How to Make a Gantt Chart in Excel with Progress Bars (actual, planned & percentage completed)

Поділитися
Вставка
  • Опубліковано 19 лис 2024

КОМЕНТАРІ • 225

  • @LeilaGharani
    @LeilaGharani  9 місяців тому

    Grab the file I used in the video from here 👉 pages.xelplus.com/gantt-chart-full-file

  • @edmundtumaca2334
    @edmundtumaca2334 3 роки тому

    Great Mentor, mam Leila Gharani. God bless you always.

  • @HockeyPurist
    @HockeyPurist 4 роки тому +1

    Outstanding video. You are my go to resource on UA-cam. Thank You for what you do!

  • @Sal_A
    @Sal_A 7 років тому +2

    Amazing! The Date formatting in charts is something I always had trouble with but you have helped unravel this mystery for me by not changing the serial numbers to actual dates...Very cool!

  • @mikeberoth9074
    @mikeberoth9074 2 роки тому

    Bravo! You are a guru. Thanks for presenting in such an understandable way.

  • @hernanperez912
    @hernanperez912 5 років тому

    Hands down best video on this topic in all the Web. Brilliant.. Thank you.

    • @LeilaGharani
      @LeilaGharani  5 років тому

      Thanks for the kind feedback Hernan! Glad you like the video.

  • @TheSsteiner
    @TheSsteiner 5 років тому +2

    Great chart! I like to add another series to the chart with a vertical error bar and an x value of =today() to help show how we are tracking to our plan each day. Excellent tutorial!

  • @Vade1313
    @Vade1313 6 років тому +9

    You are an Excel Goddess!!!!

  • @ozamutelele3247
    @ozamutelele3247 Рік тому

    I just love this woman😍

  • @adeyemikehinde18
    @adeyemikehinde18 2 роки тому

    Great presentation! Thank you Leila.

  • @carolburns3698
    @carolburns3698 3 роки тому

    Thank you for this video on Gantt charts. I'm a grad student and truly appreciate the breakdown in excel that you shared, and user friendly tips you provided.

  • @DmitryWhite82
    @DmitryWhite82 7 років тому

    It makes me feel at ease and smiling :) The reason is when you do need a fully dynamic Gantt Chart and such you just grab the dedicated planning software and do you job. But anyway, what I saw here is brilliant as usual. A piece of a trick for your prof scope in Excel. Thanx, Leila!

    • @LeilaGharani
      @LeilaGharani  7 років тому

      Thanks Dmitry. Yes, it's more for Excel geeks like me who like to limit use of other software :)

  • @gavintomlinson777
    @gavintomlinson777 3 роки тому

    This was great!! I've learn a ton from your You Tube Videos. Thank you.

  • @yatishprasad
    @yatishprasad Рік тому

    Superbly Explained.

  • @hattemghanoom9557
    @hattemghanoom9557 6 років тому

    Very creative presentation using very advanced Excel techniques.

  • @abdanomer
    @abdanomer 7 років тому +1

    Great as usual.
    Hope you are well.
    As a project manager I usually need to show the difference from actual and plan!
    I mean i should see them both at the same time to figure out if i within , behind or ahead from plan!
    This could be done by adding a series to the chart as I think.
    In addition what about using the conditional formatting to cells instead of chart ? What are the advantages and disadvantages? ( space or numbers of cells , colors for formatting, dynamic issues, ... etc)
    Keep up the good work.

    • @LeilaGharani
      @LeilaGharani  7 років тому +1

      Hi Abdelrahman,
      Thanks for your input. To get the graphs right beside or on top of each other, I would probably duplicate it - i.e. create one just for Actual - then duplicate and replace series with the plan one. To get them in one graph, I'd probably put them on top of each other - by taking away the fill color and possibly making the plan series more transparent so it doesn't distract too much from actual.
      Generally, I prefer to work with charts when I can - this way I have an object that sits on top of the cells - with conditional formatting cells method, I have to make sure the cell widths always remain the same, otherwise the visualization would be impacted....

  • @jayrichzhanra4988
    @jayrichzhanra4988 6 років тому +6

    Definitely an Excel Goddess!!!!

