Rate Analysis of Shuttering and Form work | Shuttering Cost Calculation per sq.m.
Вставка
- Опубліковано 9 лип 2022
- Hi Everyone,
This is an Very Important Video !!!
In this Video, i will make you understand how to do rate analysis of shuttering work
Rate Analysis of Shuttering work.
Rate Analysis of Formwork.
#rateanalysis #shutteringwork #formwork
*******************************************
Types of Schedule in MSP | Levels of Schedule Level 1 - Level 5 | What are Schedule Levels ?
• Types of Schedule in M...
*******************************************
Roles and Responsibility of Billing Engineer | Billing Engineer Job Profile | Billing Engineer
• Roles and Responsibili...
*******************************************
RATE ANALYSIS OF PLASTER WORK AS PER CPWD || Rate Analysis of Plaster Work as Per Site
• RATE ANALYSIS OF PLAST...
Basics of Civil Engineering
Basic Civil Engineering topics
.
.
.
.
.
#civilengineerblog #civil_engineering
#civilengineeringstudents
#civilengineeringworld #civil_engineer #civilengineeringstudent #structuralengineering #civilengineers
#civilconstruction #civilengineer
#engineeredlife #howtocrackcivilengoneeringinterview #civilengineeringtips #crackcivilengineerinterview
#indianengineer #civil_engineer #structuralengineeringoption #structural #siteengineer
#knowledge #beam #reinforcement #rebar #steel #scaffolding #reinforcementwastage #rateanalysis #
DO SUBSCRIBE CHANNEL for New Videos.
Batten Calculations -
SIZE OF BATTEN - 2" X 3" X 8' = .05 X .75 X 2.4 M = .009 Cum
This is .075 Meter instead of .75m , its a typo error only ESLE calculation is absolutely correct.
Good Vid, Thanx. Could you please provide the Excel Sheet of the rate analysis?
Very informative video sir
Sir. Please share these rate analysis sheets. You have put on marvelous effort into these.
Sure Tanzeel 👍
Nice video Sir
Thanks buddy stay connected:-)
Helpfully video sir
Thanks Shekhar , stay connected:-)
👌👏
👍👍
Helpful video 👍
Thanks Adesh, stay connected:-)
Its really helpful sir 😅
Thanks Akash 👍👍
Please give rate analysis of rental and buy back options for reputed shuttering like Doka and perry
Ok, vl work & share soon .
The current labour rate for making is Rs.70/Sqm and Rs.220/Sqm for fixing .Pl correct the rate analysis accodingely.
This is based on ideal situation, if material price / labour price gets increase , price goes up & vice versa as well
Very informative video, sir plz can you share an excel sheet of the rate analysis .
Sure priya, my mail is is mentioned in the bio , send me a mail i vll revert on that .
@@BasicsofCivilEngineering thq sir for revert.
@@PriyaSharma25062 all the best !
Brother only material cost coming Rs70/- per sqft. And labour cost Rs50 to 60/- total per SqFT Rs130-140 running. And pls share support material for buying (my cal. For buy). Thank you
Need suttring
This actual rate analysis or asum
Can you share this,excel file to me
Please provide no of suttring contractor
Wastage of plywood should be added
Thanks for valuable comment 👍👍
Labour cost for shuttering 110rs/sqft isnt it too low
Rate may varies company to company, in my organisation its 107 per sq.m.
Also its 110 per sq.m not sq.ft.
Thanks for your comment.
Rs 110 per Sqft bro not Sq. Mtr.. (Men and material) , if available pls share contact number if contractor.
Sir aap nahi samja pa rahe ho calculations bahut jayada mistake hai
Sorry vedio nahi samaj aya