Structure Cost by Thumb Rule Method | Construction Cost of Building
Вставка
- Опубліковано 4 жов 2024
- Hello Friends,
This is an Very Important Video !!!
Structure cost using Thumbrule Method
Steel requirement Coefficient
RMC requirement Coefficient
Concrete requirement Coefficient
Shuttering requirement Coefficient
#structurecost #costing&budgeting #cosntructioncoefficient
*******************************************
Rate Analysis of Shuttering and Form work - • Rate Analysis of Shutt...
*******************************************
Piling Process at Site | Piling Foundation - • Piling Process at Site...
*******************************************
Roles and Responsibility of Billing Engineer - • Roles and Responsibili...
Basics of Civil Engineering
Basic Civil Engineering topics
.
.
.
.
.
#civilengineerblog #civil_engineering
#civilengineeringstudents
#civilengineeringworld #civil_engineer #civilengineeringstudent #structuralengineering #civilengineers
#civilconstruction #civilengineer
#engineeredlife #howtocrackcivilengoneeringinterview #civilengineeringtips #crackcivilengineerinterview
#indianengineer #civil_engineer #structuralengineeringoption #structural #siteengineer
#knowledge #beam #reinforcement #rebar #steel #scaffolding #reinforcementwastage #costing #budgeting #costing&budgeting #cost
DO SUBSCRIBE CHANNEL for New Videos.
I salute you for sharing useful knowledge with us .
I'm waiting for your next blog to share wonderful knowledge.
Thanks priya for your lovely words.
I appreciate, stay connected for more important videos :-)
Very knowledgeable content sir.
Thanks for the valuable comment dear
Best knowledge for site engineer
Thanks for your valuable comment
very informative !
Stay connected :-))
Thanks for making a video on this topic
👍👍
Important useful video clip.. Thanks sir.
Stay connected Tarun :-)
Very Informative Video
Thanks for the comment dear
Stay connected:-)
Best for site engineers 👍👍
Stay connected:-)
Thanks for sharing
Stay connected for more :-)
Helpful video 👍
Thanks chandan stay connected:-)
Nice video
Stay connected:-)
What should be the coefficients in case of an industrial building (RCC Structure min G+1)
It depends on the type of industry,
If high machinery is used over there, approx. 10 -12 kg per sq.ft. Is required
Sir, agr pure project ka nikalna hai to 6.5*10 lakh krenge. Lekin agr usi project ka sub structure nikalenge to vo 15* 10 lakh ho gya ye kaise hua sir. Means full structure ka steel aaya calculate krne pr 6500000kg lekin eski substructure me 15000000kg aayga ye to glt hua na
It’s calculated on the total area
MS project ka sir full link share kijiye plz
PLANNING VIDEOS !
ua-cam.com/play/PLIzMz6bJM6fM5bSVMdLAit-UbqTlt3E8r.html
This will help u out
@@BasicsofCivilEngineering Thank You sir