  • @susanmullett1091
    @susanmullett1091 4 роки тому

    Thank you for your videos. It's helping me to explore parts of Excel I wasn't coming across in my job but already I am excited to try out new techniques

  • @weblady14
    @weblady14 6 років тому

    Leila, I love you. Every video of yours is so insightful and superhelpful for my work:) Can't wait to set this up for a project of mine tomorrow. Thanks!

    • @LeilaGharani
      @LeilaGharani  6 років тому

      Glad you like the videos! Thanks for the support & the feedback :)

  • @chennasathya
    @chennasathya 3 роки тому

    Brilliant. Thank you Leila. I will use your idea to create one suitable for my work.

  • @dsetiya305
    @dsetiya305 3 роки тому

    Wow, this is Excellent tutorial. Thank You

  • @shijeshvijay
    @shijeshvijay 4 роки тому

    Very simple explanations, this much more helped for improving my excell skills

  • @shamilvp
    @shamilvp 7 років тому

    Thanks very very much. I just find this that very important for my job . I got ur channel in time. God bless to shared such useful knowledge with us. May Allah grand to more knowledge.

    • @LeilaGharani
      @LeilaGharani  7 років тому

      Thank you Salih. Appreciate the kind words. Glad to hear you find the videos useful for your job.

  • @KienNguyen-ks3vo
    @KienNguyen-ks3vo 4 роки тому

    Really really helpful. Thank you very much. I have subscribed, start watching other tutorials and look forward to more interesting ones.

  • @6thOCT_BKK
    @6thOCT_BKK 5 років тому

    Fully thank you for your video training that it is super useful to my jobs

  • @deepeshgole2848
    @deepeshgole2848 5 років тому

    Please make video on ... how to make gantt chart without use of chart. Thanks for sharing your awesome knowledge. my favorite mentor is Leila .

  • @jeeyan2024
    @jeeyan2024 5 років тому

    I just learned alot for free from your tutorial vids!

  • @vida1719
    @vida1719 7 років тому

    Leila, thanks for such amazing interactive Gantt Chart

  • @KameshwarChoppella
    @KameshwarChoppella 4 роки тому

    This is super helpful!

  • @gauravnitinmahajan
    @gauravnitinmahajan 3 роки тому

    Thank you 😊. This video helped me a lot

  • @rambdrchand6354
    @rambdrchand6354 6 років тому +3

    I appreciate the way you explained this in this vidio, it was great help though the formulas took long to understand,
    thanks expect more such vidios

  • @nikworld4066
    @nikworld4066 5 років тому

    so lovely. thanks Laila you are great teacher

  • @magdolinagomes6485
    @magdolinagomes6485 6 років тому

    Hello Leila, I watch and learn from most of your videos. It would be really great if you can upload another video of Gantt chart with resource allocation.

    • @LeilaGharani
      @LeilaGharani  6 років тому

      Hi Magdolina - thanks for your suggestion. Do you mean to simply add the person's name for each task to the chart or also be able to filter or highlight a person and get their tasks?

    • @magdolinagomes6485
      @magdolinagomes6485 6 років тому

      yes

  • @bellemabelmoche7245
    @bellemabelmoche7245 6 років тому +1

    Thanks Leila, really appreciate this. I love it!

  • @asafnb
    @asafnb Рік тому

    Wow so nice thanks a lot!

  • @Tasice08
    @Tasice08 5 років тому +2

    Excellent tutorial video, that's exactly what was i after

  • @MrsCathT
    @MrsCathT 4 роки тому

    Wow it really looks great, thank you!

  • @carloseduardofernandez4672
    @carloseduardofernandez4672 7 років тому

    Thank you...This week I'll show you to my teacher of "Organización y Estructura"

    • @LeilaGharani
      @LeilaGharani  7 років тому +1

      Thanks Carlos - appreciate the support.

  • @tarek.grisha
    @tarek.grisha 3 роки тому

    Thank you Leila

  • @Adam_K_W
    @Adam_K_W 5 років тому

    You're the best! I'd like to see your take on using a "Named Formula" within the Name Manager, where you create a new named item, that is just a formula so you can use that name as a shortcut to nest that formula within another. In the Microsoft Calendar Template, this is used as "JanSun1", "FebSun1, etc...

