one more doubt sir during loading of machine suppose machine runs on load controller and load is 450MW in 500mw capacity and error occurred in load controller, the output of load ctrl o/p will be -10 at that time m/c will come on speed ctrl .will M/C survive on that moments as speed control o/p is 11and load ctrl o/p is 70.
during rolling and before synchronisation machine follows speed controller mode and load ctrl. track the speed control o/p.If error occurs in speed controller can we roll the machine on load controller?
Please share the lecture presentation sir.. your explanation was excellent..
Please upload all classes of governing
one more doubt sir during loading of machine suppose machine runs on load controller and load is 450MW in 500mw capacity and error occurred in load controller, the output of load ctrl o/p will be -10 at that time m/c will come on speed ctrl .will M/C survive on that moments as speed control o/p is 11and load ctrl o/p is 70.
good explanation
Sir, How dN/dt rate of turbine is calculated?
during rolling and before synchronisation machine follows speed controller mode and load ctrl. track the speed control o/p.If error occurs in speed controller can we roll the machine on load controller?
at that time what will be the o/p of load controller as it follows the speed controller .
Nice lecture
Keep watching
Why speed mod final output set in 29 percent
Thank so so much sir 🙏🙏🙏. Pls upload one videos on CMC, BFM,TFM.
Superb class, Please upload the other videos of EHTC lecture,🙏
Will upload soon
Any information about the teacher who is explaining here?
Hemanta Patra Sir
4*250 Jindal power Plant, Tamnar, Raigarh