Hose: Deploy 1.75" preconnect

Поділитися
Вставка
  • Опубліковано 11 тра 2020
  • Objective: Deploy 1.75” preconnect with V-Split method.
    Task Steps
    1. FF chooses correct hose at the order of the engine’s officer.
    2. FF places the attack section onto the right shoulder, making sure it is balanced.
    3. FF steps forward and turns to the left, grabbing bights from the supply section.
    4. FF pulls supply section, clearing the hose tray.
    5. FF continues stretching the supply section toward the target and around any obstacles, until complete.
    6. FF deploys the attack section using the V-split method.
    7. FF calls for water, bleeds line, checks for stream quality and appropriate flow, giving the engineer time to set the proper pressure.
  • Розваги

КОМЕНТАРІ • 11

  • @willshowman4575
    @willshowman4575 2 місяці тому +1

    *clicks on video*
    *gets out of truck with no gloves*
    *Clicks off*

  • @jessnunez7556
    @jessnunez7556 4 місяці тому +3

    am I the only one who does not like to see the SCBA mask flopping around?

  • @ohhoneybadgerbaby
    @ohhoneybadgerbaby 8 місяців тому

    Love the idea of using straps. Keeps the hose clean

    • @JohnLovatoJr
      @JohnLovatoJr  8 місяців тому

      One of our Captains instituted that. It works great.

  • @jangoig8882
    @jangoig8882 4 роки тому +1

    Very impressive. The drills are very beneficial

  • @randygarza186
    @randygarza186 3 роки тому +1

    What style hose load are you utilizing?

  • @Xanthopteryx
    @Xanthopteryx 9 місяців тому

    Time to start using high pressure hose reels. From arrival, you can have water spraying within 20 seconds. And much more easy to handle - both deploying, using and packing up.