    • @LeilaGharani
      @LeilaGharani  5 років тому +1

      Many thanks for the feedback Adam. I'll think about it.

  • @MsArman12345
    @MsArman12345 2 роки тому

    fantastic!

  • @bharadhanenenu
    @bharadhanenenu 7 років тому +2

    Thank you very much.... that's a quick release of dynamic Gantt video as as per my request..... really helpful.... thanks again.....
    I also requested for dynamic map tutorial. it would be really great if you can upload dynamic map tutorial too..

    • @LeilaGharani
      @LeilaGharani  7 років тому +1

      You're welcome. Sure. Have already added it to my list - should be in the next weeks...

    • @bharadhanenenu
      @bharadhanenenu 7 років тому

      thank you very much......

  • @sonyjacobtc
    @sonyjacobtc 7 років тому

    This is "Grand"chart !!! explained simple way

    • @LeilaGharani
      @LeilaGharani  7 років тому

      "Grand Gantt Chart" - that's what I should have named it :). Glad you like it.

  • @craigvoss1468
    @craigvoss1468 7 років тому

    Great job. Your truly awesome.

    • @LeilaGharani
      @LeilaGharani  7 років тому

      Thanks Craig. Glad you like it :)

  • @karimtricks2155
    @karimtricks2155 7 років тому

    Brilliant as usual, thanks :)

  • @joelmarkcandido8553
    @joelmarkcandido8553 5 років тому

    well explain.. thank you and more power to you!!

    • @LeilaGharani
      @LeilaGharani  5 років тому

      You're very welcome. Glad you like it Joel.

  • @thesassywoman4168
    @thesassywoman4168 6 років тому

    Thank you so much for sharing!

  • @Shellboxx
    @Shellboxx 3 роки тому

    Great video! Really show what you did and how to make it yourself, however how would I change this to work by weeks instead of dates?

  • @dagwould
    @dagwould 3 роки тому

    I came to this from the more recent of Leila's gantt charts, all good instruction. I was just wondering about dependencies. That is, an activity starting at the completion of a predecessor, or even multiple predecessors. For just one predecessor, a simple calculation would do it, but if there is more than one? I guess a 'max' function of the identified predecessors. I'll get onto it and see what I can do.

  • @nbs8989
    @nbs8989 3 роки тому

    Super. Thank you. If we want to show both plan and actual together on the chart, can you please show that?

  • @mr_blue8208
    @mr_blue8208 7 років тому

    Hi Leila, great tutorial! Many thanks. I'm using Excel 2013. For some odd reason at min 6:51 I wasn't getting the same result, the chart came out odd every time. I've tried several options and eventually the only one that worked for me was to select the "Data Prep." table first and then the "Task" list. Many thanks.

    • @LeilaGharani
      @LeilaGharani  7 років тому

      You're welcome Ricardo --- hmmm interesting that Excel 2013 didn't pick it up. Glad you found a way :)

  • @felixabrahamabraham
    @felixabrahamabraham 5 років тому

    Thank you.

  • @ommenourel3ine186
    @ommenourel3ine186 4 роки тому

    Thank you

  • @thequietroom3991
    @thequietroom3991 3 роки тому

    Hi Leila, great tutorial, do you have any videos for adding dependency lines at all?

  • @msrana4469
    @msrana4469 4 роки тому +1

    Thanks for pivot table . Is there any table or chart regarding planing .suppose we have 100 acitvities and all activities time shedule is different .supose one activity schedule is after 35 days .so is there any provision excel by which we can get its alarm 5 days earliar and marked with different color.

  • @mr.unknown1449
    @mr.unknown1449 6 років тому

    Thank you so much. It's very helpful for me.

    • @LeilaGharani
      @LeilaGharani  6 років тому

      Glad to hear that. Thank you for your support.

  • @richardt874
    @richardt874 6 років тому

    Thank you It's really helpful

  • @akashmohite6231
    @akashmohite6231 3 роки тому

    Thanks for such awesome video saved me from my Boss ;but getting error while displaying graphs for actual & plan it is showing same graph ;for simple chart it worked

  • @jiyaadnaeem4802
    @jiyaadnaeem4802 6 років тому

    This is great thank you!

