per ifc

    • @2iconstructions918
      @2iconstructions918  11 місяців тому

      Thank you for your comment.
      Can you please elaborate a bit more..

    • @HaiderHussain-k7n
      @HaiderHussain-k7n 11 місяців тому

      For example we are at sub base layer and the elevation as mentioned the final finished grade level and existing ground level mentioned by that particular level a surveyor calculate each layer elevation according to that ifc drawing so in survey report they will mention the actual elevation compare with design elevation and the difference between them so we can check there a tolerance

  • @saleemasghar4530
    @saleemasghar4530 8 місяців тому +1

    Assalamu Alaikum sir
    I hop you are good.
    Sir what is responsibilities in road civil inspector

    • @2iconstructions918
      @2iconstructions918  8 місяців тому +1

      Same as other Civil QC inspector.KEY RESPONSIBILTIES:
       Ensuring project quality objectives have met according to engineering standards & specifications. (Aramco, ACI, ASTM)
       Preparation of RFI / WIR for specific activity stepwise.
       Issuing NCR (Non Conformity report).
       Ensuring material received meet the project standards and specifications.
       Review of IFC (Issued for Construction) drawings.
       Monitor the execution of civil works performed at site and ensure the implementation of the approved drawings and standards.
       Coordinate with technical engineering team to ensure that the work is executed as per the approved drawings and project specifications.
       Receiving of materials on site as per the approved submittal and engineering standards.
       Assisting Site Supervisor to review locations of existing utilities for possible conflict & relocation.
       Maintain contact with civil engineering and Procurement department to ensure an up to date knowledge of materials and techniques.
       Attending meeting for review of work procedures for continual improvement.
       Maintain continual communications with all personnel assigned to the project.
       Examine and inspect work progress, equipment and construction sites to verify safety.
       Evaluate and resolve any discrepancies and problems arising during construction Which affect the quality of works performed.
       To work as a link between the upper management and site staff.
       Provide on-going assessment of work quality within the procedure laid down along with having the necessary documentation, reports and handover submittals.
       Inspection and Test plan (ITP’s) and reporting documents for Client approval and to implement accordingly.
       Maintain a good working relationship with the Client and earn respect through a professional approach and a quality-controlled performance.
       Schedule, coordinate and supervise witness inspection and testing.
       Provide on-site quality control inspection staff in order to ensure that work can be implemented on a continuous basis within strict compliance of Clients quality requirements.
       To put in place Standard Operating Procedures for all activities within the department.
       Reviewing the drawings, project specifications and engineering standards to prevent non- conformities on project.

    • @saleemasghar4530
      @saleemasghar4530 8 місяців тому +1

      @2iconstructions918 sir my question about road q c responsibilities?

    • @2iconstructions918
      @2iconstructions918  8 місяців тому

      @saleemasghar4530 dear brother, Nature of the activity is different while 🚦raising inspection requests🚦Recording non conformities 🚦Reviewing IFC and other drawings 🚦preparation of the itp and checklists if required 🚦Coordinating with construction and higher management etc etc