"Good Mix Of Vehicles Departing" Tesla Gigafactory Texas 10/17/2024 9:41AM

Поділитися
Вставка
  • Опубліковано 22 жов 2024

КОМЕНТАРІ • 16

  • @BTSflyer
    @BTSflyer  6 днів тому +4

    Please Like and Subscribe to this channel. Click the bell for notifications.
    Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER6A4

  • @pauldelrossi2582
    @pauldelrossi2582 5 днів тому

    Thanks!

  • @hollywoodkw3206
    @hollywoodkw3206 6 днів тому +6

    Thank you! Great videography. Still enjoy your music selections.

    • @MJ-zo5gb
      @MJ-zo5gb 5 днів тому

      Yeah ❤ the music.

  • @rollincampbell1
    @rollincampbell1 5 днів тому +1

    Nice video! Thank you!

  • @stephenreeves21
    @stephenreeves21 5 днів тому +1

    Excellent Brad thanks again!

  • @lourdessilva6442
    @lourdessilva6442 4 дні тому

    Incrível esse documentário

  • @benguthrie49
    @benguthrie49 5 днів тому +1

    Thanks Brad.

  • @DavidJohnson-tv2nn
    @DavidJohnson-tv2nn 6 днів тому +3

    Thanks Brad!
    South expansion - westside:
    @ 3:31 Excavation to finish the perimeter grade beam across the gap. We will soon lose our view.
    Substation expansion project:
    @ 12:16 Installation work for the new 345 kV switches. I think the switches themselves have been temporarily moved to 12:09 (right) between the trailer and the fence?
    Note: the ground wires grounding the work vehicles.

  • @andreandre1051
    @andreandre1051 5 днів тому +2

    Merci👍👍👍

  • @WilliamBusuttil
    @WilliamBusuttil 5 днів тому +1

    18-10-2024.
    Thank you Brad, more pretty please.😊

  • @DessieDoolan
    @DessieDoolan 6 днів тому +4

    Thanks Brad.
    *Sort by Newest First or Top Comments if only the first few lines are visible*
    1:08. Southend, east. Tank farm, Level 1. Bottom right. Insulated pipework enters the ground.
    2:00. Southend, east. Level 1. Left. Retaining wall concrete placement. Frames for 2 x double pedestrian doors, and a roll-up door behind.
    Right. Bulk insulation to the delivery bay wall.
    Top. White insulated pipe originates at 1:08.
    2:16. Southend, south. Fire Escape Passages. Concrete ramps complete.
    3:22. Southend, west. Excavating to complete the perimeter grade beam. Might loose the view in through that gap also.
    4:46. Westside, storage. Top centre. Gradeworks, and an office trailer delivery. A new contractor yard perhaps. New permit for Stamping 2 Hot Stamping 2. Blue wrapped items adjacent are speculatively that press.
    Triangular storage yard. 3 transformers being delivered.
    5:18. Westside. Triangular storage yard. 70 Prolec transformers by my count.
    6:16. Westside, Sand Hill Lateral Pipeline project. Bottom. Good view of the reamers.
    6:45. Westside, Tunnel Project. 8 bored shafts. Pile footing for a small structure?
    8:12. EOL, Transport yard. Permanent power supply to the office being connected.
    12:15. New switchyard/substation. New framework matches existing.
    12:53. Tesla Road, west. Fresh asphalt.
    15:25. Casting, diagonal corner. Apron. Bottom left. Another furnace tender vehicle. Appears to be the yellow one.
    15:33. Casting, Baghouse structure. Internally lined duct being installed through the wall. Aiming for the heat-exchanger.
    15:50. BIW, apron. Text-book 80/20 rule example. There’s always 20% to be completed.

  • @memrjohnno
    @memrjohnno 6 днів тому +1

    Wonderful, cheers mate. I'm hoping for a seriously strong Q4 and so far so good.

  • @hedgefund996
    @hedgefund996 6 днів тому +1

    Awesome Video Salute 🫡

  • @MJ-zo5gb
    @MJ-zo5gb 5 днів тому

    Soooo what exactly is going to be made on the new south end? (Besides the super computer)

  • @stephenreeves21
    @stephenreeves21 5 днів тому +1

    Thanks!