  • @peterhontaru5537
    @peterhontaru5537 6 років тому

    Fantastic video

    • @LeilaGharani
      @LeilaGharani  6 років тому

      Thank you! I'm glad you like it.

  • @yassersawaf3235
    @yassersawaf3235 7 років тому

    thanks, this was helpful ..... u just saved my life :)

  • @alessandrofrioli6978
    @alessandrofrioli6978 5 років тому

    Thank u very much, it's exactly that I need

  • @sridharpv9431
    @sridharpv9431 3 роки тому

    Leila, excellent narration and reference material. I am struck, while inserting the completion data. I am getting the completion information for plan data. Is this fine to show up. Thanks

  • @ImranAhmed-tt5zz
    @ImranAhmed-tt5zz 3 роки тому

    Thanks and it's awesome.. Can I show a actual abd planned in same chart

  • @h4niali
    @h4niali 4 роки тому

    Its good work , but its better if you can linked and dependant tasks

  • @magedmousa5511
    @magedmousa5511 3 роки тому

    excellent tutorial,
    How can I display Start & End dates on the tasks bar (like value)

  • @mahdin.2650
    @mahdin.2650 4 роки тому

    Hi Leila. Great video. Perfect speed, video and sound quality. The Task titles in the chart are out of alignment. How can I right align them?

  • @Jade3175
    @Jade3175 4 роки тому

    Wow!! Thank you. :) any way you can show us how to create a collapsed view of the planned durations + percent complete? I’m trying to show a row for each project (broken out by dependent phases/task) and which allows me to include multiple projects, 1 for each row. Dashboard format...you’re the best!

  • @jacquilow3445
    @jacquilow3445 7 років тому

    Wow, you are amazing, thank you!

    • @LeilaGharani
      @LeilaGharani  7 років тому

      Ohhh thank you Jacqui! Glad you like the video :)

  • @berniemarcham7392
    @berniemarcham7392 2 роки тому

    I love the video. Question, how would you go about adding the percentage inside the bar chart? I tried adding the labels but if is pulling the # of days.

  • @omega3li493
    @omega3li493 2 роки тому

    very nice

  • @alanfogarty1791
    @alanfogarty1791 4 роки тому

    Hi Leila my name is Alan! Thank you very much for the videos on Gantt charts with Excel. Nothing to difficult but the way you put yourself across was very good for me... simple and to the point, softly and no bravado! I have one question though if you could please help me? Where you changed the Y axis task name to include the (**WD) formulae to show number of the work days for each task in the description, how can I edit the formulae (syntax) to display only the (**WD) in RED BOLD text and, the rest of the task description in BLACK text? Sorry, I'm sure its very simple but I am a newbie! Thank you!

  • @flowcharttocodeconverter936

    Hi, great chart !
    Can it predict end date using % done job?

  • @watthanapongtabletasussran9788
    @watthanapongtabletasussran9788 7 років тому

    Thanks for very useful CLIP

  • @muhamedessawy3662
    @muhamedessawy3662 3 роки тому

    Amazing

  • @dodgecarlincila879
    @dodgecarlincila879 3 роки тому

    Hi Leila your videos are really awesome. It really helps me learn new things and polish the old ones. Regarding gantts, i have this scenario though, that instead of tracking days, im tracking sales per person on a time range. Is it possible to do it on gantts? Thanks! and More power.

  • @charliecaballero1977
    @charliecaballero1977 5 років тому

    This a great.....but can you show a bar chart showing actual dates start earlier.

  • @DINESHMaharjan-pe8mt
    @DINESHMaharjan-pe8mt 4 роки тому

    This is another excellent trick to draw a bar chart. Is it possible to link with one task to another as tasks are inter linked?

  • @hosseinhosseinpoor4845
    @hosseinhosseinpoor4845 3 роки тому

    thanks

  • @ginohendriks6803
    @ginohendriks6803 4 роки тому

    Thanks for the video. Is there a way to add dependencies in the gantt chart through arrows?

  • @anilkumar-pi6ep
    @anilkumar-pi6ep 3 роки тому

    Great explanation.. If i need to add dependencies which points through arrows between tasks? Will that be possible to create in excel?

