How to calculate Manpower / Manpower Calculations (Industrial Engineering)

Поділитися
Вставка
  • Опубліковано 25 сер 2024

КОМЕНТАРІ • 15

  • @learningspot9757
    @learningspot9757 Рік тому +1

    One part ki cycle time and no of parts produced per diya ho to no. Of machines kaise find kre??
    Please answer me as possible as fastly

  • @abhishekmehta763
    @abhishekmehta763 2 роки тому +2

    What does 100 stand for. 12 Hrs and 60 minutes per hour is understood

    • @sachinmaurya3259
      @sachinmaurya3259 2 роки тому

      do you also have PM exam tomorrow ?

    • @Shiven2824
      @Shiven2824  2 роки тому

      Sir 100 Stand for ‘100 Pieces’ study

    • @SD-un3ii
      @SD-un3ii 2 роки тому

      Multiplying by 100 is doubtful...

    • @Shiven2824
      @Shiven2824  2 роки тому

      @@SD-un3ii actually you are right boss its divided

    • @SD-un3ii
      @SD-un3ii 2 роки тому +2

      Actual formula for manpower calculation is " Line lead time/Takt time". Suppose if a production line have total four activities A,B,C and D. and time taken by them is 10 ,12, 13 and 15 minutes respectively . Now the total line lead time is 50 mins. Assume this line is purely labor based line then total manpower required to fill the demand of let's say 500 pieces in 8 hrs. Now total available time is 8*60 = 480 mins . So Takt time will be 480/500 mins, 0.96 mins. Now required manpower to meet the target of 500 pieces in 8 hrs is 50/0.96 = 52 People .