When GWR ran to London Euston!

Поділитися
Вставка
  • Опубліковано 23 січ 2025

КОМЕНТАРІ • 7

  • @adamcutts2174
    @adamcutts2174 2 місяці тому +3

    I noticed they're using diesel mode instead of electric mode despite Euston station being electrified and the similar Avanti 805s and 807s though

    • @shugieshugied2269
      @shugieshugied2269 2 місяці тому +1

      I'm not sure of the route they would follow to get back onto the Paddington-Reading line, but some of it may not be electrified, so diesel mode could be needed for that.

    • @JimH24
      @JimH24  2 місяці тому +1

      @@adamcutts2174 Part of the diversion route is not electrified. They are probably not cleared to run on electric on the WCML either.

    • @stephen2844
      @stephen2844 2 місяці тому

      The connection at Acton is not electrified. I travelled out of Euston on one of these. We were on diesel power until just before Ealing Broadway on the down relief.

  • @ACELog
    @ACELog 2 місяці тому

    Looking at google maps, I'm guessing they were linking up via Willesden Junction?

    • @JimH24
      @JimH24  2 місяці тому +1

      @@ACELog Yes, that's correct.

  • @Liamtrainspotter40
    @Liamtrainspotter40 2 місяці тому +1

    The great western mainline isnt closed, paddington is just closed due to engineering works