  • @Shri32
    @Shri32 5 років тому

    Hi Leila, Thank you vrey much for the informative video, It helped a lot with office work.
    In my work, I have to sometimes hold some activities for some time and then again start after few days, so do you have something that can help me show it on gantt chart?

  • @ramanagoteti2574
    @ramanagoteti2574 6 років тому

    very nice explanation Leila, I liked very much. Can we also create reports with Excel?

  • @rasikasadaruwan7571
    @rasikasadaruwan7571 6 років тому

    Thanks leila

  • @wingame52
    @wingame52 3 роки тому

    Hi Leila. Tremendously enjoy your excel series. In an excel Gantt chart, is there way to display the current cumulative total percentage of the progress? Thank you for all the spreadsheet tutorials in your channels

  • @prateekchitambare9878
    @prateekchitambare9878 5 років тому

    Thanks a lot for the video very useful ! What if we have multiple countries in drop down instead of "plan" & "actual"? The if statement in the prep data won't work. How to set up the similar thing for multiple countries?

  • @junnelduluguin5324
    @junnelduluguin5324 10 місяців тому

    Hi Leila,
    Could we put a formula in column I (percentage completion)? If so, what would that be?

  • @nationalfoodauthorityagsd-9512
    @nationalfoodauthorityagsd-9512 4 роки тому

    Is it possible to put some vertical lines there?? just for visual guide.

  • @mehmetkaryagar898
    @mehmetkaryagar898 4 роки тому

    Hi Leila. You have around ten activities in your schedule. I want around a 100. And when i try to create the chart, only half of the Y axis activities are being shown. I made sure that "specify interval unit" is 1 under axis options. Could you please help me find a way around it?

  • @dennisroote9145
    @dennisroote9145 5 років тому

    Good Evening Leila, Your videos are well thought out, perfectly presented, very insightful. Question: If possible, how can this be modified to show the Critical Path?

  • @patrickkelly4845
    @patrickkelly4845 4 роки тому

    Leila I have a question is there a way to stop the green bar if you have completed the task early?

  • @nasasiradaniel8714
    @nasasiradaniel8714 2 роки тому

    Hey Leila.. Am a great fun n am becoming Excel pro coz u. I want to add completed percentage data label onto the garnet. My boss wants both colors.( completed n uncompleted) and percentage data labels onto the garnet chat already made

  • @LarsIngeHolen
    @LarsIngeHolen 4 роки тому

    Can you make it dynaminc to be able to select month and year? Maybe also be able to show different views, like daily, weekly and monthly?

  • @whatifsolutionsarefasterth2358
    @whatifsolutionsarefasterth2358 3 роки тому

    You should create Gant chart in office 365

  • @nationalfoodauthorityagsd-9512
    @nationalfoodauthorityagsd-9512 4 роки тому

    WOOOOOOOOW THAT WAS F*CKING AWESOME!!!!!!!!!!!!!!!!!!!!!! GOD BLESS YOU GIRL MAY GOD POUR YOU A MILLION BLESSING THIS WAS REALLY AWESOME THANK YOUUUU!!!!! (AND THANK YOU TO MICROSOFT TOO THE BEST THING THAT EXISTED HEHE)

  • @BarneyHorvath
    @BarneyHorvath 3 роки тому

    Thank you Leila! Is there an option to set the minimum and maximum values automatically, e.g. 30 days before the earliest date, and 30 days after the latest date? Can I reference these values when formatting the Axis Bounds Min/Max?

  • @Bijesh369
    @Bijesh369 5 років тому

    Thank you for sharing your knowledge. Really appreciate. I have enrolled for our course also in Udemy. Can you explain, how to show the break in the schedule.. for example the work is started and then there was a gap due to some issues and it resumed after a week. How to show the split like they show in MS project.

  • @Annichya
    @Annichya 2 роки тому

    The markers for planned dates are appearing far from the plan and progress bars , instead of appearing right beneath. How do I fix this?

  • @valerianverdy4546
    @valerianverdy4546 4 роки тому

    I'm using a TABLE format with header, i want to make headers with dynamic dates - can I do that?

  • @BenhurGiongo
    @BenhurGiongo 7 років тому

    Great graph as always!
    Is it possible to divide this chart to use only three days and breakdown to hours?