Terrain Modification in HEC-RAS Part 4: Bridge Decks with Glitterbeard

Поділитися
Вставка
  • Опубліковано 8 лис 2024

КОМЕНТАРІ • 5

  • @stanfordgibson
    @stanfordgibson 4 роки тому +2

    Nice terrain Krey...and beard.

  • @simonhsu2375
    @simonhsu2375 3 роки тому +1

    Smart way!

  • @vahidmohammadian3632
    @vahidmohammadian3632 3 роки тому

    very useful thank you

  • @nbrahmareddy7690
    @nbrahmareddy7690 3 роки тому

    Hello Users, I just need some insights on Breaklines.
    I have added breaklines into the 2d mesh area and enforced them as internal connections and entered weir data as top spillway elevation at 700m to the connections assuming they are acting as Embankments/weirs to the reservoir.
    But After I ran the Unsteady flow model successfully, in the results section in the RAS Mapper Water still flowing over the embankments at 653.55 only without filling the reservoir up to 700m elevation.
    What Should I do?
    Thank you in Advance
    #HECRAS #2dMODELING

  • @islamrashed1
    @islamrashed1 3 роки тому

    In part 3 video you changed the terrain in the cross-section to make changes, but in this one, you didn't change the cross-sec at all???